Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 17:15 10 Jan 2025
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 14/01/25 - Rail Sale starts
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end
24/01/25 - Bristol Rail Campaign AGM 2025

On this day
10th Jan (2017)
Defibrillators discussion pack published by Network Rail (link)

Train RunningCancelled
13:48 London Paddington to Carmarthen
14:35 London Paddington to Paignton
15:30 London Paddington to Weston-Super-Mare
15:52 London Paddington to Great Malvern
15:54 Cardiff Central to London Paddington
16:12 London Paddington to Bristol Parkway
16:30 London Paddington to Taunton
16:32 Great Malvern to London Paddington
16:36 London Paddington to Plymouth
16:59 Cheltenham Spa to London Paddington
17:00 Oxford to London Paddington
17:18 London Paddington to Swansea
17:50 Cardiff Central to London Paddington
Additional 18:10 Bristol Temple Meads to Gloucester
19:04 Great Malvern to London Paddington
Short Run
14:03 London Paddington to Penzance
14:20 Carmarthen to London Paddington
14:48 London Paddington to Swansea
15:28 Weston-Super-Mare to London Paddington
16:07 London Paddington to Didcot Parkway
16:34 Newbury to London Paddington
16:50 London Paddington to Didcot Parkway
17:15 Exeter Central to Barnstaple
17:20 London Paddington to Didcot Parkway
17:28 Weston-Super-Mare to London Paddington
18:29 Gatwick Airport to Reading
18:38 Barnstaple to Exmouth
19:04 Paignton to London Paddington
19:35 Exeter St Davids to London Paddington
22:50 Salisbury to Portsmouth Harbour
Delayed
15:03 London Paddington to Penzance
15:59 Cheltenham Spa to London Paddington
16:13 Exeter Central to Barnstaple
16:31 Barnstaple to Exeter St Davids
An additional train service has been planned to operate as shown 16:57 London Paddington to Swindon
17:33 Barnstaple to Exeter Central
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 10, 2025, 17:27:27 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[103] Thames Valley infrastructure problems causing disruption elsew...
[98] Westminster Hall debate : Railway services to South West
[97] Ryanair sues 'unruly' passenger over flight diversion
[87] Mick Lynch announces retirement as head of RMT
[41] Birthday trip, Melksham to Penzance - 28th January 2025
[22] A Beginner's Guide to the Great Western "Coffee Shop" Passenge...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 3 4 [5] 6 7 ... 16
  Print  
Author Topic: London Waterloo - station, services, facilities, incidents - and some quirks / odd facts (merged posts)  (Read 97831 times)
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #60 on: August 15, 2017, 11:18:57 »

That engineering train is in P10, isn't it? The very one that (with its approach line(s)) was made part of the possession by a late change in July? So, if there was something in the plans or instructions to signallers that wasn't changed then, so a train leaving P11 could use the line to P10 ...

AIUI (as I understand it) the engineering train has been in that position every day since the work started.  It ought to be impossible to set a route onto the line it is standing on.  Suggestions elsewhere that it is there as a physical barrier to protect the worksite.  So did it work?

Paul
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5632



View Profile
« Reply #61 on: August 15, 2017, 11:39:42 »

Looking at the pictures, it seems a possibility that the engineering train was longer than was expected, or it had been moved, and that the passenger train then collided sidewise where the lines converge.
The damage looks limited perhaps suggesting that the driver of the EMU (Electric Multiple Unit) had time to brake, but not time to stop.
The EMU was leaving the station, so it must have arrived safely.

Under normal circumstances, track circuits on the line occupied by the freight should be interlocked with the platform starting signal and thus prevent this sort of accident.
During large scale engineering work, it is possible that the equipment was defective or disconnected, or even that it was BELIEVED to be defective when in fact it was working correctly.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #62 on: August 15, 2017, 11:51:43 »

Looking at the pictures, it seems a possibility that the engineering train was longer than was expected, or it had been moved, and that the passenger train then collided sidewise where the lines converge.
I've been in and out of Waterloo half a dozen times recently and that train has been an almost permanent feature, at the current length.  The line it is on is within the possession until well beyond the point of impact.

It can be seen present, (either with the cab just at the platform end, or just beyond) in a number of online images and videos taken at different times, e.g. this from 8th Aug by Paul Bigland: http://PaulBigland.zenfolio.com/p671909530/e92a8b12d

Paul

Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13033


View Profile Email
« Reply #63 on: August 15, 2017, 11:57:35 »

Causing horrendous problems getting into Waterloo from suburban stations now. A colleague's journey from Surbiton this morning kicked her out at Raynes Park, and eventually told to get a bus to Wimbledon & the tube from there. Expected at 0930, she's still on her way.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7371


View Profile
« Reply #64 on: August 15, 2017, 12:00:56 »

Looking at the pictures, it seems a possibility that the engineering train was longer than was expected, or it had been moved, and that the passenger train then collided sidewise where the lines converge.
I've been in and out of Waterloo half a dozen times recently and that train has been an almost permanent feature, at the current length.  The line it is on is within the possession until well beyond the point of impact.

