Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 10:55 20 Apr 2025
 
- Oldest serving US astronaut returns to Earth on 70th birthday
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 10/05/25 - BRTA Westbury
10/05/25 - Model Railsay Show, Calne
13/05/25 - Melksham TUG / AGM
14/05/25 - West Wiltshire RUG

On this day
20th Apr (1789)
Opening of Sapperton Canal Tunnel

Train RunningCancelled
09:47 Penzance to Plymouth
09:55 Bristol Parkway to London Paddington
10:36 Paignton to London Paddington
10:49 Cheltenham Spa to London Paddington
12:30 Swindon to Cheltenham Spa
13:30 London Paddington to Bristol Temple Meads
14:00 Cheltenham Spa to Swindon
15:09 Liskeard to Looe
15:29 Swindon to Cheltenham Spa
15:40 Plymouth to Penzance
15:41 Looe to Liskeard
17:00 Cheltenham Spa to London Paddington
17:09 Weston-Super-Mare to Severn Beach
17:16 Bristol Temple Meads to Severn Beach
17:30 London Paddington to Bristol Temple Meads
17:37 London Paddington to Swansea
17:48 Bristol Temple Meads to Weymouth
18:00 Cardiff Central to Taunton
18:01 Severn Beach to Bristol Temple Meads
18:15 Penzance to Plymouth
18:35 Severn Beach to Bristol Temple Meads
19:43 Swindon to Westbury
20:00 Bristol Temple Meads to London Paddington
20:09 Portsmouth Harbour to Cardiff Central
20:11 Weymouth to Bristol Temple Meads
20:17 Taunton to Bristol Temple Meads
21:39 Bristol Temple Meads to Gloucester
22:45 London Paddington to Bristol Parkway
23:12 Bristol Temple Meads to Weston-Super-Mare
23:49 Weston-Super-Mare to Bristol Temple Meads
Short Run
08:01 Weymouth to Cardiff Central
08:15 Penzance to London Paddington
08:47 Penzance to Cardiff Central
09:09 Portsmouth Harbour to Cardiff Central
09:22 Bristol Temple Meads to Portsmouth Harbour
09:46 Exeter St Davids to Cardiff Central
10:00 Cardiff Central to Taunton
10:25 Cardiff Central to Portsmouth Harbour
10:55 Cardiff Central to Penzance
10:57 Paignton to Exmouth
11:25 Okehampton to Exeter Central
11:25 Cardiff Central to Portsmouth Harbour
11:41 Swindon to Weymouth
11:50 Penzance to Cardiff Central
11:57 Cardiff Central to Exeter St Davids
12:09 Portsmouth Harbour to Cardiff Central
12:26 Exmouth to Paignton
12:34 Exeter Central to Okehampton
13:16 Taunton to Cardiff Central
13:25 Cardiff Central to Portsmouth Harbour
14:09 Portsmouth Harbour to Cardiff Central
15:00 Cardiff Central to Penzance
15:35 Severn Beach to Weston-Super-Mare
16:18 Penzance to London Paddington
16:25 Cardiff Central to Portsmouth Harbour
18:00 London Paddington to Penzance
18:11 Castle Cary to Swindon
19:39 Bristol Temple Meads to Worcester Shrub Hill
20:30 London Paddington to Weston-Super-Mare
20:30 Cardiff Central to Portsmouth Harbour
21:57 Worcester Shrub Hill to Bristol Temple Meads
Delayed
08:30 Exeter St Davids to London Paddington
etc
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 20, 2025, 11:12:57 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[102] Fortuitous connections ... and an App which fails to offer the...
[80] RNLI station celebrates 10 years of saving lives - Portishead,...
[74] FOSS and FOSW validity - some quirks
[73] St Erth station - facilities, footbridge, improvements, incide...
[56] Eyesight rules for motorists unsafe, says coroner
[56] Fifteen years of the Transwilts CRP
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 4 5 [6] 7
  Print  
Author Topic: Electrification - so Cascade - so congestion easing - delayed.  (Read 43998 times)
stuving
Transport Scholar
Hero Member
******
Posts: 7425


View Profile
« Reply #75 on: December 09, 2015, 10:52:44 »

It looks to me that the embarrassment factor of having trains doing nothing has distorted the planning for the delayed "new GW» (Great Western - used as an abbreviation for the area / lines under the Great Western franchise, as opposed to FGW which includes "First", the company operating them too. For tickets - about)", especially if it is seen as specific to the way the IEP (Intercity Express Program / Project. This will offer more capacity on routes, save money, give a consistent and safe service and meet customer requirements. Intended to replace HSTs.) order was financed. The issue - trains due and paid for as capital, repayments have to be made even if they are not used - is the same if the money came from a ROSCO» (Rolling Stock Owning Company - about), a TOC (Train Operating Company), or HMG. The rest is accounting. Switching the order so that GWR (Great Western Railway) is left permanently with only low-bridge trains is an undesirable change to the real world.

