Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 23:35 26 Apr 2025
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 10/05/25 - BRTA Westbury
10/05/25 - Model Railway Show, Calne
13/05/25 - Melksham TUG / AGM
14/05/25 - West Wiltshire RUG

On this day
26th Apr (2016)
DOO strikes start on Southern (link)

Train RunningDelayed
20:03 London Paddington to Plymouth
20:20 Hereford to London Paddington
20:23 Portsmouth Harbour to Cardiff Central
20:30 London Paddington to Exeter St Davids
21:23 Portsmouth Harbour to Westbury
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 26, 2025, 23:47:23 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[121] Penryn to Melksham - summary and some pictures from 25.4.2025
[109] Standardisation of Time and the Railway Clearing House
[60] Intoxicated person plan needed on Tube - coroner, April 2025
[49] Grand Central applies for Newcastle–Brighton via North Downs
[44] Gloucester station needs an east-facing bay platform
[41] BBC TV Licensing - ongoing discussion
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Rail Regulator publishes principles for driver controlled operation  (Read 1216 times)
ChrisB
Transport Scholar
Hero Member
******
Posts: 13339


View Profile Email
« on: April 05, 2017, 13:19:31 »

From an ORR» (Office of Rail and Road, formerly Office of Rail Regulation - about) e-shot....

Quote
The Office of Rail and Road has today published safety principles it expects train companies to follow when rolling out and managing Driver Controlled Operation (DCO (Development Consent Order, or Driver Controlled Operation (that is, operation and dispatch of the train solely by the driver even with another member of staff on board), depending on context)).

Six high level principles have been drawn up in consultation with industry and the trade unions. They are designed as a framework for train companies who are considering introducing, or who are operating, DCO.

The Principles set out that DCO schemes need to be well planned, with appropriate implementation timescales and developed against a shared understanding of how to handle any issues which need to be addressed.

The Principles are part of the rail regulator’s overall approach to railway safety which helps train companies and their staff understand what is needed to comply with health and safety requirements. This is part of our ongoing work with industry to continuously improve the approach to all types of train dispatch.

Ian Prosser, HM Chief Inspector of Railways, ORR, said:

"ORR’s Principles are designed to give guidance to industry about how best to plan and implement driver controlled operation. The most important element is planning new arrangements well in advance, talking with staff and their representatives to address concerns and ensure they are informed about the progress of plans.

"These Principles reinforce our view that suitable equipment, proper procedures and competent staff must be in place for the safe implementation of driver control operation."
Notes to Editors: 1.Railway Safety Principles on driver controlled operation

Driver controlled operation describes the method of working where the driver is responsible for door operation and determining that it is safe to start the train. How the driver determines whether the train is safe to start will be dependent upon the method of train dispatch and whether the supporting risk assessment requires other safety critical staff to be involved.

The six high level principles are:

Where driver controlled operation is used or planned to be used:
•Trains need to be compatible with the platforms that they use and the method of operation at these platforms.
•Station platforms need to be compatible with the trains using them and they must support the methods of operation.
•The nature of the operation with the train and platform need to be assessed. This includes consideration of passenger needs and behaviour.
•Staff should be trained and competent.
•The implementation should be planned.
•The system should be managed through its whole life, with improvements adopted
2.Background
http://orr.gov.uk/news-and-media/press-releases/2017/orrs-work-on-train-dispatch-safety
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page