It can be seen present, (either with the cab just at the platform end, or just beyond) in a number of online images and videos taken at different times, e.g. this from 8th Aug by Paul Bigland: http://PaulBigland.zenfolio.com/p671909530/e92a8b12d

Paul



But the engineering train shouldn't affect the signalling, should it? All track within the possession should be off limits, - I'm not sure whether that would involve screwdrivers and crocodile leads these days, but the effect should be the same. The issues concerns the boundary - all track entering the possession should appear "occupied" permanently, and be marked by sticky tape on the panel (or its soft equivalent on-screen).
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #65 on: August 15, 2017, 12:22:41 »

But the engineering train shouldn't affect the signalling, should it? All track within the possession should be off limits, - I'm not sure whether that would involve screwdrivers and crocodile leads these days, but the effect should be the same. The issues concerns the boundary - all track entering the possession should appear "occupied" permanently, and be marked by sticky tape on the panel (or its soft equivalent on-screen).

Quite right AFAIK (as far as I know), but my post was only intended to explain to the earlier poster that that particular engineering train shouldn't have caught anyone out, because this morning it appears to be not significantly different, in either length or position, to any other day.

Paul
Logged
Timmer
Global Moderator
Hero Member
*****
Posts: 6555


View Profile
« Reply #66 on: August 15, 2017, 14:37:06 »

SWT (South West Trains) are now advising not to travel on their network tomorrow as well as the rest of today:
https://www.southwesttrains.co.uk/disruptions/96AF36FED17149D9BF98F22568F054DC/
Logged
Oxonhutch
Transport Scholar
Hero Member
******
Posts: 1350



View Profile
« Reply #67 on: August 15, 2017, 15:32:24 »

It will be interesting what the RAIB (Rail Accident Investigation Branch) come up with as the underlying cause but the barrier train did exactly what it was supposed to do and probably prevented deaths or serious injuries on the ground in the work site. Good use of belt and braces against, what I can only presume, was a perceived risk of incursion - or, more likely, worker excursion.
Logged
CyclingSid
Data Manager
Hero Member
******
Posts: 2101


Hockley viaduct


View Profile
« Reply #68 on: August 15, 2017, 18:20:30 »

On the re-direct to Reading; last Saturday I went to Salisbury and found there was a direct train from Reading (P3).Very convenient. On the way back, it appeared that the train sat at Basingstoke for 30 minutes or so, presumably to allow the normal BSK (Brake Standard Corridor (carriage))-RDG(resolve) and XTC services to maintain their timetable. Apparently there were positive comments from RDG passsengers, plus "you should bring back the Brighton service" (how long ago?).
Logged
PhilWakely
Transport Scholar
Hero Member
******
Posts: 2140



View Profile
« Reply #69 on: August 15, 2017, 21:29:48 »

From my very untrained eye, it looks to me that a set of points leading away from the platform from which the EMU (Electric Multiple Unit) was leaving had somehow been set so that the EMU went into the path of the engineering train

The points must have somehow been set between the time the EMU entered the platform and left it.
Logged
Timmer
Global Moderator
Hero Member
*****
Posts: 6555


View Profile
« Reply #70 on: August 16, 2017, 05:56:36 »

Good news is that platforms 11 and 12 are back in use with just platform 13 closed.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #71 on: August 16, 2017, 10:18:31 »

Good news is that platforms 11 and 12 are back in use with just platform 13 closed.

That looks like some evidence of their having been two issues (as was reported on SWT (South West Trains)'s website yesterday morning), perhaps the points giving access to P13 from the P14 approach track are a separate fault?  P13 is now showing NOGO on the opentraintimes map, and as you say P11 and P12 are seeing normal movements via yesterdays main incident site.

http://www.opentraintimes.com/maps/signalling/wat

Paul
Logged
Timmer
Global Moderator
Hero Member
*****
Posts: 6555


View Profile
« Reply #72 on: August 16, 2017, 10:59:23 »

That looks like some evidence of their having been two issues (as was reported on SWT (South West Trains)'s website yesterday morning), perhaps the points giving access to P13 from the P14 approach track are a separate fault?  P13 is now showing NOGO on the opentraintimes map, and as you say P11 and P12 are seeing normal movements via yesterdays main incident site.

http://www.opentraintimes.com/maps/signalling/wat

Paul
Which is a bit of a shame that the advice given was not to travel today. I know with what was known at the time it was the best advice to give, but how many didn't make their journey today based on that advice? In the case of those who have to travel to work probably not many. Perhaps those who were planning a day out to London may have postponed doing so.

Slightly sad that the last days of the SWT franchise will be remembered for the blockade at Waterloo that will benefit the new franchise and not all the many good things that SWT have achieved over the years. Not saying they were perfect but it has been one of the better franchises.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10365


View Profile
« Reply #73 on: August 16, 2017, 11:16:55 »

Slightly sad that the last days of the SWT (South West Trains) franchise will be remembered for the blockade at Waterloo that will benefit the new franchise and not all the many good things that SWT have achieved over the years. Not saying they were perfect but it has been one of the better franchises.

I'm guessing you're not a member of the South Hampshire Rail User Group then?   Wink

First Group must be relieved it didn't happen just after they'd taken over, as that would no doubt have been a difficult start from which to recover.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
stuving
Transport Scholar
Hero Member
******
Posts: 7371


View Profile
« Reply #74 on: August 16, 2017, 11:31:24 »

Slightly sad that the last days of the SWT (South West Trains) franchise will be remembered for the blockade at Waterloo that will benefit the new franchise and not all the many good things that SWT have achieved over the years. Not saying they were perfect but it has been one of the better franchises.

I'm guessing you're not a member of the South Hampshire Rail User Group then?   Wink

First Group must be relieved it didn't happen just after they'd taken over, as that would no doubt have been a difficult start from which to recover.

How do you know it won't have?
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 3 4 [5] 6 7 ... 16
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page