Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 12:35 10 Jan 2025
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end
24/01/25 - Bristol Rail Campaign AGM 2025
28/01/25 - Coffee Shop 18th Birthday

On this day
10th Jan (2017)
Defibrillators discussion pack published by Network Rail (link)

Train RunningCancelled
12:50 Cardiff Central to London Paddington
Short Run
07:40 Penzance to Cardiff Central
14:20 Carmarthen to London Paddington
Delayed
08:15 Penzance to London Paddington
09:52 London Paddington to Hereford
An additional train service has been planned to operate as shown 12:36 Bristol Temple Meads to Cardiff Central
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 10, 2025, 12:38:57 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[141] Ryanair sues 'unruly' passenger over flight diversion
[83] Mick Lynch announces retirement as head of RMT
[66] Westminster Hall debate : Railway services to South West
[32] A Beginner's Guide to the Great Western "Coffee Shop" Passenge...
[31] Thumpers for Dummies
[23] Bristol Rail Campaign AGM 2025
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 [2]
  Print  
Author Topic: Snowdon Mountain Railway  (Read 10033 times)
grahame
Administrator
Hero Member
*****
Posts: 43076



View Profile WWW Email
« Reply #15 on: April 17, 2019, 19:14:47 »

Reopening to the summit on Easter Monday.  From the North Wales Pioneer

Quote
Vince Hughes, Snowdon Mountain Railway’s Commercial Manager, said: “There’s always a sense of real excitement as we reopen, Hafod Eryri, the summit building, for the summer season on Snowdon, but this 10th anniversary year feels even more special.

It shows how long the Coffee Shop has been around ... the first post in this thread talks about the opening of the summit building as "last year"!

Quote
Daily steam and diesel services to the top of Wales’ highest mountain are scheduled to resume from Monday, April 22nd, weather permitting. The first train will be hauled by a steam engine and will depart from Llanberis at 9.30am.

A suspect it will be pushed from behind, rather than hauled, but never mind ...
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
grahame
Administrator
Hero Member
*****
Posts: 43076



View Profile WWW Email
« Reply #16 on: January 03, 2020, 22:08:20 »

From Rail Technology Magazine

Quote
SMR recently announced its ambitious plan to replace its existing diesel locomotives with new hybrid diesel rolling stock, with each hybrid engine including an 8-tonne battery pack and a diesel generator to recharge batteries in service.

Further fixed battery chargers for overnight charging of the units are also planned.

Plans are yet to be finalised, but SMR plan to operate at Llanberis entirely on battery power, operate the generator charging on the uphill journey, turn off the generator on the downhill journey and use the regenerative braking to recharge the battery packs
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
grahame
Administrator
Hero Member
*****
Posts: 43076



View Profile WWW Email
« Reply #17 on: August 27, 2020, 05:46:25 »

From Rail Technology Magazine

Quote
SMR recently announced its ambitious plan to replace its existing diesel locomotives with new hybrid diesel rolling stock, with each hybrid engine including an 8-tonne battery pack and a diesel generator to recharge batteries in service.

Further fixed battery chargers for overnight charging of the units are also planned.

Plans are yet to be finalised, but SMR plan to operate at Llanberis entirely on battery power, operate the generator charging on the uphill journey, turn off the generator on the downhill journey and use the regenerative braking to recharge the battery packs

Snowdon Mountain Railway operating to Clogwyn (3/4 of the way up, station without facilities, 30 minute layover) this year. 

From Twitter - a nice photo and some text

Quote
We've been busy commissioning our new #hybrid locomotives since they arrived a few weeks ago. Here's No.14 Glaslyn complete with new 12-seater passenger pod.

The @ClaytonEquipltd loco uses both battery and the latest low emission Diesel engine going up, then electric regeneration braking going down with the engine switched off
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 [2]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page