Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 17:15 10 Jan 2025
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 14/01/25 - Rail Sale starts
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end
24/01/25 - Bristol Rail Campaign AGM 2025

On this day
10th Jan (2017)
Defibrillators discussion pack published by Network Rail (link)

Train RunningCancelled
13:48 London Paddington to Carmarthen
14:35 London Paddington to Paignton
15:16 London Paddington to Cardiff Central
15:30 London Paddington to Weston-Super-Mare
15:52 London Paddington to Great Malvern
15:54 Cardiff Central to London Paddington
16:23 London Paddington to Oxford
16:30 London Paddington to Taunton
16:32 Great Malvern to London Paddington
16:36 London Paddington to Plymouth
16:59 Cheltenham Spa to London Paddington
17:00 Oxford to London Paddington
17:18 London Paddington to Swansea
17:50 Cardiff Central to London Paddington
Additional 18:10 Bristol Temple Meads to Gloucester
19:04 Paignton to London Paddington
19:04 Great Malvern to London Paddington
19:35 Exeter St Davids to London Paddington
Short Run
14:03 London Paddington to Penzance
14:20 Carmarthen to London Paddington
14:48 London Paddington to Swansea
15:28 Weston-Super-Mare to London Paddington
16:07 London Paddington to Didcot Parkway
16:34 Newbury to London Paddington
16:50 London Paddington to Didcot Parkway
17:15 Exeter Central to Barnstaple
17:20 London Paddington to Didcot Parkway
17:28 Weston-Super-Mare to London Paddington
18:29 Gatwick Airport to Reading
18:38 Barnstaple to Exmouth
Delayed
13:55 Paignton to London Paddington
15:03 London Paddington to Penzance
15:30 Bristol Temple Meads to London Paddington
15:59 Cheltenham Spa to London Paddington
16:12 London Paddington to Bristol Parkway
16:13 Exeter Central to Barnstaple
16:31 Barnstaple to Exeter St Davids
17:10 Slough to Windsor & Eton Central
17:20 Windsor & Eton Central to Slough
17:33 Barnstaple to Exeter Central
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 10, 2025, 17:19:11 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[103] Thames Valley infrastructure problems causing disruption elsew...
[98] Westminster Hall debate : Railway services to South West
[97] Ryanair sues 'unruly' passenger over flight diversion
[87] Mick Lynch announces retirement as head of RMT
[41] Birthday trip, Melksham to Penzance - 28th January 2025
[22] A Beginner's Guide to the Great Western "Coffee Shop" Passenge...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: 4 GWR coaches at Doncaster for power doors.  (Read 4552 times)
LiskeardRich
Transport Scholar
Hero Member
******
Posts: 3494

richardwarwicker@hotmail.co.uk
View Profile
« on: December 18, 2016, 19:41:57 »

4 GWR (Great Western Railway) HST (High Speed Train) coaches are currently at Doncaster works being modified with power doors etc for trial. An ex virgin coach also present being used as a design jig for the welding.
From an internal source it is hoped to be in service in September doing the daily Bristol Penzance 0600 start diagram. It will be extensively tested before any further coaches are converted.
Logged

All posts are my own personal believes, opinions and understandings!
devonexpress
Sr. Member
****
Posts: 294


View Profile
« Reply #1 on: December 23, 2016, 20:06:26 »

So another set albeit small going to have GWR (Great Western Railway) livery then?
Logged
Surrey 455
Hero Member
*****
Posts: 1269


View Profile
« Reply #2 on: December 24, 2016, 09:54:10 »

That testing must be extensive if it'll be 9 months before going back in service! Would it not be quicker to build a whole new train?
Logged
Rhydgaled
Hero Member
*****
Posts: 1500


View Profile WWW
« Reply #3 on: December 24, 2016, 15:35:21 »

Would it not be quicker to build a whole new train?
Probably not; the first class 800 was taken off the ship from Japan in March 2015, and it'll probably be March 2017 before the first one enters passenger service. If you had an existing train design coming to the end of a production run with free factory space to extend that production run then you might be able to turn out additional units faster, but a new design will always take some time to put into production and the factory needs capacity to built it etc.
Logged

----------------------------
Don't DOO (Driver-Only Operation (that is, trains which operate without carrying a guard)) it, keep the guard (but it probably wouldn't be a bad idea if the driver unlocked the doors on arrival at calling points).
rogerw
Global Moderator
Hero Member
*****
Posts: 1381



View Profile
« Reply #4 on: December 24, 2016, 18:02:18 »

This is also probably a test bed for the propoed Scotrail conversions
Logged

I like to travel.  It lets me feel I'm getting somewhere.
Surrey 455
Hero Member
*****
Posts: 1269


View Profile
« Reply #5 on: December 24, 2016, 18:07:56 »

Just out of interest, are they likely to be installing retention tanks in the toilets?
Logged
Rhydgaled
Hero Member
*****
Posts: 1500


View Profile WWW
« Reply #6 on: December 26, 2016, 18:02:44 »

Just out of interest, are they likely to be installing retention tanks in the toilets
Not sure if the Doncaster work includes the toilets or not (it might), but I'm pretty sure I've read that, at some point before 2020, the retained IC125s for both GWR (Great Western Railway) and ScotRail will be fitted with retention tanks. While I don't think it is a legal requirement, I think I've read that efforts are being made to ensure all TOC (Train Operating Company) stock in use from 2020 doesn't dump toilet waste on the track.
Logged

----------------------------
Don't DOO (Driver-Only Operation (that is, trains which operate without carrying a guard)) it, keep the guard (but it probably wouldn't be a bad idea if the driver unlocked the doors on arrival at calling points).
TonyK
Global Moderator
Hero Member
*****
Posts: 6594


The artist formerly known as Four Track, Now!


View Profile
« Reply #7 on: December 26, 2016, 22:55:06 »

Probably not; the first class 800 was taken off the ship from Japan in March 2015, and it'll probably be March 2017 before the first one enters passenger service.

That delay is as much to do with infrastructure as vehicle, I reckon.
Logged

Now, please!
Rhydgaled
Hero Member
*****
Posts: 1500


View Profile WWW
« Reply #8 on: December 27, 2016, 09:30:57 »

Probably not; the first class 800 was taken off the ship from Japan in March 2015, and it'll probably be March 2017 before the first one enters passenger service.

That delay is as much to do with infrastructure as vehicle, I reckon.
Is it a delay though? I can't remember the original date the first one was meant to be in service anyway. I read in Modern Railways that some electrical problem (interference?) had been encountered when testing 800s being Reading and Didcot but Hitachi were claiming they were still on schedule despite this, which suggests it was always the plan to put the first one into service in 2017. I might be wrong though.
Logged

----------------------------
Don't DOO (Driver-Only Operation (that is, trains which operate without carrying a guard)) it, keep the guard (but it probably wouldn't be a bad idea if the driver unlocked the doors on arrival at calling points).
TonyK
Global Moderator
Hero Member
*****
Posts: 6594


The artist formerly known as Four Track, Now!


View Profile
« Reply #9 on: December 27, 2016, 09:35:41 »

Is it a delay though? I can't remember the original date the first one was meant to be in service anyway.

It depends which report you read. It seems to have been a bit of a movable feast, but that is always the way with big projects. In the early days, I seem to recall thinking that I would get work to pay for a trip on one of the first IEP (Intercity Express Program / Project.) trains to run under wires from Temple Meads. I have now been retired for 6 months.
Logged

Now, please!
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page