Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 14:15 10 Jan 2025
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end
24/01/25 - Bristol Rail Campaign AGM 2025
28/01/25 - Coffee Shop 18th Birthday

On this day
10th Jan (2017)
Defibrillators discussion pack published by Network Rail (link)

Train RunningCancelled
12:50 Cardiff Central to London Paddington
13:08 London Paddington to Didcot Parkway
13:15 London Paddington to Cardiff Central
13:23 London Paddington to Oxford
13:30 London Paddington to Bristol Temple Meads
13:30 Bristol Temple Meads to London Paddington
13:48 London Paddington to Carmarthen
14:00 Greenford to West Ealing
14:02 Oxford to London Paddington
14:15 West Ealing to Greenford
14:15 London Paddington to Cardiff Central
14:23 London Paddington to Oxford
14:30 Greenford to West Ealing
14:37 Didcot Parkway to London Paddington
14:45 West Ealing to Greenford
15:00 Greenford to West Ealing
15:03 Oxford to London Paddington
15:15 West Ealing to Greenford
15:16 London Paddington to Cardiff Central
15:30 Greenford to West Ealing
15:54 Cardiff Central to London Paddington
16:00 Oxford to London Paddington
16:23 London Paddington to Oxford
17:00 Oxford to London Paddington
Short Run
10:55 Paignton to London Paddington
11:57 Great Malvern to London Paddington
13:09 Didcot Parkway to London Paddington
13:26 Weston-Super-Mare to London Paddington
13:32 London Paddington to Cheltenham Spa
13:38 London Paddington to Didcot Parkway
13:48 Didcot Parkway to London Paddington
13:56 Newbury to London Paddington
14:03 London Paddington to Penzance
14:06 London Paddington to Newbury
14:08 London Paddington to Didcot Parkway
14:15 Didcot Parkway to London Paddington
14:20 Carmarthen to London Paddington
14:25 Newbury to London Paddington
14:30 London Paddington to Weston-Super-Mare
14:32 London Paddington to Cheltenham Spa
14:38 London Paddington to Didcot Parkway
15:08 Didcot Parkway to London Paddington
15:08 London Paddington to Didcot Parkway
15:12 London Paddington to Newbury
15:37 Didcot Parkway to London Paddington
15:38 London Paddington to Didcot Parkway
15:55 Newbury to London Paddington
16:05 London Paddington to Newbury
16:07 London Paddington to Didcot Parkway
16:34 Newbury to London Paddington
16:50 London Paddington to Didcot Parkway
17:05 London Paddington to Newbury
17:20 London Paddington to Didcot Parkway
Delayed
13:50 London Paddington to Great Malvern
14:00 London Paddington to Bristol Temple Meads
14:12 Newbury to Reading
An additional train service has been planned to operate as shown 14:12 Reading to Slough
etc
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 10, 2025, 14:18:56 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[117] Ryanair sues 'unruly' passenger over flight diversion
[69] Mick Lynch announces retirement as head of RMT
[56] Thames Valley infrastructure problems causing disruption elsew...
[55] Westminster Hall debate : Railway services to South West
[49] Birthday trip, Melksham to Penzance - 28th January 2025
[26] A Beginner's Guide to the Great Western "Coffee Shop" Passenge...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Collision between train and engineering trolley at Challow, 21st October 2021  (Read 7914 times)
JayMac
Data Manager
Hero Member
******
Posts: 19245



View Profile
« on: November 19, 2021, 20:52:04 »

From the Rail Accident Investigation Branch:

Quote
Published
18 November 2021


At 06:09 hrs on 21 October 2021, the 05:23 hrs Great Western Railway passenger service from London Paddington to Swansea struck an engineering trolley left on the line near Challow in Oxfordshire. The train was travelling at 123 mph (198 km/h) at the time of the collision.

The train came to a stand around 1.5 miles beyond the point of collision. There were no injuries among the passengers on board and the train did not derail. However, the handle of the trolley became wedged under the leading bogie of the train while the trolley itself caused some damage to the train’s underframe. The collision resulted in minor damage to the track, while the trolley appears to have been destroyed by the impact.

The train involved in the collision was the first train to pass through the area after the track was handed back following engineering work which had taken place during the previous night. RAIB (Rail Accident Investigation Branch)’s preliminary examination found that the trolley had been inadvertently left on the railway line following this work, which had taken place within a possession.

Our investigation will seek to identify the sequence of events that led to the collision. It will also consider:

the processes in place for managing vehicles such as trolleys within possessions

the training, competence and management oversight of the staff involved and any factors that may have influenced their actions

any relevant underlying factors.

Our investigation will also consider a similar incident which took place at 05:55 hrs on 8 September 2021, when a passenger train travelling between Staines and London Waterloo struck an engineering trolley on the approach to Twickenham station. This trolley had also been left on the line following overnight engineering work. RAIB no longer intends to publish a separate safety digest concerning this incident.

Two things. At that speed this could have ended very badly. And why has it taken nearly a month for the RAIB to become involved?
Logged

"A clear conscience laughs at a false accusation."
"Treat everyone the same until you find out they're an idiot."
"Moral indignation is a technique used to endow the idiot with dignity."
ChrisB
Transport Scholar
Hero Member
******
Posts: 13032


View Profile Email
« Reply #1 on: October 14, 2022, 18:28:10 »

From BBC» (British Broadcasting Corporation - home page) News

Quote
A train that smashed into an abandoned work trolley at 123mph should not have travelled so fast to a station afterwards, investigators have said.

The Great Western Railway (GWR (Great Western Railway)) train dragged it for a mile (1.6km) near Challow, Oxfordshire, in October 2021.

No passengers were injured. The train was damaged but did not derail.

However, investigators said it was later driven at 85mph when it should not have been driven faster than 40mph given its damage.

The London Paddington to Swansea service stopped after it hit the trolley used by workers at 06:09 BST on 21 October.

Network Rail and Hitachi Rail engineers inspected the train and it departed for Swindon, where it terminated, at 08:53. From there, it went empty to the North Pole depot in London.

The Rail Accident Investigation Branch (RAIB (Rail Accident Investigation Branch)) recommended red lights should be fixed to trolleys on both sides so they can be seen.

It found Network Rail workers failed to correctly follow processes to allow trains to run after overnight work.

It said workers should follow clearer processes and potentially use technology to ensure lines are cleared.

The trolley's handle became lodged underneath the train, causing damage to the underframe, while the track suffered minor damage. The trolley was destroyed.

A Network Rail spokesperson said: "We can never afford to be complacent when it comes to the safety of our passengers, colleagues and the general public and thankfully, no one was injured, but this incident should never have happened.

"We are sorry to all passengers and colleagues who were impacted by this incident."

Chief Inspector of Rail Accidents Andrew Hall said: "Systems and processes designed to detect any equipment left on the track before lines reopen after maintenance work should not be reliant solely on human performance in the middle of a dark night.

"There are technological solutions which can assist with addressing this issue and this accident is an example of an opportunity missed."


The trolley's handle was jammed underneath the train after it came to a stop

The RAIB report can be found here

Logged
Ralph Ayres
Transport Scholar
Hero Member
******
Posts: 400


View Profile
« Reply #2 on: October 15, 2022, 13:53:56 »

A little odd that the BBC» (British Broadcasting Corporation - home page) website headline focussed on a one sentence "observation" by the RAIB (Rail Accident Investigation Branch) (which I take to mean just a metaphorical raising of the eyebrows) rather than on its recommendations relating to the incident itself.  I suspect the anonymous author or a sub-editor is not a transport specialist.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page