TonyK
Global Moderator
Hero Member
Posts: 6594
The artist formerly known as Four Track, Now!
|
|
« Reply #630 on: November 08, 2018, 22:52:43 » |
|
Thanks for those updates, METALRAIL. Keep them coming.
What he said! Hear hear!
|
|
|
Logged
|
Now, please!
|
|
|
metalrail
|
|
« Reply #631 on: November 09, 2018, 14:16:53 » |
|
Oh go on then! Few more from today... Dr Days first, new layout complete First 2 from Barrow Rd North towards Ducie Road showing the completed junction layout Third from Barrow Rd South with no change - 2 lines left to the Rhubarb Loop, 4 lines ahead to Bristol E junction Final pic, just cos it annoyed me that so called artists can't keep their grubby mitts off anything railway related, especially junction signs
|
|
|
Logged
|
Oh for the day when I can catch a train from Mangotsfield to the Centre, Bath and Yate! ;-)
|
|
|
metalrail
|
|
« Reply #632 on: November 09, 2018, 14:22:41 » |
|
Then onto Ashley Down, by old Ashley Hill station. Not great pics as not the best vantage point First pic showing the 4 lines running south towards Narroways Second showing the 4 lines running north towards Muller Rd Bridge Note the gap between the main & relief lines where passive provision has been made for Ashley Hill station to be reinstated in the future - we can hope! Third showing 4 lines back over Muller Rd Bridge again finally. This has only recently been done as the double track previously slewed just north of the bridge. Also shows new signal for the new Up Main
|
|
|
Logged
|
Oh for the day when I can catch a train from Mangotsfield to the Centre, Bath and Yate! ;-)
|
|
|
Red Squirrel
Administrator
Hero Member
Posts: 5452
There are some who call me... Tim
|
|
« Reply #633 on: November 09, 2018, 14:37:14 » |
|
Great pix again metalrail - much appreciated! Note the gap between the main & relief lines where passive provision has been made for Ashley Hill station to be reinstated in the future - we can hope! Or it could just be passive provision for running the track over the bridge rather than falling down the gap into the station subway: https://goo.gl/maps/q7bK8MkE8WK2 But as you say, we can hope...
|
|
|
Logged
|
Things take longer to happen than you think they will, and then they happen faster than you thought they could.
|
|
|
metalrail
|
|
« Reply #634 on: November 09, 2018, 14:47:07 » |
|
Or it could just be passive provision for running the track over the bridge rather than falling down the gap into the station subway: https://goo.gl/maps/q7bK8MkE8WK2 Wink But as you say, we can hope... I've had a renewed sense of optimism for it ever since SandT's excellent new track layout for the bank showing the station provision was still there... and the fact the subway is also intact with access to the island platform area gives me at least some hope... you never know, one day I may re-enter the real world!
|
|
|
Logged
|
Oh for the day when I can catch a train from Mangotsfield to the Centre, Bath and Yate! ;-)
|
|
|
Red Squirrel
Administrator
Hero Member
Posts: 5452
There are some who call me... Tim
|
|
« Reply #635 on: November 09, 2018, 15:05:54 » |
|
...and the fact the subway is also intact with access to the island platform area gives me at least some hope...
I'm guessing that from the subway to a new island platform is about 6m vertically, so to achieve the maximum 1:12 incline will require digging out a 72m trench, 1.5m wide. Some work would also have to be done to the west of the subway to sort out the gradients. It would certainly be neater than one of those colossal EA-compliant footbridges, but somehow I think the latter will win the day.
|
|
|
Logged
|
Things take longer to happen than you think they will, and then they happen faster than you thought they could.
