Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 10:55 12 Jan 2025
 
- 'My partner hid and secretly waved off my ship': LGBT veteran monument revealed
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 14/01/25 - Rail Sale starts
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end
24/01/25 - Bristol Rail Campaign AGM 2025

On this day
12th Jan (2009)
A quiet day in previous years (link)

Train RunningCancelled
12/01/25 10:55 Cardiff Central to Penzance
12/01/25 14:30 London Paddington to Exeter St Davids
15:20 Plymouth to Gunnislake
16:11 Gunnislake to Plymouth
12/01/25 17:09 Weston-Super-Mare to Severn Beach
17:23 Swansea to London Paddington
17:25 Cardiff Central to Trowbridge
17:44 Plymouth to Gunnislake
12/01/25 18:10 Weston-Super-Mare to Severn Beach
18:28 London Paddington to Weston-Super-Mare
12/01/25 18:35 Severn Beach to Bristol Temple Meads
18:35 Gunnislake to Plymouth
18:58 London Paddington to Bristol Temple Meads
19:35 Severn Beach to Bristol Temple Meads
20:08 Trowbridge to Cardiff Central
20:25 Avonmouth to Bristol Temple Meads
20:26 Exeter St Davids to Bristol Temple Meads
20:28 Weston-Super-Mare to London Paddington
20:37 Trowbridge to Bristol Temple Meads
21:05 Weston-Super-Mare to Bristol Temple Meads
21:28 London Paddington to Bristol Temple Meads
22:00 London Paddington to Swansea
22:35 Bristol Temple Meads to Trowbridge
Short Run
08:00 Bristol Temple Meads to Penzance
08:15 Penzance to London Paddington
09:35 Swindon to Cheltenham Spa
09:38 Bristol Temple Meads to Worcester Shrub Hill
09:44 Swindon to London Paddington
09:46 Exeter St Davids to Cardiff Central
10:37 London Paddington to Swansea
10:49 Cheltenham Spa to London Paddington
10:58 Great Malvern to London Paddington
11:50 Penzance to Cardiff Central
12/01/25 13:35 Severn Beach to Weston-Super-Mare
12/01/25 15:00 Cardiff Central to Penzance
15:08 Trowbridge to Cardiff Central
12/01/25 15:10 Weston-Super-Mare to Severn Beach
15:28 London Paddington to Taunton
12/01/25 15:35 Severn Beach to Weston-Super-Mare
15:42 Exeter St Davids to Cardiff Central
15:53 London Paddington to Bristol Temple Meads
16:05 Trowbridge to Cardiff Central
12/01/25 16:35 Severn Beach to Weston-Super-Mare
17:28 London Paddington to Weston-Super-Mare
17:55 Penzance to London Paddington
18:00 Cardiff Central to Taunton
18:25 Cardiff Central to Trowbridge
18:57 Taunton to London Paddington
19:00 Cardiff Central to Taunton
19:25 Cardiff Central to Trowbridge
Delayed
07:47 London Paddington to Penzance
07:57 London Paddington to Exeter St Davids
08:44 London Paddington to Great Malvern
08:46 London Paddington to Penzance
08:58 Great Malvern to London Paddington
09:00 London Paddington to Weston-Super-Mare
09:47 London Paddington to Hereford
10:07 London Paddington to Bristol Parkway
An additional train service has been planned to operate as shown 10:10 Plymouth to London Paddington
10:12 Didcot Parkway to Reading
10:40 Bedwyn to Reading
11:58 Great Malvern to London Paddington
etc
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 12, 2025, 10:56:50 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[212] Sunday Times Travel supplement - 14 page rail special
[97] Westminster Hall debate : Railway services to South West
[45] one pound flat rate bus fares in Devon and Torbay area.
[41] Shortage of train crews on Great Western Railway - ongoing dis...
[25] Mick Lynch announces retirement as head of RMT
[22] Rail passengers face another difficult year, warn MPs
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 4 5 [6]
  Print  
Author Topic: Switzerland - railways and incidents (merged posts)  (Read 33635 times)
stuving
Transport Scholar
Hero Member
******
Posts: 7373


