The 0930 trains shown (yes there are two of them) which run via Newport, are in the normal timetable - so are not actually affected by engineering works.
It's precisely because THEY are affected by planned engineering works that there are three (not two) different entries in the
XC▸ timetable for the first train
BRI» -BHM on a Sunday.
So, I stand by my point. Put the information on the 'service updates' pages of
NRE▸ and XC's website. If the info is there it's a quick reference point and negates the need to use a booking engine, journey planner or loading up .pdf timetables.
All that said, it was nice to have an XC
HST▸ on my return journey. A pleasant conversation was had with three young people (two lads and a lass) who were enjoying their last day of freedom prior to turning up at Plymouth to start their first night at HMS Raleigh with the Royal Navy. Good luck, Alex, Rich and Sam!