08:30 London Paddington to Newquay due 14:18
08:30 London Paddington to Newquay due 14:18 is being delayed between Chippenham and Westbury and is now expected to be 15 minutes late.
This is due to a late running freight train.
Flagging this one up ... the single line section of the route being used for West Country main line trains this week is struggling to cope. The 11 out of 18 local trains withdrawn each day, and still problems. Not really a surprise as this section survived the Beeching Era as a single track freight route with a couple of trains passing over its otherwise-sleeping tracks each week, and with junction designs and signalling reduced to minimum cost which goes alongside restricted capacity.
The section was singled at the same time as Swindon to Kemble was singled. With blossoming local passenger traffic, the need for a robust diversionary route for the now-more-frequent west country trains, the new freight traffics from Southampton to the north, and from the Somerset quarries eastwards and northwards, perhaps it's time to redouble this section too? Plans are afoot for an
HS2▸ track construction plant at Westbury ... I don't know how incoming materials would arrive, but the natural outbound direction for the trains of track panels would be via Swindon.