Engineering work starting on 24/08/13 between Swindon and Westbury.
Track improvements and maintenance are taking place from 15:00 on 24/08/13 to 17:00 on 24/08/13 between Swindon and Westbury.
Saturday - The 1522 Swindon to Warminster service will depart Swindon at 1612 and will terminate at Westbury.
An additional train will run from Westbury at 1608 to Warminster.
I've know about the time change for a while, but the reason is a bit of a surprise.
On a regular Saturday, the Westbury - Swindon train gets into Swindon at around 15:50, and then forms a train via Kemble to Cheltenham Spa. An earlier train from Cheltenham Spa via Kemble forms the 15:22 to Westbury. I had assumed, incorrectly it seems from the above report, that the delay to the down train was so that the same set could be used for both trains during the Kemble blockade - "retimed for OPERATION CONVENIENCE" as might be written elsewhere

Do they really mean "engineering works between Westbury and Swindon", or it done to let a work train from Westbury to Swindon, of which there are plenty at the moment, through from Bradford Junction to Thingley?