Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 16:55 21 Apr 2025
 
- Gatwick worst for delays among UK airports
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 10/05/25 - BRTA Westbury
10/05/25 - Model Railway Show, Calne
13/05/25 - Melksham TUG / AGM
14/05/25 - West Wiltshire RUG

On this day
21st Apr (1958)
Battery Multiple Unit enters public service (link)

Train RunningCancelled
15:28 Weston-Super-Mare to London Paddington
15:42 Exeter St Davids to London Paddington
15:49 Worcester Foregate Street to Bristol Temple Meads
15:58 London Paddington to Bristol Temple Meads
16:07 London Paddington to Bristol Parkway
16:50 Falmouth Docks to Truro
16:50 Plymouth to London Paddington
16:59 Basingstoke to Reading
17:00 Oxford to Reading
17:07 London Paddington to Didcot Parkway
17:07 Newbury to Reading
17:20 Truro to Falmouth Docks
17:27 Bristol Parkway to London Paddington
17:50 Falmouth Docks to Truro
18:27 Bristol Parkway to London Paddington
18:30 Bristol Temple Meads to London Paddington
19:00 London Paddington to Plymouth
20:20 St Erth to St Ives
20:34 St Ives to St Erth
20:50 St Erth to St Ives
21:05 St Ives to St Erth
21:20 St Erth to St Ives
21:37 St Ives to St Erth
22:30 St Erth to St Ives
22:48 St Ives to Penzance
23:30 Cardiff Central to Bristol Temple Meads
Additional 23:36 Westbury to Bristol Temple Meads
Short Run
12:15 Penzance to London Paddington
13:00 Cardiff Central to Penzance
13:23 Portsmouth Harbour to Cardiff Central
13:30 Cardiff Central to Portsmouth Harbour
14:00 Cardiff Central to Penzance
14:15 Penzance to London Paddington
14:23 Portsmouth Harbour to Cardiff Central
14:30 Cardiff Central to Portsmouth Harbour
14:49 Plymouth to Cardiff Central
14:59 Cardiff Central to Taunton
15:15 Taunton to Cardiff Central
15:15 Plymouth to London Paddington
15:18 Worcester Foregate Street to London Paddington
15:23 Portsmouth Harbour to Cardiff Central
15:27 Bristol Parkway to London Paddington
15:30 Cardiff Central to Portsmouth Harbour
16:00 Cardiff Central to Taunton
16:00 London Paddington to Penzance
16:15 Penzance to London Paddington
16:24 Portsmouth Harbour to Cardiff Central
16:27 Cardiff Central to Portsmouth Harbour
16:30 London Paddington to Plymouth
16:31 Barnstaple to Axminster
16:45 London Paddington to Great Malvern
16:47 Bristol Temple Meads to Warminster
16:50 Penzance to Cardiff Central
17:00 Cardiff Central to Taunton
17:10 Taunton to Cardiff Central
17:24 Portsmouth Harbour to Cardiff Central
17:27 Cardiff Central to Portsmouth Harbour
17:50 Penzance to London Paddington
18:00 Cardiff Central to Penzance
18:10 Taunton to Cardiff Central
18:24 Portsmouth Harbour to Cardiff Central
18:29 Warminster to Bristol Temple Meads
18:30 Cardiff Central to Portsmouth Harbour
18:30 London Paddington to Plymouth
19:00 Cardiff Central to Penzance
19:15 Taunton to Cardiff Central
etc
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 21, 2025, 17:05:02 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[115] Fortuitous connections ... and an App which fails to offer the...
[99] Firstgroup's rail division trading 'ahead of expectations'
[82] Eyesight rules for motorists unsafe, says coroner
[68] RNLI station celebrates 10 years of saving lives - Portishead,...
[56] Every way to travel between Devon/Cornwall to London rated
[49] Salisbury Station, 2025 edition
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Checking the macro by looking at many of the micro  (Read 5515 times)
grahame
Administrator
Hero Member
*****
Posts: 43862



View Profile WWW Email
« on: July 15, 2012, 19:48:44 »

When we take a look at "what should the future service look like", we need to consider the macro - looking at the overall flows - customer, could-be customer and future customer.  There's no way that any service is going to meet everyone's needs, and the trick is to meet 90% of the needs at 10% of the cost of service that would truely meet absolutely all needs.