The most pressing need is for the DMU (Diesel Multiple Unit) cascade, so that should be the priority. It is not as if replacing HSTs (High Speed Train (Inter City class 43 125 units)) with bimodes running on diesel will deliver the new timetable anyway.

HSTs are also needed for cascading to Scotrail, but a start at least can be made once bimodes are running. OK, so you might need to keep using some power cars you would rather put in the bin. And can the East Coast 800s be pulled forward and GW 801s delayed? Some cash adjustment for their higher lease costs would at least give someone a new train to sit in. Of course there are also the '802s', which might also come sooner if the extra design work is as slight as sounds. Surely the paperwork can't be that fixed a delay?
Logged
Tim
Hero Member
*****
Posts: 2738


View Profile
« Reply #76 on: December 09, 2015, 11:02:56 »

The most sensible thing as I see it would be for some of the HSTs (High Speed Train (Inter City class 43 125 units)) to run on the GWML (Great Western Main Line) for a few years longer, with derogations from the accessibility regulations as required.  Would that really be the end of the world?

If that causes problems to Hitachi and those who are paying for the new IEP (Intercity Express Program / Project. This will offer more capacity on routes, save money, give a consistent and safe service and meet customer requirements. Intended to replace HSTs.) trains, then isn't the answer for the IEPs to be built more slowly, but for the Newton Aycliffe factory to get extra work in compensation for that in the form of the 801 for Scotland (which were going to have to be made abroad because of capacity constraints at Aycliffe) and maybe some further orders of A trains for the likes of TPE (Trans Pennine Express)

Hitachi can be kept happy by having their factory kept busy making more trains over a longer period.

Scotland can be kept happy by having perhaps a few more 801s and perhaps getting them earlier in compensation for getting fewer HSTs than promised.

And the taxpayer compensates Hitachi by buying more trains from them rather than by paying out cash for trains to sit unused.
Logged
didcotdean
Transport Scholar
Hero Member
******
Posts: 1454


View Profile
« Reply #77 on: December 09, 2015, 11:13:21 »

GWR (Great Western Railway) have been distancing themselves from Network Rail for months in published information about engineering works etc in preparation for these kind of crunch points. So much for a collegiate approach in a contractorised railway but inevitable where one part can't keep up.
Logged
JayMac
Data Manager
Hero Member
******
Posts: 19304



View Profile
« Reply #78 on: December 09, 2015, 11:29:57 »

GWR (Great Western Railway) are still promising us the jam tomorrow on their website and station posters. Network Rail had the recipe for this preserve, but ingredients and a competent confiturier were sadly lacking.
Logged

"Good news for regular users of Euston Station in London! One day they will die. Then they won't have to go to Euston Station ever again." - David Mitchell
grahame
Administrator
Hero Member
*****
Posts: 43855



View Profile WWW Email
« Reply #79 on: December 09, 2015, 11:36:59 »

The most pressing need is for the DMU (Diesel Multiple Unit) cascade, so that should be the priority. It is not as if replacing HSTs (High Speed Train (Inter City class 43 125 units)) with bimodes running on diesel will deliver the new timetable anyway.

And on that basis, shouldn't the electrification sequence out from Paddington have been modified to Reading, Didcot, Oxford, Basingstoke, Newbury, Henley, Windsor, only then Swindon and beyond?
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
stuving
Transport Scholar
Hero Member
******
Posts: 7425


View Profile
« Reply #80 on: December 09, 2015, 11:45:30 »

The most pressing need is for the DMU (Diesel Multiple Unit) cascade, so that should be the priority. It is not as if replacing HSTs (High Speed Train (Inter City class 43 125 units)) with bimodes running on diesel will deliver the new timetable anyway.

And on that basis, shouldn't the electrification sequence out from Paddington have been modified to Reading, Didcot, Oxford, Basingstoke, Newbury, Henley, Windsor, only then Swindon and beyond?

In principle yes. Though it may come down to details like planning, delays in bridge-lifting, etc. To run wires and then trains you need the whole route from end to end, and it only takes a problem at one point, whether a legal or an engineering one, to make you look very silly again. The short routes may be easier to deliver on that basis.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5346


View Profile
« Reply #81 on: December 09, 2015, 11:58:24 »

From Rail Magazine - on sale today...

Quote
The first of 58 suburban electric trains arrives early next year, but there is no possibility of the wires being ready for them to run as planned.

