Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 09:35 12 Jan 2025
 
- 'My partner hid and secretly waved off my ship': LGBT veteran monument revealed
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 14/01/25 - Rail Sale starts
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end
24/01/25 - Bristol Rail Campaign AGM 2025

On this day
12th Jan (2009)
A quiet day in previous years (link)

Train RunningCancelled
09:21 Falmouth Docks to Truro
09:30 Bedwyn to Reading
12/01/25 10:55 Cardiff Central to Penzance
12/01/25 14:30 London Paddington to Exeter St Davids
15:20 Plymouth to Gunnislake
16:11 Gunnislake to Plymouth
12/01/25 17:09 Weston-Super-Mare to Severn Beach
17:23 Swansea to London Paddington
17:25 Cardiff Central to Trowbridge
17:44 Plymouth to Gunnislake
12/01/25 18:10 Weston-Super-Mare to Severn Beach
18:28 London Paddington to Weston-Super-Mare
12/01/25 18:35 Severn Beach to Bristol Temple Meads
18:35 Gunnislake to Plymouth
18:58 London Paddington to Bristol Temple Meads
19:35 Severn Beach to Bristol Temple Meads
20:08 Trowbridge to Cardiff Central
20:25 Avonmouth to Bristol Temple Meads
20:26 Exeter St Davids to Bristol Temple Meads
20:28 Weston-Super-Mare to London Paddington
20:37 Trowbridge to Bristol Temple Meads
21:05 Weston-Super-Mare to Bristol Temple Meads
21:28 London Paddington to Bristol Temple Meads
22:00 London Paddington to Swansea
22:35 Bristol Temple Meads to Trowbridge
Short Run
08:00 Bristol Temple Meads to Penzance
08:15 Penzance to London Paddington
09:43 Reading to Bedwyn
09:46 Exeter St Davids to Cardiff Central
11:50 Penzance to Cardiff Central
12/01/25 13:35 Severn Beach to Weston-Super-Mare
12/01/25 15:00 Cardiff Central to Penzance
15:08 Trowbridge to Cardiff Central
12/01/25 15:10 Weston-Super-Mare to Severn Beach
15:28 London Paddington to Taunton
12/01/25 15:35 Severn Beach to Weston-Super-Mare
15:42 Exeter St Davids to Cardiff Central
15:53 London Paddington to Bristol Temple Meads
16:05 Trowbridge to Cardiff Central
12/01/25 16:35 Severn Beach to Weston-Super-Mare
17:28 London Paddington to Weston-Super-Mare
17:55 Penzance to London Paddington
18:00 Cardiff Central to Taunton
18:25 Cardiff Central to Trowbridge
18:57 Taunton to London Paddington
19:00 Cardiff Central to Taunton
19:25 Cardiff Central to Trowbridge
Delayed
07:36 London Paddington to Great Malvern
07:38 London Paddington to Didcot Parkway
07:45 Bristol Temple Meads to London Paddington
07:47 London Paddington to Penzance
07:57 London Paddington to Exeter St Davids
08:40 Bristol Parkway to London Paddington
08:44 London Paddington to Great Malvern
08:46 London Paddington to Penzance
08:48 London Paddington to Didcot Parkway
09:00 London Paddington to Weston-Super-Mare
09:19 Didcot Parkway to Reading
An additional train service has been planned to operate as shown 10:10 Plymouth to London Paddington
10:12 Didcot Parkway to Reading
10:58 Great Malvern to London Paddington
11:58 Great Malvern to London Paddington
etc
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 12, 2025, 09:36:15 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[226] Sunday Times Travel supplement - 14 page rail special
[103] Westminster Hall debate : Railway services to South West
[48] one pound flat rate bus fares in Devon and Torbay area.
[44] Shortage of train crews on Great Western Railway - ongoing dis...
[27] Mick Lynch announces retirement as head of RMT
[23] Rail passengers face another difficult year, warn MPs
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Fallen leaves timetable?  (Read 4413 times)
Mookiemoo
Hero Member
*****
Posts: 3117


View Profile Email
« on: October 01, 2009, 18:39:35 »

Tjats what was being displayed at WOS» (Worcester Shrub Hill - next trains) this morning - as of 1st October LM (London Midland - recent franchise) are operating a Fallen Leaves timetable?

que? 

Did not know we could schedule when leaves fell!
Logged

Ditched former sig - now I need to think of something amusing - brain hurts -I'll steal from the master himself - Einstein:

"Two things are infinite: the universe and human stupidity; and I'm not sure about the the universe."