However, I've taken to testing the macro proposals / suggestions for the future service against the micro of each individual case I come across of people travelling in and around the corridor, and asking "would the new service, and the elements around it that are planned / proposed / suggested" work.

Case in point - this evening.  A visitor to Melksham arrived after a train journey from Nottingham.  Booked onto the sole train of the day that runs from Swindon and Chippenham to Melksham, she got caught up in (overunning?) engineering works - a Nottingham to Cardiff train that was terminated at Birmingham, and so rather than a Cheltenham / Gloucester change, she ended up being advised to take a train to Temple Meads and change there.  And that would have worked, save for the fact that the FGW (First Great Western) train coming up from Paignton was scheduled to make a 10 minute connection at Chippenham into the Melksham train, but was running 12 late.  On being advised of this over the phone, I took an executive decision to drive up to Chippenham, rather than rely on either (a) The TransWilts also being late or (b) the TransWilts being held.   I'm fully aware that FGW would have had to provide a taxi if the connection missed, there being no other train until 06:30 tomorrow (and indeed the connection, being last of the day, should have been helpd), but I was also aware that we had a single traveller on her own, not fully aware of the system, and with English as a second language.  And I was not prepared to take the risk of a customer arriving, greatly delayed ang agitated, at our place.

What if we had 8 trains per day already? and What if we had the information systems and pocket timetables - Melksham to Bath and Bristol - in place?  I would have been ablt to advise "Get the next train to Trowbridge and change there".  Somewhat paradoxically, the solution this evening isn't in the frequency but in the information systems - I'm really glad we're looking to those too - as this Melksham -> Bath / Bristol is an important flow.

But ... this is one of the 90% (as most cases are when I test them).  Didn't work on current provision. Will work on future provision.



Two more guests arriving in about an hour, who live not too far from Heathrow. They've taken a look at their options and decided to drive.  Couldn't come earlier ... again, 8 a day including a mid evening southbound and you have a complete customer service.  Another two of the 90%
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #1 on: July 16, 2012, 09:06:37 »

Grahame perhaps I should accuse you of plagiarism with your Macro/Micro analysis as it was of my rock throwing exercises in another post. However, I am glad you've picked it up and see that it applies to the Transwilts.

It may be that the "bean counters" but more likely transport planners are beginning to realise the railway is a total system and should be planned as such rather the pre 1922 attitude that has prevailed up until now where every line and station belonged to different companies and had to compete with the station down the road on a different line.

I take a bit of heart from todays electrification announcement for Swansea and the  MML» (Midland Main Line. - about) but that still seems to stop at Sheffield rather than Moorthorpe as mentioned in another post. Plus the tram train plan for Rotherham seems to make the ability electrify North of Sheffield by both routes at 25KV difficult whereas 600DC/25KV Ac trams are perfectly feasable. Go to Kassel.

However I despair at a post on the Heatrow Western Junction thread  that Crossrail is a separate entity at Abbey Wood with no onward passenger connection to Dartford.

It's similar to the stupid situation at Highbury and Islington where you cannot run a through service from the NLL to the ELL because you can't change voltage in a platform in case the wire breaks  when the pan rises. The person that said that should have been confined to Farringdon station and made to wait until the wire breaks.

I know Electrictrain says voltage changes require expensive equipment but we know it works at least with OLE (Overhead Line Equipment, more often "OHLE") and Third rail we don't have to do what they do at Aachen, 
To quote Wikapedia:

"In 1966, Aachen Hauptbahnhof was electrified. Due to its proximity to Belgium, it was decided to implement the switching point from the Deutsche Bahn's 15 kV AC to the 3000 V DC (Direct Current) used by the NMBS/SNCB in the station. Tracks 6 to 9 therefore have a switchable catenary and are used for international Thalys, ICE and RegionalExpress services."

How many million times has it worked at Farringdon?

The other thing in the macro field is to save the cost of the Crossrail turnback sidings at Maidenhead and put the money into the GWML (Great Western Main Line) electrification pot instead of Crossrails.
Logged
John R
Hero Member
*****
Posts: 4416


View Profile
« Reply #2 on: July 16, 2012, 12:12:29 »

How many million times has it worked at Farringdon?
And at Drayton Park.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5346


View Profile
« Reply #3 on: July 16, 2012, 13:29:19 »

It's similar to the stupid situation at Highbury and Islington where you cannot run a through service from the NLL to the ELL because you can't change voltage in a platform in case the wire breaks  when the pan rises. The person that said that should have been confined to Farringdon station and made to wait until the wire breaks.

