Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 12:35 11 Jan 2025
 
- Gritters blocked in by '200 cars' in Peak District
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 14/01/25 - Rail Sale starts
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end
24/01/25 - Bristol Rail Campaign AGM 2025

On this day
11th Jan (2012)
TVM - a fair weather facility? (link)

Train RunningCancelled
11:19 Frome to Weymouth
11:50 London Paddington to Hereford
Short Run
14:00 Bristol Temple Meads to London Paddington
15:14 Hereford to London Paddington
Delayed
08:48 London Paddington to Carmarthen
10:48 London Paddington to Carmarthen
11:24 Exmouth to Paignton
12:35 London Paddington to Exeter St Davids
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 11, 2025, 12:54:35 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[75] Thames Valley infrastructure problems causing disruption elsew...
[66] Westminster Hall debate : Railway services to South West
[49] TravelWatch SouthWest - merged posts
[46] North Cotswold line delays and cancellations - 2025
[41] one pound flat rate bus fares in Devon and Torbay area.
[41] Ryanair sues 'unruly' passenger over flight diversion
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Identify the trip?  (Read 2784 times)
grahame
Administrator
Hero Member
*****
Posts: 43085



View Profile WWW Email
« on: September 13, 2014, 17:14:12 »

Out of FGW (First Great Western) territory today.   Pictures from the place I started, each change, and my destination.  Can anyone give me my complete journey?










Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
Worcester_Passenger
Transport Scholar
Hero Member
******
Posts: 2040


View Profile
« Reply #1 on: September 13, 2014, 18:21:27 »

I can get the second half of the journey, but I never venture south of Birmingham Moor St, so I can't place the origin and the first change (is it Tyseley?).

But after that you've been to Smethwick Galton Bridge - that's the High Level platform, with a cunning 'to platforms' sign that misses out P4.

And then to Wolverhampton - that's the far end of the Birmingham-end bay.

And thence to Lancaster.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13035


View Profile Email
« Reply #2 on: September 13, 2014, 18:53:26 »

No - Warwick Parkway (subway) & Birmingham Moor Street platform 3
Logged
grahame
Administrator
Hero Member
*****
Posts: 43085



View Profile WWW Email
« Reply #3 on: September 13, 2014, 19:45:44 »

Correct - Warwick Parkway to Lancaster changing at Birmingham Moor Street, Smethwick Galton Bridge and Wolverhampton.
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
thetrout
Hero Member
*****
Posts: 2612



View Profile
« Reply #4 on: September 13, 2014, 20:49:21 »

I got Smethwick Galton Bridge but only because of the sign reflecting in the window of that Class 323 Lips sealed

My guess for Lancaster was also way out. I initially thought Durham as they track layout is fairly similar. But eventually discounted it after realizing the platforms were asymmetrical, There was an over bridge and the station was in VWC Colours.
Logged

Grin Grin Grin Grin
Worcester_Passenger
Transport Scholar
Hero Member
******
Posts: 2040


View Profile
« Reply #5 on: September 14, 2014, 06:38:30 »

I go to Moor Street occasionally - but never as far as platform 3!
Logged
grahame
Administrator
Hero Member
*****
Posts: 43085



View Profile WWW Email
« Reply #6 on: September 14, 2014, 10:14:58 »

Looking back on the day ... what incredible changes we've seen over the years on a journey like this.
 
Warwick Parkway is a new station, with that passageway (famously?) being utilised by Chiltern Trains to provide cost effective access to a northbound platform when a quotation from the infrastructure owner was much higher ... so perhaps this is a benefit of a longer franchise.

Birmingham Moor Street - at one time down to a two platform terminus - now has 4 (or 5?)  platforms, and is a through station once again, with new northbound services.   And what was once a rundown station is now smart and alive

Smethwick Galton Bridge is a new 4 platform station, where two lines both with frequent (at least twice an hour) services call on both.   Again, busy; seeing it on a Saturday and so with a  whole lot of occasional / new users, there is perhaps a call for better signage to help people find their ongoing platforms, and indeed the station exit (which is above the high level!).    Could also do with some tuning of the announcements on platform 3 which were telling us "stand back, fast train approaching" just after the fast train had gone through!

Wolverhampton - a bit vague here, but I think that at least one of the easterly platforms is new ... and it's also great to see busy, hourly electric (mainly!) trains up to the North West and on to Scotland.  Such an improvement on the days of Voyagers running routinely under the wires all the way all day from Birmingsham to Scotland, and a separate London to Wolverhampton service.

Lancaster.  And there's an extra platform there too. Still one platform face without a track, and no WiFi connection anywhere in the station (well - not in Costa, and not to the knowledge of the Costa staff).

