Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 14:15 10 Jan 2025
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end
24/01/25 - Bristol Rail Campaign AGM 2025
28/01/25 - Coffee Shop 18th Birthday

On this day
10th Jan (2017)
Defibrillators discussion pack published by Network Rail (link)

Train RunningCancelled
12:50 Cardiff Central to London Paddington
13:08 London Paddington to Didcot Parkway
13:15 London Paddington to Cardiff Central
13:30 London Paddington to Bristol Temple Meads
13:30 Bristol Temple Meads to London Paddington
13:48 London Paddington to Carmarthen
14:02 Oxford to London Paddington
14:12 Newbury to Reading
14:15 West Ealing to Greenford
14:15 London Paddington to Cardiff Central
14:23 London Paddington to Oxford
14:30 Greenford to West Ealing
14:37 Didcot Parkway to London Paddington
14:45 West Ealing to Greenford
15:00 Greenford to West Ealing
15:03 Oxford to London Paddington
15:15 West Ealing to Greenford
15:16 London Paddington to Cardiff Central
15:30 Greenford to West Ealing
15:54 Cardiff Central to London Paddington
16:00 Oxford to London Paddington
16:23 London Paddington to Oxford
16:50 Cardiff Central to London Paddington
17:00 Oxford to London Paddington
17:50 Cardiff Central to London Paddington
Short Run
11:57 Great Malvern to London Paddington
13:09 Didcot Parkway to London Paddington
13:26 Weston-Super-Mare to London Paddington
13:32 London Paddington to Cheltenham Spa
13:38 London Paddington to Didcot Parkway
13:48 Didcot Parkway to London Paddington
13:56 Newbury to London Paddington
14:03 London Paddington to Penzance
14:06 London Paddington to Newbury
14:08 London Paddington to Didcot Parkway
14:15 Didcot Parkway to London Paddington
14:20 Carmarthen to London Paddington
14:25 Newbury to London Paddington
14:30 London Paddington to Weston-Super-Mare
14:32 London Paddington to Cheltenham Spa
14:38 London Paddington to Didcot Parkway
15:08 Didcot Parkway to London Paddington
15:08 London Paddington to Didcot Parkway
15:12 London Paddington to Newbury
15:37 Didcot Parkway to London Paddington
15:38 London Paddington to Didcot Parkway
15:55 Newbury to London Paddington
16:05 London Paddington to Newbury
16:07 London Paddington to Didcot Parkway
16:34 Newbury to London Paddington
16:50 London Paddington to Didcot Parkway
17:05 London Paddington to Newbury
17:20 London Paddington to Didcot Parkway
Delayed
13:00 Bristol Temple Meads to London Paddington
13:50 London Paddington to Great Malvern
13:50 Cardiff Central to London Paddington
14:00 London Paddington to Bristol Temple Meads
An additional train service has been planned to operate as shown 14:12 Reading to Slough
etc
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 10, 2025, 14:29:26 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[110] Ryanair sues 'unruly' passenger over flight diversion
[98] Mick Lynch announces retirement as head of RMT
[53] Thames Valley infrastructure problems causing disruption elsew...
[52] Westminster Hall debate : Railway services to South West
[46] Birthday trip, Melksham to Penzance - 28th January 2025
[25] A Beginner's Guide to the Great Western "Coffee Shop" Passenge...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 [2] 3 4 ... 16
  Print  
Author Topic: London Waterloo - station, services, facilities, incidents - and some quirks / odd facts (merged posts)  (Read 97792 times)
Brucey
Global Moderator
Hero Member
*****
Posts: 2259


View Profile WWW
« Reply #15 on: April 14, 2013, 14:43:21 »

Person hit by a train at South Croydon earlier resulted in considerable delays on all routes from London to Southampton and Portsmouth.  That is in addition to the engineering work already planned between Haslemere-Petersfield.
Logged
MrC
Full Member
***
Posts: 45


View Profile
« Reply #16 on: April 14, 2013, 17:20:51 »

Or next Sunday - the London Marathon....

Oops. Work not carried out due to on-site equipment failure and currently proposed to be re-scheduled for 20/21.......
Logged
Brucey
Global Moderator
Hero Member
*****
Posts: 2259


View Profile WWW
« Reply #17 on: April 14, 2013, 17:29:14 »

B****r.  I am making several tight connections through Waterloo on both Saturday and Sunday next week.

Here is the official info from SWT (South West Trains): http://www.southwesttrains.co.uk/MEW.aspx

Copied here, for when the website is updated:
Quote
Work was due to take place on 13/14 April to repair a rail defect in the Waterloo area. This was a major piece of work that needed around 16 hours to complete and this work had been scheduled to take place at the earliest possible opportunity.

Unfortunately due to a problem with the technical equipment being used by our external contractors carrying the work, the work could not be completed over the weekend. These technical equipment problems were only uncovered as the work commenced.

We are extremely disappointed that this work could not take place as planned and we are following this up with our external contractors as a matter of priority.

The work is now being planned to take place at the next possible opportunity and to ensure the least amount of impact on our customers.  The work is currently scheduled to take place over the weekend of 20/21 April.  We will confirm more details about the impact this major engineering work will have on our services early next week.  In the meantime, our dedicated team of engineers will continue to monitor the area to enable us to continue to deliver our normal train service.

