The 225 Castle Class that GWR▸ uses is the same.
IMO▸ a rather sensationalist headline that implies ALL trains will not be accessible.
Well, it is (at least in part) a campaigning organisation. But if you read down, the
TPE▸ words do say this applies to just two trains in use for six months or less, which isn't the tenor of the surrounding text. If it was, it would be fair to include that that's only a plan, and reality might not deign to follow it.
That cuts both ways. If it is just two trains, would it be that hard to get two with the conversions done?