Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 20:15 06 Jan 2025
 
- Taxi driver who stoked Southport riots jailed
- Works on 'road from hell' to end after 23 years
- 'Second chance at life' after UK's first liver transplant for advanced bowel cancer
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 08/01/25 - Steam loco restoration - IRTE
09/01/25 - Bath Railway Society
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end

On this day
6th Jan (1968)
Hixon Railway accident (link)

Train RunningCancelled
19:06 London Paddington to Bedwyn
20:05 Liskeard to Looe
20:37 Looe to Liskeard
20:42 Bedwyn to London Paddington
21:05 Liskeard to Looe
21:37 Looe to Liskeard
Short Run
18:26 Exmouth to Paignton
18:38 Barnstaple to Exmouth
19:36 Didcot Parkway to London Paddington
19:59 Cheltenham Spa to London Paddington
Delayed
17:18 London Paddington to Swansea
18:30 London Paddington to Weston-Super-Mare
18:34 London Paddington to Cheltenham Spa
19:18 Trowbridge to Cardiff Central
20:22 Reading to Shalford
20:38 Maidenhead to Marlow
21:30 Shalford to Reading
07/01/25 04:50 Fratton to Salisbury
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 06, 2025, 20:17:31 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[103] New Adlestrop Railway Atlas update
[46] DFT - Where is the South Devon Railway
[44] 2024 - Service update and amendment log, Swindon <-> Westbury...
[42] Bridport branch reopening proposal
[41] Bath to Bridgnorth and back 4/1/25
[38] Rail Replacement bus - OK, but I prefer the train.
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 [2]
  Print  
Author Topic: Trolley on track incident, Heathrow Express line, December 2014  (Read 17154 times)
bobm
Administrator
Hero Member
*****
Posts: 10166



View Profile
« Reply #15 on: January 16, 2015, 12:44:16 »

The RAIB (Rail Accident Investigation Branch) are now investigating.

http://www.raib.gov.uk/publications/current_investigations_register/141228_heathrow_tunnel_junction.cfm
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #16 on: January 16, 2015, 15:46:37 »

.....and a related incident nearby in the same possession that occured the previous day Tongue
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13019


View Profile Email
« Reply #17 on: January 16, 2015, 17:04:44 »

The RAIB (Rail Accident Investigation Branch) have launched an investigation. I wondser how many heads will roll on this one?

Quote
Near-miss involving construction workers at Heathrow Tunnel Junction, west London, 28 December 2014

RAIB is investigating an incident in which a train almost struck two construction workers, and collided with a small trolley, on the Up Airport line between Heathrow Airport Tunnel and the Stockley Flyover.

The incident occurred at about 10:05 hrs on Sunday 28 December 2014 and involved train 1Y40, the 09:48 hrs service from London Heathrow Terminal 5 to London Paddington. The track workers jumped clear just before the approaching train struck a small engineering trolley that they had been placing on the line. The train, formed by a Class 332 electric multiple unit, was travelling at approximately 36 mph (58 km/h) when it struck the trolley.

The two track workers were among a large number of people carrying out construction work on the approach to a new bridge that had been recently constructed adjacent to the existing Stockley Flyover. This new structure, which carries a new railway track over the mainline from London Paddington to Reading, was built as part of the Crossrail surface works being undertaken by Network Rail.

To enable this work to take place, parts of the operational railway in and around the construction site had been closed for varying periods during the few days before the incident. The two construction workers were unaware that the Up Airport line had returned to operational use a few hours before they started to place the trolley onto this line. They formed part of an eight person workgroup which included a Controller of Site Safety (COSS). The COSS and other group members were not with the two track workers at the time of the incident. The presence of temporary fencing, intended to provide a barrier between construction activities and the operational railway, did not prevent the two track workers accessing the open line.

Network Rail owned the infrastructure at the site of the accident and had employed Carillion Construction as the Principal Contractor for the construction works. The two track workers and the COSS were all employed by sub-contractors.

RAIB^s investigation will establish the sequence of events, examine how the work was planned, how the staff involved were being managed and the way in which railway safety rules are applied on large construction sites adjacent to the operational railway. It will also seek to understand the actions of the people involved, and factors that may have influenced their behaviour.

RAIB will also consider whether there is any overlap between this incident and the factors which resulted in an irregular dangerous occurrence at the same construction site on the previous day. This occurrence involved a gang of railway workers who walked along a line that was open to traffic, and without any form of protection, until other construction workers warned them that the line was open to traffic.

Our investigation is independent of any investigations by the safety authority or the police. We will publish its findings at the conclusion of the investigation. This report will be available on our website.

Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 [2]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page