We've had many improvements over the years in our own part of the country, and indeed many more are underway ... and I look forward to the day where just about every station that I change trains at has come forward significantly since the low point.   Platform 4 has returned at Swindon.   Trowbridge needs a buffet, and at both Chippenham and Westbury, the trackless platform faces could really do with additional tracks.    That's not just "wouldn't it be nice if" ... there are operational, robustness, and traffic growth reasons which are no longer pie in the sky!
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
Worcester_Passenger
Transport Scholar
Hero Member
******
Posts: 2040


View Profile
« Reply #7 on: September 14, 2014, 11:05:31 »

Wolverhampton has indeed got a new platform over the far side of the station. And a new footbridge to get there. A question for the techie members of the forum - why are all new footbridges so tall? There's an extra flight of stairs here, and on the one at Reading.

But what is completely absurd about the new footbridge is the 60 meters of open platform between the platform canopy and the (enclosed) footbridge. Was there a plan to rebuild the main buildings that somehow never happened? Or do railway architects want the passengers to get wet?

Wolverhampton is sometimes touted as being an easier place for interchange than Birmingham New St. That's true northbound, where everything shares the same platform. Less so southbound, where the Virgin train from Scotland will sit at the far platform for 20 minutes, while everything else uses the middle island platform.

As a place for interchange, Smethwick Galton Bridge is pretty useless to/from the Worcester direction (it may be better if you're travelling from the Warwick Parkway direction). It's only the Birmingham - Wolverhampton stopper that calls there.

And moving from one platform to another is complicated. From P4 (the Wolverhampton - New St platform) to P1 (Snow Hill - Kidderminster) is 16 steps up to P2, along P2, another 16 steps up to the footbridge, across the foot bridge, and 16 steps down to P1. Or there's a Cluedo-like secret lift.
Logged
Surrey 455
Hero Member
*****
Posts: 1269


View Profile
« Reply #8 on: September 14, 2014, 18:18:47 »

I did wonder if you used a "Great Escape" from London Midland but I can now see that Lancaster is not served by them.
Logged
grahame
Administrator
Hero Member
*****
Posts: 43085



View Profile WWW Email
« Reply #9 on: September 14, 2014, 18:55:41 »

I did wonder if you used a "Great Escape" from London Midland but I can now see that Lancaster is not served by them.

Unusually for me, I used advance fares ... I had to be in Lancaster before the first connection from Melksham, thus the early morning drive to Warwick, and by the time I came back the fares had dropped for the evening.  I did have an hour or two to wait in Lancaster rather than just hopping on the next train, but I booked with a safe margin.
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
Rhydgaled
Hero Member
*****
Posts: 1500


View Profile WWW
« Reply #10 on: September 15, 2014, 14:02:05 »

But what is completely absurd about the new footbridge is the 60 meters of open platform between the platform canopy and the (enclosed) footbridge. Was there a plan to rebuild the main buildings that somehow never happened? Or do railway architects want the passengers to get wet?
I've read of similar complaints about Newport (the big one in South Wales) station. Railway architects also seem to have a habit of wanting to trash the appearance of stations with listed building protection with new features that are not in keeping. At Aberystwyth, the are going to build an odd looking modern canopy on the outside of the Cambrian Railways building (although after objections they have toned the new canopy down, it is still not great), and Shrewsbury has a refurbishment plan that doesn't look in keeping (although in that case I'm probably more concerned that the waiting room on the island platform, already too small, is to be reduced in size). The latest issue of Modern Railways however has a frightening artist's impression that tops them all (apart, perhaps, for the loss of the station building at Fishguard & Goodwick, although that was protected by a conservation area rather than listing). This would put the grand frontage of Cardiff Central inside a huge class box with a wavy roof that reminds me of Tesco-Havant. Not acceptable.

Talking of unacceptable station 'improvements', I saw the other day that the gent's toilets at Haverfordwest had been refurbished. Good, I thought, until I entered the cubicle. Apart from the fact it was plummed into the drainage system, it essentially was a stainless steel bucket (no toilet seat). Dreadful. Also dreadful is Whitland, a junction station with almost no shelter from the wind and very little in the way of facilities (nearest toilets are the public toilets about 3-5 minutes walk away, and are similar to the disapointment at Haverfordwest station), although it does have passenger information displays now. It is all very well knowing there is half an hour wait for the train but with no waiting room to retreat to it can get rather unpleasant in windy conditions.
Logged

----------------------------
Don't DOO (Driver-Only Operation (that is, trains which operate without carrying a guard)) it, keep the guard (but it probably wouldn't be a bad idea if the driver unlocked the doors on arrival at calling points).
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page