|
|
|
metalrail
|
|
« Reply #636 on: November 09, 2018, 15:31:47 » |
|
I'm guessing that from the subway to a new island platform is about 6m vertically, so to achieve the maximum 1:12 incline will require digging out a 72m trench, 1.5m wide. Some work would also have to be done to the west of the subway to sort out the gradients. It would certainly be neater than one of those colossal EA-compliant footbridges, but somehow I think the latter will win the day Yeah as I stood at the bottom of the footpath leading to the subway I was trying to picture a hideous new Stapleton Road style skating ramp and how it wouldn't fit in with the surroundings in any way, shape or form
|
|
|
Logged
|
Oh for the day when I can catch a train from Mangotsfield to the Centre, Bath and Yate! ;-)
|
|
|
SandTEngineer
|
|
« Reply #637 on: November 09, 2018, 15:38:30 » |
|
....and before somebody asks...the triangle on the signaI ID plate means that the signal is a repeater (distant) and cannot show a red aspect (in this case). There are other sites where the signal would be fitted with a red aspect but cannot be approached in normal working up to that. You usually find those on signals within reversible working areas or a signal ahead of a junction. In those cases its done to prevent misreading of a signal.
|
|
|
Logged
|
|
|
|
Red Squirrel
Administrator
Hero Member
Posts: 5452
There are some who call me... Tim
|
|
« Reply #638 on: November 09, 2018, 16:33:01 » |
|
....and before somebody asks...the triangle on the signaI ID plate means that the signal is a repeater (distant) and cannot show a red aspect (in this case). There are other sites where the signal would be fitted with a red aspect but cannot be approached in normal working up to that. You usually find those on signals within reversible working areas or a signal ahead of a junction. In those cases its done to prevent misreading of a signal.
So does that mean it's a 3-aspect two-aperture signal?
|
|
|
Logged
|
Things take longer to happen than you think they will, and then they happen faster than you thought they could.
|
|
|
|
SandTEngineer
|
|
« Reply #640 on: November 09, 2018, 16:43:09 » |
|
Oh, and another thing while I'm at it.....they are called JUNCTION INDICATORS not FEATHERS....
|
|
|
Logged
|
|
|
|
metalrail
|
|
« Reply #641 on: November 09, 2018, 17:20:39 » |
|
Can't they be junction feathers?
|
|
|
Logged
|
Oh for the day when I can catch a train from Mangotsfield to the Centre, Bath and Yate! ;-)
|
|
|
Red Squirrel
Administrator
Hero Member
Posts: 5452
There are some who call me... Tim
|
|
« Reply #642 on: November 09, 2018, 17:40:50 » |
|
Oh, and another thing while I'm at it.....they are called JUNCTION INDICATORS not FEATHERS.... Ee's gettin shouty again. Find im is pills someone.
|
|
|
Logged
|
Things take longer to happen than you think they will, and then they happen faster than you thought they could.
|
|
|
martyjon
|
|
« Reply #643 on: November 09, 2018, 18:00:43 » |
|
Great pix again metalrail - much appreciated! Note the gap between the main & relief lines where passive provision has been made for Ashley Hill station to be reinstated in the future - we can hope! Or it could just be passive provision for running the track over the bridge rather than falling down the gap into the station subway: https://goo.gl/maps/q7bK8MkE8WK2 But as you say, we can hope... There was never a subway at Ashley Hill, it was a footbridge. The bridge shown in the piccy is over a lane from Muller Road to what was the forecourt of Ashley Hill station and only accessible by light motor vehicles and pedestrians.
|
|
« Last Edit: November 09, 2018, 18:15:23 by martyjon »
|
Logged
|
|
|
|
martyjon
|
|
« Reply #644 on: November 09, 2018, 18:13:23 » |
|
....and before somebody asks...the triangle on the signaI ID plate means that the signal is a repeater (distant) and cannot show a red aspect (in this case). There are other sites where the signal would be fitted with a red aspect but cannot be approached in normal working up to that. You usually find those on signals within reversible working areas or a signal ahead of a junction. In those cases its done to prevent misreading of a signal.
Is the triangle now used instead of an 'R', a signal near my home has a 'R' underneath the signal number that it repeats. That signal is on the two-way worked up Charfield line between Westerleigh Junction and Yate South Junction.
|
|
|
Logged
|
|
|
|
|