Overunning Engineering work is affecting services travelling through Bath with services expected to be disrupted into the evening with the work now exected to be completed by 5.30pm.
Best to check the service alterations page if you are travelling to/from Bath & Chippenham this afternoon/evening:
http://www.firstgreatwestern.co.uk/LiveUpdateList.aspxThese are the alterations that have appeared so far:
Service incidents
14:00 Weymouth to Bristol Temple Meads due 16:19
This train will be terminated at Westbury.It will no longer call at: Trowbridge, Bradford-On-Avon, Avoncliff, Freshford, Bath Spa, Oldfield Park, Keynsham and Bristol Temple Meads.This is due to over-running engineering works.
Oldfield Park and Keynsham will be served by road transport.
16:07 Exeter St Davids to London Paddington due 19:25
This train has been revised.It will no longer call at: Bath Spa and Chippenham.This is due to over-running engineering works.
16:30 Bristol Temple Meads to London Paddington due 18:36
This train has been revised.It will no longer call at: Bath Spa and Chippenham.This is due to over-running engineering works.
17:07 Weston-Super-Mare to Weymouth due 19:57
This train will be terminated at Bristol Temple Meads and restarted from Westbury.It will no longer call at: Keynsham, Oldfield Park, Bath Spa, Freshford, Avoncliff, Bradford-On-Avon and Trowbridge.This is due to over-running engineering works.
Keynsham and Oldfield Park will be served by road transport.