"Gravitation is not responsible for people falling in love"
IndustryInsider
Data Manager
Hero Member
******
Posts: 10365


View Profile
« Reply #1 on: October 01, 2009, 18:55:57 »

Did not know we could schedule when leaves fell!

Those clever boffins have worked it out and called it 'Autumn'. Just a excuse for certain TOC (Train Operating Company)'s to add a couple of minutes to the arrival time at the destination station of each train so that a higher percentage make the performance target.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Btline
Hero Member
*****
Posts: 4782



View Profile
« Reply #2 on: October 01, 2009, 20:02:53 »

Not sure that LM (London Midland - recent franchise) need it. Most TOCs (Train Operating Company) just add on extra minutes at the end.

Chiltern on the other hand:

(a) Need a proper leaf fall timetable - due to a wood near Amersham.

(b) Have a "proper" leaf fall ttable. What do I mean by proper? I mean one where the train is retimed properly throughout, giving accurate departure and arrival times for ALL stations, not just an excuse for adding slack at the end to prevent delay money.

LM's Leaf Fall ttable on the Cross City line (Redditch to Lichfield) includes axing the basic service from 6 tph to 4 tph! (perhaps not durign the peaks) Angry Luckily they are reinstating the lost services from December...
Logged
inspector_blakey
Hero Member
*****
Posts: 3574



View Profile
« Reply #3 on: October 01, 2009, 20:29:18 »

How customer friendly. Re-timing all their services throughout for a few weeks, forcing everyone to adjust their arrangements and remember a new timetable. And I don't buy the garbage about it being due to a wood near Amersham ("we apologize for the delay to this service, this was caused by the presence of trees in the Amersham area").

I don't think you can try claiming that Chiltern is the only UK (United Kingdom) rail operator that runs near trees.
Logged
Btline
Hero Member
*****
Posts: 4782



View Profile
« Reply #4 on: October 01, 2009, 21:23:08 »

I don't think you can try claiming that Chiltern is the only UK (United Kingdom) rail operator that runs near trees.

No, I'm not. Put I know that NR» (Network Rail - home page) spend A LOT of money and time, as the CHiltern route (Aylesbury branch) has a lot of leaf fall problems.

Quote
How customer friendly. Re-timing all their services throughout for a few weeks, forcing everyone to adjust their arrangements and remember a new timetable. And I don't buy the garbage about it being due to a wood near Amersham ("we apologize for the delay to this service, this was caused by the presence of trees in the Amersham area").

I'm not talking about a major re-write! All it means is that trains are scheduled to arrive and depart London at the normal times, with more accurate arrival/departure times throughout - changes to the working timetable as well. This is opposed to most TOCs (Train Operating Company) who just slap an extra 5 mins at the end of every journey willy nilly without due consideration (i.e. the working timetable does not change, only the passenger one - meaning less payments).
Logged
vacman
Hero Member
*****
Posts: 2530


View Profile
« Reply #5 on: October 02, 2009, 09:59:45 »

Not sure that LM (London Midland - recent franchise) need it. Most TOCs (Train Operating Company) just add on extra minutes at the end.

Chiltern on the other hand:

(a) Need a proper leaf fall timetable - due to a wood near Amersham.

(b) Have a "proper" leaf fall ttable. What do I mean by proper? I mean one where the train is retimed properly throughout, giving accurate departure and arrival times for ALL stations, not just an excuse for adding slack at the end to prevent delay money.

LM's Leaf Fall ttable on the Cross City line (Redditch to Lichfield) includes axing the basic service from 6 tph to 4 tph! (perhaps not durign the peaks) Angry Luckily they are reinstating the lost services from December...
Have you got shares in Chiltern or somethin?
Logged
grahame
Administrator
Hero Member
*****
Posts: 43091



View Profile WWW Email
« Reply #6 on: October 02, 2009, 11:05:41 »

LM (London Midland - recent franchise)'s Leaf Fall ttable on the Cross City line (Redditch to Lichfield) includes axing the basic service from 6 tph to 4 tph! (perhaps not durign the peaks) Angry Luckily they are reinstating the lost services from December...

I used to travel to and from Alvechurch (population between 5000 and 6000) quite frequently.   It's on the Redditch line, single track, and in those days had 4 trains an hour (two each way), healthily used ones too.   Bearing in mind issues that question shave been raised on the TransWilts (where we currently have 4 trains a day calling, not 4 an hour) concerning robustness and single track occupancy, perhaps the LM timetables are so tight that the service does need to be pruned in the autumn to keep it robust.

