Some pictures of the crossing - as of last Friday (24th January 2020).
Where there were open fields across the railway line from the Oldfield Park housing area (where I was standing to take the first photo), there is now ongoing construction of those 300 (was it?) new houses. I hear there is concern about the use of this crossing from the new housing to a primary school which is in the area (or accessed through) Oldfield Park

The second photo is taken from across the line (in front of those temporary construction buildings of the previous photo) and shows the crossing protection now in place and switched on.

The path which used to run almost straight ahead though what's now the building site has been diverted to a narrow fenced band between the railway and the site. Although the rail crossing itself if wide, clean, slip-free, this diverted path is pretty messy - I would describe its condition as "unusable" except it is very clearly used by a considerable number of people, but maintained by none, judging by its awful condition.
