Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 19:35 08 Jan 2025
 
- Mother 'not surprised' son killed on London bus
* Ryanair sues 'unruly' passenger that diverted flight
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 today - Steam loco restoration - IRTE
tomorrow - Bath Railway Society
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end

On this day
8th Jan (1991)
Cannon Street buffer stop collision (link)

Train RunningCancelled
18:51 Evesham to Oxford
19:24 Reading to Gatwick Airport
19:30 Looe to Liskeard
20:05 Liskeard to Looe
20:37 Looe to Liskeard
21:05 Liskeard to Looe
21:37 Looe to Liskeard
09/01/25 05:57 Liskeard to Looe
09/01/25 06:30 Looe to Liskeard
09/01/25 07:20 Liskeard to Looe
09/01/25 07:54 Looe to Liskeard
09/01/25 08:30 Liskeard to Looe
09/01/25 09:05 Looe to Liskeard
09/01/25 09:36 Liskeard to Looe
09/01/25 10:08 Looe to Liskeard
09/01/25 10:36 Liskeard to Looe
09/01/25 11:06 Looe to Liskeard
09/01/25 11:36 Liskeard to Looe
09/01/25 12:08 Looe to Liskeard
Short Run
18:26 Exmouth to Paignton
Delayed
17:52 Trowbridge to Great Malvern
19:04 London Paddington to Plymouth
19:06 London Paddington to Bedwyn
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 08, 2025, 19:45:23 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[174] 'Railway 200' events and commemorations 2025
[82] Views sought : how train companies give assistance to disabled...
[69] Oxford station - facilities, improvements, parking, incidents ...
[54] senior railcard
[52] Coastal walks - station to station
[28] Rail Replacement bus - OK, but I prefer the train.
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 [2]
  Print  
Author Topic: Network Rail plans for CP5  (Read 6785 times)
Electric train
Transport Scholar
Hero Member
******
Posts: 4496


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #15 on: September 30, 2011, 18:08:56 »

It seems to be more of a discussion document for Control Period 5 and beyond.
That is what this document is, it is a pan National Rail industry consultation document, it is at this stage very high level

There is however surprisingly little reference to HS2 (The next High Speed line(s)).


I expect that's because it will probably be funded outside the SOFA/HLOS (High Level Output Specification) system, it isn't really a Network Rail project, and even where there'll be an interface with NR» (Network Rail - home page) it will probably not be happening until well into CP6 (Control Period 6 - The five year period between 2019 and 2024)...

Paul

CLPG is correct CP5 (Control Period 5 - the five year period between 2014 and 2019) funding is to do with the funding for the "classic National Network" HS2 and indeed HS1 (High Speed line 1 - St Pancras to Channel Tunnel) are outside the scope of the document as NR do not own these lines
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #16 on: October 04, 2011, 09:43:52 »

There is more information been added to Network Rail's website, there is an itemised list of enhancements that has appeared.

"Definition of proposed CP5 (Control Period 5 - the five year period between 2014 and 2019) enhancements", a 150 page pdf, written in a similar format to the existing CP4 (Control Period 4 - the five year period between 2009 and 2014) enhancement plans.

http://www.networkrail.co.uk/IIP.aspx and scroll down a bit...

Paul   
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 [2]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page