View Profile
« Reply #75 on: November 02, 2022, 17:39:35 »

Several reports I've seen say this was a downhill run, working within an agreed limit of power sent to the  power grid. I saw part of a presentation by one of the railway's managers in which he was making a big thing of how many homes it was powering - odd, since this was only done for the RhB's benefit. An example from trains.com
Quote
The record-breaking, 100-car train was 1,910 meters (2,089 yards). It left Preda at 2:20 p.m. and shortly after 3:30 pm. crossed the Landwasser Viaduct. The 15.6 mile (24.93 kilometer) journey from Preda to Alvaneu, was downhill starting over a mile above sea level (Preda is at 1,788 meters, or 5,866 feet) and descending nearly half a mile to 1,000 meters, or 3,281 feet. During the descent, the train — which weighed 3,300 tons (or 2,900 metric tons) — was using electrical regenerative braking and generated 4000 kilowatt-hours of power. It travelled mostly at around 20 mph.
Logged
infoman
Hero Member
*****
Posts: 1479


View Profile
« Reply #76 on: March 20, 2023, 12:34:51 »

Jungefrau,BBC» (British Broadcasting Corporation - home page) 24 hours news item on monday 20 march 2023,about the lack of snow on the mountains.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7373


View Profile
« Reply #77 on: April 01, 2023, 12:19:50 »

Maybe we should not complain too much about a bit of rain and even flooding. From euronews:
Quote
Several people injured as two Swiss trains derail during storm
By Euronews  with AP  •  Updated: 31/03/2023 - 22:27

A train derailed in the Swiss town of Büren zum Hof, 20 kilometres north of Bern, 31 March, 2023.

Two regional trains in Switzerland derailed in separate incidents, injuring more than a dozen people Friday after a storm brought high winds and strong rains to the small Alpine nation, police said.

The incidents occurred at Lüscherz and Büren zum Hof, near the western city of Bern, police said.

In Büren zum Hof, a police spokeswoman said that 12 people — 9 adults and 3 children — were injured. Of those, one person's injuries were severe.

Television footage of the incident showed train carriages lying on their sides and the driver's cab embedded in a metal pole.

Police also said several people were injured in the derailment at Lüscherz, but further information about the number of the injured and the severity of their condition was not immediately available.

The transit agencies responsible for the trains, Aare Seeland Mobil and Regional Transit Bern-Solothurn, also confirmed the derailments on their respective websites. They noted that the affected rail routes were closed in response.

Judging by the video in that report, the train did indeed get rolled over onto its side by the wind! Maybe having trains of restricted height has its advantages.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7373


View Profile
« Reply #78 on: April 01, 2023, 14:24:38 »

There are other factors too, like these both (RBS Bern - Solothurn and the ASM (Assistant Station Master) Biel - Tauffelen) being metre-gauge, and with lots of stuff up in the roof because the floor is so low. Two pictures from nau.ch:

Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5633



View Profile
« Reply #79 on: April 01, 2023, 18:25:19 »

I wonder if it would be worth converting these lines to standard gauge, keeping the loading gauge/vehicle dimensions as at present.
Full size rail vehicles on metre gauge tracks simply LOOK unstable, and in extreme winds can be ACTUALLY unstable.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
grahame
Administrator
Hero Member
*****
Posts: 43092



View Profile WWW Email
« Reply #80 on: April 01, 2023, 18:35:43 »

I wonder if it would be worth converting these lines to standard gauge, keeping the loading gauge/vehicle dimensions as at present.
Full size rail vehicles on metre gauge tracks simply LOOK unstable, and in extreme winds can be ACTUALLY unstable.

That sounds like a 1st April idea - and yet I was struck by the yards at Regau on the Douro Valley line in Portugal last year, and suspect that the narrow gauge tracks were simple converted from there up the valley, leaving the old narrow gauge terminus and dual gauge yard abandoned, without even removing some of the locomotives that are rotting away there.
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 4 5 [6]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page