The person who said that was quite wrong, as far as I can work out.

The reason there are no through services is that there is no timetable capacity for trains heading east along the NLL to cross over onto the southbound ELL.  The track layout along the NLL is that normal services uses the inner tracks, and the outer tracks are long freight loops. 

Then simply because there are no through services planned they did not extend the OHLE (Over-Head Line Equipment (electrification via catenary)) into the platform at Farringdon much at all, it stops beyond the normal stopping point, ie not above the trains, and the route is not signalled for normal movements anyway.

It's chicken and egg.  They haven't provided for traction changeover in the platform because it isn't needed, and someone's turned that on its head to say that it isn't there because it can't be done.  Which is clearly not the same thing.

Changeover in the platform is routinely done at a number of other places in the LO system as you must be aware, and also at number of other places that aren't in platforms, whichever is best for the situation.

Paul
Logged
grahame
Administrator
Hero Member
*****
Posts: 43862



View Profile WWW Email
« Reply #4 on: July 17, 2012, 05:46:56 »

I've - err - been checking each individual travel request / requirement as it comes up against future plans for rather a long time, but very much aware that they have to fit into the whole. Not sure that I conciously copied any ideas in that direction; rather felt it was a natural / obvious thing to do, without getting hung up on occasional "doesn't work for him" cases. Sorry if toes have been trodden on ... and clear thanks to whoever inspired the approach.
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
grahame
Administrator
Hero Member
*****
Posts: 43862



View Profile WWW Email
« Reply #5 on: July 21, 2012, 10:19:05 »

Further check against future service with our end of week / weekend traffic.

a) The 19:47 departure did NOT work for our delegate - lady travelling on her own, to Nottingham.   Arrival there at 00:18 was too late for last onward bus home.  A train between 16:30 and 18:30 would have worked for her.

b) Arrival today - flight into Heathrow, middle of the day.  Unlikely to be able to make 15:22 off Swindon, and really too long to suggest he waits around if he misses that connection for the next train at 21:08.   A train every 2 hours (17:22, 19:22) between the existing ones would work for him.

c) Contact in town - jury duty in Swindon over coming weeks, and without car available.  The 07:17 to Swindon's fine, but on return (anticipated) mid to late afternoon each day, the 18:44 from Swindon is too late.  With something like a 15:44 and a 17:44 (the 18:44 comes off the Stroud Valley so will be an extra), would work.
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
grahame
Administrator
Hero Member
*****
Posts: 43862



View Profile WWW Email
« Reply #6 on: July 25, 2012, 12:28:10 »

And two other checks last night / this morning

a) Arrival from Cambridge.   Two delegates offered fares of 178.00 each return, Cambridge to Melksham (on a train earlier than they really wanted), 75.00 at the time they wanted to Chippenham, or 60.00 a bit later to Chippenham.   They chose to save 200 pounds and get a taxi from Chippenham.  Future service - yes; there will be offpeak trains that won't price people off

a) Departure to Heathrow for mid-afternoon flight.  NOT taking the 07:20 train as it's far too early.   In fact not using train at all. Future service - yes - especially when the Western link to Heathrow is there.  (Traveller expressed a strong preference for train ...)
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
grahame
Administrator
Hero Member
*****
Posts: 43862



View Profile WWW Email
« Reply #7 on: August 06, 2012, 21:28:59 »

And another ... customer travelling from Peterborough by train.  Actually bought a ticket to Melksham and timed his journey to be only the only train in the day that's shown to connect.   Got held up for 20 minutes outside Reading and the connection at Swindon missed by a couple of minutes ... we picked him up from Chippenham.

Future service ... just about yes. He would probably have waited for the next train, rather than having to make non-rail arrangements because it was the last train of the day.
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
grahame
Administrator
Hero Member
*****
Posts: 43862



View Profile WWW Email
« Reply #8 on: August 12, 2012, 10:42:11 »

Customer from overseas today (Sunday) who doesn't have a car wanting to have a day in London.  Current service - no.   Alternative being used - taxi to Chippenham. Future service - yes.

Lisa and I invited to meet up with her brother (who also lives overseas) when the cruise he's on calls at Portland for the day on Sunday, 2nd September.   Current service - no.  Alternative being used - we'll drive down the night before, spend the day with them, and drive back afterwards. Future service - yes.
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page