the re-control of the Bristol Power Signal Box area (excluding Bristol South) signalling to Thames Valley Signalling Centre in line with the National Control Centre Strategy
I am a member of a couple of signalling-related forums and it seems that the timescale for this national
ROC▸ (Rail Operating Centre) idea. It came to my attention on one forum last week that the resignalling of the Medway Valley (Kent) line between Cuxton, Aylesford and Wateringbury to East Kent
SCC‡ - which, I believe, was supposed to have been done recently in connection with Phase 2 of the recontrol work - has been put back by several years, possibly to 2024-2029 at the earliest.
Of course that just excludes it from this project, so it may be done in another - odd though that might seem, since it would presumably have lower priority.
The whole of the area south of Bristol all the way to Penzance is eventually supposed to be passing to
TVSC» (Thames Valley Signalling Centre) at Didcot which will, I believe, eventually be renamed as the West of England ROC. I believe Devon and Cornwall are due to be done around 2017 - 2020 though I suspect that will probably slip.
In terms of the transfer of the Bristol Parkway / Filton / Westerleigh area to the TVSC I was at Clifton Down station this evening and noticed that there is, as I think we already knew, a closure of the lines from Bristol Parkway to Filton, Temple Meads, Severn Tunnel and Westerleigh Junction for Saturday 28th to Monday 30th May inclusive. I note, however, that buses will replace trains Bristol Temple Meads to Severn Beach for Saturday 27th to Monday 29th August inclusive. Perhaps the works for May are simply preparation for the recontrol of Bristol Parkway, Filton and Westerleigh while the commissioning date will indeed not be until August? Saying that I heard from someone connected with
GWR▸ that the commissioning date is indeed the May weekend. I guess we just wait and see.
For anyone interested in how the Thames Valley SCC looks there are pictures here of the building, along with some of the workstation screen layouts:
http://photos.signalling.org/index?/category/205-thames_valley_scHTIOI,
Dave