Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 13:35 12 Jan 2025
 
- 'My partner hid and secretly waved off my ship': LGBT veteran monument revealed
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 14/01/25 - Rail Sale starts
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end
24/01/25 - Bristol Rail Campaign AGM 2025

On this day
12th Jan (2009)
A quiet day in previous years (link)

Train RunningCancelled
12/01/25 10:55 Cardiff Central to Penzance
12:18 Penzance to London Paddington
13:33 St Ives to St Erth
12/01/25 14:30 London Paddington to Exeter St Davids
14:50 Penzance to Exeter St Davids
15:20 Plymouth to Gunnislake
16:11 Gunnislake to Plymouth
12/01/25 17:09 Weston-Super-Mare to Severn Beach
17:23 Swansea to London Paddington
17:32 Exeter St Davids to London Paddington
17:44 Plymouth to Gunnislake
12/01/25 18:10 Weston-Super-Mare to Severn Beach
18:28 London Paddington to Weston-Super-Mare
12/01/25 18:35 Severn Beach to Bristol Temple Meads
18:35 Gunnislake to Plymouth
18:58 London Paddington to Bristol Temple Meads
19:35 Severn Beach to Bristol Temple Meads
20:08 Trowbridge to Cardiff Central
20:25 Avonmouth to Bristol Temple Meads
20:26 Exeter St Davids to Bristol Temple Meads
20:28 Weston-Super-Mare to London Paddington
20:37 Trowbridge to Bristol Temple Meads
21:05 Weston-Super-Mare to Bristol Temple Meads
21:28 London Paddington to Bristol Temple Meads
22:00 London Paddington to Swansea
22:35 Bristol Temple Meads to Trowbridge
Short Run
11:50 Penzance to Cardiff Central
12/01/25 13:35 Severn Beach to Weston-Super-Mare
14:00 Cheltenham Spa to Swindon
15:08 Trowbridge to Cardiff Central
12/01/25 15:10 Weston-Super-Mare to Severn Beach
12/01/25 15:35 Severn Beach to Weston-Super-Mare
15:42 Exeter St Davids to Cardiff Central
16:05 Trowbridge to Cardiff Central
12/01/25 16:35 Severn Beach to Weston-Super-Mare
17:28 London Paddington to Weston-Super-Mare
17:37 Barnstaple to Exeter Central
18:00 Cardiff Central to Taunton
18:25 Cardiff Central to Trowbridge
19:00 Cardiff Central to Taunton
19:25 Cardiff Central to Trowbridge
Delayed
07:47 London Paddington to Penzance
08:46 London Paddington to Penzance
10:00 London Paddington to Penzance
11:58 Great Malvern to London Paddington
17:25 Cardiff Central to Trowbridge
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 12, 2025, 13:54:22 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[188] Sunday Times Travel supplement - 14 page rail special
[86] Westminster Hall debate : Railway services to South West
[53] The User Group onion
[40] one pound flat rate bus fares in Devon and Torbay area.
[36] Shortage of train crews on Great Western Railway - ongoing dis...
[22] Mick Lynch announces retirement as head of RMT
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Network Rail's Signalling standards  (Read 4535 times)
Trowres
Transport Scholar
Hero Member
******
Posts: 806


View Profile
« on: September 15, 2010, 23:54:57 »

Here's a photo showing the Newport Area Resignalling in progress. The left-hand gantry is from the 1962 resignalling,  being replaced by the larger version on the right.



I don't know how much this gantry contributes to the ^150m stated cost of the resignalling (South Wales total comes to ^400m unless you know otherwise). There are other similarly chunky structures. Perhaps someone in the know could explain
a) why two ladders are necessary on the new structure
b) why it's mounted on such enormous concrete blocks?

I believe the scheme was designed by a proud private sector company. I wonder what requirements were in their brief?
Logged
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #1 on: September 16, 2010, 09:12:03 »

Even worse I believe the new gantry is not high enough to sling the wires.

It looks as if it has been built to withstand a Scale 8 Earthquake or an HST (High Speed Train) derailing and hitting it.
« Last Edit: September 17, 2010, 00:00:40 by eightf48544 » Logged
smokey
Hero Member
*****
Posts: 1129


View Profile
« Reply #2 on: September 16, 2010, 20:35:09 »

Here's a photo showing the Newport Area Resignalling in progress. The left-hand gantry is from the 1962 resignalling,  being replaced by the larger version on the r

I don't know how much this gantry contributes to the ^150m stated cost of the resignalling (South Wales total comes to ^400m unless you know otherwise). There are other similarly chunky structures. Perhaps someone in the know could explain
a) why two ladders are necessary on the new structure
b) why it's mounted on such enormous concrete blocks?

I believe the scheme was designed by a proud private sector company. I wonder what requirements were in their brief?

PROFIT PROFIT PROFIT oh and PROFIT  Grin
Logged
grahame
Administrator
Hero Member
*****
Posts: 43093



View Profile WWW Email
« Reply #3 on: September 17, 2010, 17:48:11 »

It looks rather over-engineered, doesn't it?    I'm going to work on an educated guess that the new structure was more expensive to build in real terms that the old one, and suggest that this is a good illustration of why costs have risen so rapidly and dramatically in the rail industry.

Were there any problems with the 1962 gantry during its 50 years?  Did it wear out and need replacing?  Vibrate in the high wind so that the signals could not be seen?  Suffer congestion as lots of people all wanted to get onto it at the same time?  Did anyone accidentally fall off it?   If the answer to all of these is "no" then perhaps it would have been logical and cheaper to replace like for like?
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
IndustryInsider
Data Manager
Hero Member
******
Posts: 10365


View Profile
« Reply #4 on: September 17, 2010, 17:55:53 »

From the perspective of the picture it looks like all you'd have to do to thwart the anti-climb cover to the base of the steps is to climb up onto that massive concrete block.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Electric train
Transport Scholar
Hero Member
******
Posts: 4497


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #5 on: September 17, 2010, 18:03:19 »

Trust me that is a small signal gantry the ones installed on the Colchester / Clapton scheme are enormous.

There are a number of things that contribute to the design, the weight of the installed equipment, the wind loading on the equipment and the structure, there has to be an allowance made to with stand the weight of as many average men that could possibly stand on the platform then add a % The hight is to allow clearance for OHLE and possibly sighting distance.  The foundations will be calculated from the above data also possibly the surface size indicates they my be gravity foundations hence they are not very deep

2 ladders I suspect that has something to do with confined space working allowing for an escape route for staff working on the gantry

Oh and Signaling projects always go over budget Grin
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page