Of course, I would love six trains an hour on the TransWilts, reduced to 4 per hour in the autumn.  Come to think of it, I would settle for 1 per hour
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
JayMac
Data Manager
Hero Member
******
Posts: 19245



View Profile
« Reply #7 on: October 02, 2009, 13:31:58 »

Whilst it may be sly for the big bad TOCs (Train Operating Company) to only add time to the final destination for the leaf-fall season, there is some pratical sense in not re-casting the entire timetable. People get used to their departure times and plan their journeys accordingly. A full timetable recast for affected routes in Sept/Oct and it's associated costs is not practical or very customer friendly.

In LM (London Midland - recent franchise)'s case, I can only assume that the extra time needed on the cross-city route (and regardless of how timetables are changed - extra time is needed during leaf-fall for safe operation) means they encounter pathing issues and have to reduce the 6tph on the central part of the route to 4tph. My reading of the timetable is that it is only Blake Street and Butlers Lane who lose out significantly, everywhere else sees a 10 minute frequency reduced to 15 minutes; not really a big upheaval. The extremities of the route; Lichfield and Redditch keep their 2tph.
Logged

"A clear conscience laughs at a false accusation."
"Treat everyone the same until you find out they're an idiot."
"Moral indignation is a technique used to endow the idiot with dignity."
IndustryInsider
Data Manager
Hero Member
******
Posts: 10365


View Profile
« Reply #8 on: October 02, 2009, 16:53:33 »

Not sure that LM (London Midland - recent franchise) need it. Most TOCs (Train Operating Company) just add on extra minutes at the end.

Chiltern on the other hand:

(a) Need a proper leaf fall timetable - due to a wood near Amersham.

(b) Have a "proper" leaf fall ttable. What do I mean by proper? I mean one where the train is retimed properly throughout, giving accurate departure and arrival times for ALL stations, not just an excuse for adding slack at the end to prevent delay money.

I'm not talking about a major re-write! All it means is that trains are scheduled to arrive and depart London at the normal times, with more accurate arrival/departure times throughout - changes to the working timetable as well. This is opposed to most TOCs who just slap an extra 5 mins at the end of every journey willy nilly without due consideration (i.e. the working timetable does not change, only the passenger one - meaning less payments).

Hmmm, Btline - I'm a little confused. Chiltern do add extra minutes willy nilly on the end of terminating trains, just like the other TOC's that have been mentioned. That applies on their principal route from Marylebone via High Wycombe to Aylesbury and Birmingham/Kidderminster. It's true that the Marylebone to Aylesbury (via Amersham) route - which accounts for about 20% of their trains - has an altered timetable whereby trains are given an extra 3 minutes, but I think you'll find that has more to do with sharing the line with LUL (London Underground Ltd) and the fact that they also have an altered timetable. If there was no LUL sharing then they would probably just add the minutes on the end like they do on their other route.

This revised timetable also has the effect of making up services leave up to 3 minutes earlier than the normal timetable which must cause some people to miss their train if they aren't regular travellers. It'll also mean trains sitting around in stations waiting time on those days during the leaf fall season where conditions are not too bad; i.e. dry, calm days.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Super Guard
Hero Member
*****
Posts: 1308


View Profile
« Reply #9 on: October 02, 2009, 17:38:50 »

Chiltern do add extra minutes willy nilly on the end of terminating trains, just like the other TOC (Train Operating Company)'s that have been mentioned.

Surely not... my illusion has been shattered  Shocked Grin
Logged

Any opinions made on this forum are purely personal and my own.  I am in no way speaking for, or offering the views of First Great Western or First Group.

If my employer feels I have broken any aspect of the Social Media Policy, please PM me immediately, so I can rectify without delay.
Btline
Hero Member
*****
Posts: 4782



View Profile
« Reply #10 on: October 02, 2009, 18:00:11 »

Yes Chiltern do on other routes.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10365


View Profile
« Reply #11 on: October 03, 2009, 15:21:32 »

Yes Chiltern do on other routes.

Right. So did you know that when you wrote your other two posts in this thread? If so, then you're peddling the same sort of spin that you're likely to get in a FGW (First Great Western) fares email...  Roll Eyes
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Btline
Hero Member
*****
Posts: 4782



View Profile
« Reply #12 on: October 03, 2009, 21:06:06 »

Yes I did, but I was talking about the Aylesbury route. I agree I did not make it clear.
Logged
northwesterntrains
Hero Member
*****
Posts: 324


View Profile
« Reply #13 on: October 06, 2009, 17:05:11 »

Northern add extra time on to their journeys for leaf fall.  Although for trains on Chester-Altrincham-Manchester line which goes through Delamere Forest, the trains won't take any extra time in the Delamere area, but will need extra time just before Manchester.  Punctuality targets coming before passenger convenience?
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page