Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 01:55 25 Jan 2025
 
* Her grandfather drove trains to Auschwitz. My great-grandmother died there
* Musk, MrBeast, Larry Ellison - Who might buy TikTok?
- What are my rights if home and travel are hit by storms?
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 28/01/25 - Coffee Shop 18th Birthday
02/02/25 - Western Gateway consult. ends
12/02/25 - TWSW Integrated Webinar
15/02/25 - Special Bletchey to Bicester

On this day
25th Jan (2014)
FGW announces link with Singapore Airlines (link)

Train RunningShort Run
24/01/25 22:00 Hereford to London Paddington
06:30 Bristol Temple Meads to London Paddington
06:38 Weymouth to Gloucester
14:14 Exeter Central to Barnstaple
15:03 London Paddington to Penzance
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 25, 2025, 01:56:55 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[136] Vivarail chosen for fast charging trial on the Greenford branc...
[63] Mid Cornwall Metro - APPROVED
[56] A significant day ... for squirrels, anyway ;-)
[50] Labour pledges to make Sunday trains as reliable as weekday se...
[46] Oxford station - facilities, improvements, parking, incidents ...
[36] Portishead Line reopening for passengers - ongoing discussion
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Journey between routes time Swindon to Cheltenham  (Read 7473 times)
ellendune
Transport Scholar
Hero Member
******
Posts: 4507


View Profile
« on: March 05, 2015, 07:55:54 »

Yesterday I travelled from Swindon to catch the 9:12 train from Cheltenham to Birmingham.  I arrived early at Swindon to catch the 7:50 which was being shown running late.  Since the connection is tight I decided to catch the 7:40 train to Bristol Parkway and pick my train up there.  What surprised me was just how long I had to wait at Parkway for my train (both trains were on time). 

Why is the route  through Stroud so slow compared to the long way round via Bristol Parkway? Could anything be done to speed things up.

Incidentally had I caught the 7:50 I would have caught my connecting train, but I did not know that of course. 
Logged
grahame
Administrator
Hero Member
*****
Posts: 43175



View Profile WWW Email
« Reply #1 on: March 05, 2015, 08:40:07 »


Why is the route  through Stroud so slow compared to the long way round via Bristol Parkway?

1. 75 m.p.h. stock schedules (class 150 / 153)
2. Twists and turns and climbs on the route
3. Services reverse at Gloucester on their way to Cheltenham Spa
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
stuving
Transport Scholar
Hero Member
******
Posts: 7378


View Profile
« Reply #2 on: March 05, 2015, 10:01:09 »


Why is the route  through Stroud so slow compared to the long way round via Bristol Parkway?

1. 75 m.p.h. stock schedules (class 150 / 153)
2. Twists and turns and climbs on the route
3. Services reverse at Gloucester on their way to Cheltenham Spa

And the number of stops is the other thing. If you break it down, then (approximating a bit):

Via BPW» (Bristol Parkway - next trains) it is 63 miles with no intervening stops, and takes 55 minutes in the two fast trains. The linespeed is mostly 90-100 mph, and the time reflects that plus the single stop and start for each train.

"Direct", it is 43 miles without the Gloucester detour, and three stops plus Gloucester on the way. It takes 74 minutes. The linespeed is now mostly 90 mph or more, but the train only does 75 mph. Going via Gloucester adds 17 minutes, which looks rather generous. 43 miles with no stops would take about 43 minutes, at best. And the three other stops could plausibly add the other 14 minutes.

Upgrading to 90 mph 165/166s trims about 4 minutes in running time, and perhaps a bit more in better acceleration from stops (especially if any of them are uphill). Doing something about Gloucester has more potential, even without the through platforms that are proposed in the Route Study.

But the main message is that the short route is "only" 20 miles shorter, say 20 minutes less, and being a slow stopping train adds back twice that much.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page