Were there any arrangements made to hand signal services at greatly reduced speed or was it a case of 'all stop' until someone had put 50p in the meter at Swindon Panel?
Staff were sent out to clip points and switch in overrides to allow services to move - of course this was a slow process.
1L14 was trapped in section just west of Wootton Bassett Jun towards Bristol Parkway (0527 Swansea-Paddington)
1A05 was trapped in section just west of Wootton Bassett Jun towards Chippenham (0640 Bristol
TM‡-Paddington)
1A04 was trapped in section at South Marston (0630 Bristol TM-Paddington)
1A04 was allowed to continue once override switches has been switched in between Swindon and Didcot, this then formed the delayed 0729 from Didcot as the previous poster said, and it was the first train through the area. The 0701 ex Swindon made it through the area without a hitch, and I am not sure what was in the platform before 1A04 arrived, maybe an
HST▸ that had terminated at Didcot and was returning east. EDIT: The service the previous poster saw in platform 2 before the delayed 0729 arrived was an additional service 1Z24 which started at Didcot booked to depart at 0847 for Reading and Paddington Only.
1A05 had points clipped at Rushey Platt and Swindon station to allow it to get into the platforms at Swindon.
1L14 was returned to Bristol Parkway upon the operation of the override switches between Bristol Parkway and Swindon.
Furthermore,
1A06 between Bath and Chippenham changing ends and returning to Bath (0620 Weston-Paddington)
2M11 on Melksham single line changing ends and diverted via Bristol upon arriving and reversing at Bradford Junction (0704 Westbury-Gloucester)
1L16 between Stroud and Kemble moving in to Kemble Station (0631 Cheltenham-Paddington)