Beyond that, a key decision will be to convert the entire order for electric inter-city Hitachi trains into bi-mode variants, fitted with diesel engines


The route that the first of those EMUs (Electric Multiple Unit) will be used on is already wired.  So unlike Rail, I think there is a high possibility that they will run exactly as planned between Paddington and Hayes and Harlington.   I'll agree that there will be significantly more than needed after the first year...

But haven't other rail magazines already reported that the decision to fit all the SETS as bi-mode has been taken?

Paul
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13325


View Profile Email
« Reply #82 on: December 09, 2015, 12:49:06 »

I'm not aware of anything other than speculation - and Rail says that decision is still in Mark Hopwood's hands....

One date that can't be changed is the loss of Old Oak Common to Crossrail though.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7425


View Profile
« Reply #83 on: December 09, 2015, 12:59:59 »

The route that the first of those EMUs (Electric Multiple Unit) will be used on is already wired.  So unlike Rail, I think there is a high possibility that they will run exactly as planned between Paddington and Hayes and Harlington. 
This is what Mark Hopwood is quoted as saying:
Quote
^We get our first EMUs in the early months of 2016. We already have wires to Hayes in west London, and we intend to start using them within a few weeks of receiving those trains.
Doesn't that still sound like May? Always providing that the parking spaces at H&H and West Ealing are ready.

Quote
But haven't other rail magazines already reported that the decision to fit all the SETS as bi-mode has been taken?
Maybe, but I don't suppose this forum is really going to affect the decision, so we may as well go on opining.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13325


View Profile Email
« Reply #84 on: January 05, 2016, 09:48:13 »

Apparently, the slew of HSTs (High Speed Train (Inter City class 43 125 units)) heading to Scotrail need to arrive as follows -

ScotRail are required to have at least 24 HST sets in service for the start of the December 2018 timetable, in accordance with the following schedule.
 
Sets 1-2: June 2018
 Sets 3-8: July 2018
 Sets 9-13: October 2018
 Sets 14-18: November 2018
 Sets 19-24: December 2018
 
 They will need to be modified before they go into service with ScotRail, to incorporate such features as power operated doors and other requirements (RVAR, PRM (Persons with Reduced Mobility)-TSI) to allow them to operate into 2020 and beyond.

Logged
grahame
Administrator
Hero Member
*****
Posts: 43855



View Profile WWW Email
« Reply #85 on: January 05, 2016, 10:52:36 »

Apparently, the slew of HSTs (High Speed Train (Inter City class 43 125 units)) heading to Scotrail need to arrive as follows -

If all class 800 and 801 trains were to be bimode and with sufficient diesel engine range and speed to operate services no matter how far the electrification has got, and dangerously assuming that route clearance for 26m carriages is completed on time even if electrification is a few years late, this HST cascade could be uncoupled from the actual electrification work and be based purely on Hitachi delivering the new trains on time.

The issue that is much more concerning is the cascading of class 165 and 166 trains, as my understanding is that the new units which replace them remain pure electric and will not be able to operate beyond where the wires have reached ...

Edit to correct grammar
« Last Edit: January 05, 2016, 11:08:03 by grahame » Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
ChrisB
Transport Scholar
Hero Member
******
Posts: 13325


View Profile Email
« Reply #86 on: January 05, 2016, 11:03:43 »

That's still a *very* big IF. As I understand it, rumour.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10450


View Profile
« Reply #87 on: January 05, 2016, 11:21:04 »

The issue that is much more concerning is the cascading of class 165 and 166 trains, as my understanding is that the new units which replace them remain pure electric and will not be able to operate beyond where the wires have reached ...

That's correct, though as long as Paddington to Didcot is available for electric trains - and it should be, by the end of next year at the latest AIUI ('as I understand it') -  then I would hazard a guess that around two-thirds of the planned Turbo cascade could take still place which would be more than enough to set the ball rolling, if not ideal.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
ChrisB
Transport Scholar
Hero Member
******
Posts: 13325


View Profile Email
« Reply #88 on: January 05, 2016, 11:32:00 »

I can't see GWR (Great Western Railway) being at all keen in supporting two depots both maintaining these 165/166s, so don't expect full utilisation until they're all cascaded, IMHO ('in my humble opinion')
Logged
Adelante_CCT
Transport Scholar
Hero Member
******
Posts: 1314



View Profile
« Reply #89 on: January 05, 2016, 11:41:56 »

I can't see GWR (Great Western Railway) being at all keen in supporting two depots both maintaining these 165/166s, so don't expect full utilisation until they're all cascaded, IMHO ('in my humble opinion')

But not all the 165/166s are being cascaded? Even after all the electrification is done and Hitachi trains have been built, Reading depot will still be home to around 15 units
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 4 5 [6] 7
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).