Times are getting busier and busier and its now high time, that additional rail services are provided in the thames valley before the start of Crossrail services.
Now that Reading Station is being constructed, and i have to say its amazing, a different timetable with additional available rolling stock could be started.
During the morning peak most services are of good choice and standard, although for capacity may be another story.
Firstly starting with Maidenhead, the last fast peak train is at 0903 arriving at London Paddington at around 0927/0928.
From what i have witnessed in the past, people where looking for a fast train especially from the Marlow Branch to find that the only avaliable one's are slow stopping ones after the 0903 had departed.
So here are a few options;
0910/0940/1010 and 1040 Maidenhead to London Paddington, calling at; Slough Only.
All should be turbo trains.
Afternoon trains
1242/1312 and 1342 London Paddington to Maidenhead, calling at; Slough Only.
Again all should be turbo trains. The 0712 morning service currently operates from London Paddington to Maidenhead, so the 1242/1312 and 1342 should really have no problems operating, unless there's something i don't know, that may affect this
And the first late afternoon train should be at 1612 calling at; Slough, Maidenhead, Twyford and Reading.
Then as per normal peak time trains thereafter.
Now the draft timetable is my own idea i don't expect anyone to take it to heart. However what are your views on this.
Will be happy to know what you say
(edited to remove blank lines - bobm)