At this stage, we are not expecting this to have any impact on any of our services over the coming week, and we are planning to run our full train service on Monday 15 April.   We will keep you informed of any further changes needed to facilitate this major engineering work.
Laughable is an understatement.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13032


View Profile Email
« Reply #18 on: April 14, 2013, 19:47:20 »

And how many 000's of marathon runners wont niw be able to use the trains to get into London. Reckon there's going to be trouble ahead....
Logged
Brucey
Global Moderator
Hero Member
*****
Posts: 2259


View Profile WWW
« Reply #19 on: April 14, 2013, 22:09:40 »

It will be interesting to see the revised timetable.  One would hope the bulk of the work will be done overnight.
Logged
Brucey
Global Moderator
Hero Member
*****
Posts: 2259


View Profile WWW
« Reply #20 on: April 16, 2013, 14:08:39 »

The amended timetable has been released at http://www.southwesttrains.co.uk/MEW.aspx

I won't copy the entire timetable here, just the summary is included below:
Quote
Work was due to take place on 13/14 April to repair a rail defect in the Waterloo area. This was a major piece of work that needed around 16 hours to complete.

Unfortunately due to a problem with the technical equipment supplied by our external contractors, the work could not be completed on 13/14 April.

The work has now been planned to take place on Sunday 21st April. Customers with advance tickets that are booked to travel on specific trains are able to use other services as  fare restrictions have been lifted on Sunday 21 April.  A normal Saturday train service will run on Saturday 20th April.

The access required by the engineers will mean that platforms 1 to 10 at London Waterloo will be out of use on Sunday 21 April until approximately 16:00hrs.

A very limited train service will run out of London Waterloo as a result of this work.

Once the work has been completed at 1600hrs a full Sunday service will operate with some trains formed of more coaches than normal.

This work will be taking place in addition to our regular programme of engineering improvement work. Please check here to see how these works may also affect your journey.

London Marathon Participant / Spectator Advice

We strongly advise customers travelling on our services to check before you travel and allow more time to complete your journey. This is due to a significant reduction in the number of trains we can run into and out of London Waterloo until 1600hrs due to the work taking place; we expect all services running into London Waterloo will be extremely busy.

Alterations to your Train Service

Please use the expandable links below for more details about the service on Sunday 21 April. Please also note that our timetable is being amended to reflect these alterations and this information is currently not showing in the online Journey Planners. This will be available on Thursday 18 April.
Logged
johngreg
Full Member
***
Posts: 37


View Profile
« Reply #21 on: July 05, 2013, 14:15:49 »

Given the fact that Platform 20 is apparently coming back into use next year, what is the difference with this platform to the others?

http://www.southwesttrains.co.uk/Historic-journey-marks-the-first-anniversary-of-the-South-West-Trains-and-Network-Rail-Alliance.aspx
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7371


View Profile
« Reply #22 on: July 05, 2013, 15:14:55 »

I think it can be accessed on the level from 19. For the others they would need to rebuild what is now access from underneath.
Logged
Andrew1939 from West Oxon
Hero Member
*****
Posts: 535


View Profile Email
« Reply #23 on: July 05, 2013, 16:25:22 »

Why is it necessary to rebuild? It was always easy enough to move to and from domestic and the international trains in the days of Eurostar use. Most people arriving or departing Waterloo go to or from the outside world simply because it is a terminus. There can be some domestic transfer traffic but how much is that of the total movements?
Logged
Brucey
Global Moderator
Hero Member
*****
Posts: 2259


View Profile WWW
« Reply #24 on: July 05, 2013, 16:59:50 »

The international platforms (except 20) all require access via an escalator or stairs to the concourse below.

Being a Waterloo commuter, I can imagine the chaos if you tried to fit as 12 coach Class 450 of passengers (over 1000 people, all of whom are in an unnecessary rush) down the few escalators that are there at present.
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4497


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #25 on: July 05, 2013, 17:46:49 »

Number of factors.
The concourses below platform level were constructed as separate arrivals and departures apparently its not easy to link them together, also they exit at low level all of which were not built to the passenger density of commuter trains
The throat for the international platforms was built for 4 per hour arrival and departure to make use of all the international platforms will require extensive throat remodelling.
There are also longer term plans being expressed by the land owners of the office buildings along York Road which could incorporate the international platforms, its likely the international station will be demolished in the longer term
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
broadgage
Transport Scholar
Hero Member
******
Posts: 5632



View Profile
« Reply #26 on: August 02, 2013, 17:23:39 »

Due to emergency engineering work, dont know if it is heat related or something else.
Many cancellations, and other services running only part of the route.

Details on SWT (South West Trains) website.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
Brucey
Global Moderator
Hero Member
*****
Posts: 2259


View Profile WWW
« Reply #27 on: August 02, 2013, 20:31:47 »

There were two issues, one at Waterloo and the other somewhere between New Malden and Surbiton on the down fast.

This was the second day of disruption for many Waterloo commuters.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13032


View Profile Email
« Reply #28 on: October 23, 2013, 15:04:32 »

First test train - a 5car 485, I think - in & out of Platform 20 this morning.

RealTime Trains has it thus
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #29 on: October 23, 2013, 15:33:37 »

It was apparently just a normal in service 455 diverted into P20 as it's been declared available for public use.  Testing and train crew familiarity runs using various stock has been going on for some months, and is still planned, looking ahead in realtime trains; but there doesn't seem to be any regular passenger services in the short term.

Photo from Paul Bigland here:  http://paulbigland.zenfolio.com/p368327642/h39272067#h39272067

The 458/5s are are not yet in passenger service, I wouldn't expect them to be accepted for a few weeks yet.  With the second only arriving this week I'd expect they've still got multiple working to test, and mileage accumulation etc etc.

Paul
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 [2] 3 4 ... 16
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page