That's Bristol Temple Meads, fairly obviously - but what's the apparent attempt to raise one of the paving slabs all about??
I selected each of the pictures to represent something ... I can remember most of them.
These are all things which the next franchise bidder needs to consider at least to some extent!
85 Diversions during engineering and emergency working, and effect on regular services
58 Ensuring occasional travellers get on the right train
83 Outdoor dining at stations
04 The future of the Sprinters
92 "The Dance" - the connection leaves just as the train with the passengers for it pulls in!
03 The future of the
HST▸ 62 Evening out - looking after the customers
46 Keeping people waiting on the platform when the trains already in the station
69 A ststion with no trains due is a wasted resource if people want to travel
60 How to service Bedwyn if electrification ends at Newbury
52 How many staff do we need on a train
20 Maintaining and upgrading while keeping trains running
48 Filling all the trains, all the time
81 Helping unsighted passengers. Operating services along the sea wall.
73 Looking after historic buildings and making modern use of them
33 Weekend overcrowding
00 Short routes, individual services - or joined into longer ones?
16 Use of old trackbeds - bring some back to rail life?
99 Health and safety
31 Electrification
01 Visibility and sighting of signals
64 Provide frequent enough trains to meet the passenger flows available
02 Express all the way, or making regional stops?
49 Enough capacity, please
29 Feeding and watering the customers
34 Platform edges - keeping them safe
19 Running trains through the snow
67 Passengers, the community and the local authorities all want to work to help you
56 The time taken at station stops to unload large crowds
37 Substituting new urban apropriate stock
35 Transferring passengers with international connections
26 Providing surfaces that people can pick up things they drop from
43 Sharing tracks with heritage and special train operators
32 Rebuilding while still running trains
70 Holidaymakers
90 Connections and connection information as soon as you get off the arriving train
14 Sharing stations with your neighbours
74 Providing enough luggage space on trains
42 Run a sensibly timed service and people WILL use it
89 The train as a part of the countryside
75 Occupying the customers while travelling, and providing enough space at their seats too
45 Connecting with busses within towns and cities all around
22 Passenger's onward journeys in London
71 Many trains across the network are due to retire in less than 10 years
54 Don't run trains like buses - two at a time, then a long gap
96 Giving information, but avoiding excessive signage
12 Painting trains so that people know which is theres
94 Vandalism, Fare dodging and other illegal and antisocial matters
66 Community - good publicity with Santa, and capturing the rail customers young
06 Better station facilities
98 Keeping an eye on the hidden spots on the network
40 Payment methods and car parking payment
11 Wide enough and long enough platforms
76 Closing the slam doors at smaller stations
97 Avoiding smooth icy surfaces in winter
47 Providing public toilets which are open when people want to pee or poo
88 Unprotected footpath crossings
51 Looking after the long distance commuter, especially at places near to but not on lines to be electrified
82 Considering the various things people take with them
93 Staff levels - single man operation at unstaffed stations?
77 Providing enough space in station carparks
17 The Sleeper
55 Dealing with crush hour out of London
21 Providing pleasant atmosphere at major stations
10 Wheelchair provision on trains
23 Lighting Stations
27 Providing useful information on information systems
41 The 24 hour railway. People want trains at all hours
59 Helping people find their platform
63 People will move their journey an hour or so - but not much more
05 Overcrowding of existing trains when you improve connections
87 Looking after the boundary fence
30 Providing internet access at stations and on the move
25
Bustitution▸ (and easy transfer bus <-> train in such circumstances)
65 You need nough space on the platform at intermdiate stations for all of the passengers
84 Recycling and other environmental issues
28 Connecting widely around the
UK▸ rail network
61 Provide a service for Ramblers, or just run through their walking areas?
08 Market intelligence to predict when trains will be busy
15 Carrying cycles and those with walking sticks
39 Railway
PR▸ for the public - what is "a train" to the public?
44 Onward transfers - 80% or people use powered transport at one end of their journey
80 Connections with boats
95 Ensuring the safety of listed structures at an affordable price
78 Running on the same tracks as other passenger train operators
18 Ticket checking - platform one at Paddington
91 Sharing with freight operators
79 Level Crossings
24 Engineering works
86 Redundant facilities - can they be used / what to do with the site
36 Providing nice places to queue
A few duplicated and overlapping thoughts in there, and handful of pictures not described, and no doubt many things I have missed out through lack of an illustration to remind me!
To see an individual image, look at a URL like this one and replace the "08" with the 2 digit code of your choice:
http://www.firstgreatwestern.info/pickle/ref_08.jpg