Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 16:35 28 Apr 2025
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 10/05/25 - BRTA Westbury
10/05/25 - Model Railway Show, Calne
13/05/25 - Melksham TUG / AGM
14/05/25 - West Wiltshire RUG

On this day
28th Apr (1996)
GNER franchise (Sea Containers) starts on ECML (*)

Train RunningCancelled
16:05 London Paddington to Newbury
16:26 Frome to Bristol Temple Meads
16:35 London Paddington to Plymouth
16:47 Bristol Temple Meads to Warminster
17:07 Newbury to Reading
17:10 Reading to Newbury
17:12 Westbury to Warminster
17:30 Warminster to Bristol Temple Meads
18:10 Newbury to Reading
18:29 Warminster to Bristol Temple Meads
19:13 Salisbury to Bristol Temple Meads
19:35 Exeter St Davids to London Paddington
Short Run
13:23 Portsmouth Harbour to Cardiff Central
13:28 Weymouth to Gloucester
14:30 Cardiff Central to Portsmouth Harbour
14:35 London Paddington to Paignton
15:10 Gloucester to Weymouth
15:21 Reading to Gatwick Airport
15:55 Newbury to London Paddington
16:03 London Paddington to Penzance
16:31 Barnstaple to Axminster
16:34 Newbury to London Paddington
17:01 Severn Beach to Salisbury
17:03 London Paddington to Penzance
17:05 London Paddington to Newbury
17:24 Portsmouth Harbour to Cardiff Central
17:28 Weymouth to Bristol Temple Meads
17:36 London Paddington to Plymouth
18:00 Newbury to London Paddington
18:24 Portsmouth Harbour to Cardiff Central
18:27 Newbury to London Paddington
Delayed
13:55 Paignton to London Paddington
14:03 London Paddington to Penzance
14:30 London Paddington to Weston-Super-Mare
15:03 London Paddington to Penzance
15:28 Weston-Super-Mare to London Paddington
15:30 Bristol Temple Meads to London Paddington
15:30 Cardiff Central to Portsmouth Harbour
15:42 Exeter St Davids to London Paddington
An additional train service has been planned to operate as shown 15:57 Bristol Temple Meads to Cardiff Central
An additional train service has been planned to operate as shown 16:08 Bristol Temple Meads to Gloucester
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 28, 2025, 16:52:18 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[143] Chiltern Railways: an update on rolling stock / services
[80] Driving tests - ongoing discussion
[56] Thames Valley infrastructure problems causing disruption elsew...
[49] North Cotswold line - driver route knowledge
[38] Stop orders as cover for cancelled services
[34] Doublebagging, Rawdoggers, Barebackers
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: First Mainline ATO/ETCS Train Service (17 March 2018)  (Read 935 times)
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« on: March 21, 2018, 09:11:56 »

http://www.railwaygazette.com/news/traction-rolling-stock/single-view/view/thameslink-first-with-ato-over-etcs.html

Quote
Working with Network Rail and Siemens,commuter operator Govia Thameslink Railway has successfully operated its first passenger-carrying train using ATO (Automatic Train Operation) over ETCS (European Train Control System) Level 2.

On March 17 a southbound eight-car Thameslink train to Three Bridges operated automatically through the cross-city core between St Pancras, Farringdon, City Thameslink and London Blackfriars, transitioning into ETCS Level 2 on its approach from Kentish Town and back to conventional signalling between Blackfriars and Elephant & Castle.

GTR is using Grade of Operation 2, with the driver checking the platforms, closing the doors and initiating departure from each station. The Siemens-built Class 700 EMU (Electric Multiple Unit) ran between stops using the ATO and cab signalling, opening the doors automatically at the next station.

‘This is a real “world first” and I’m delighted’, said GTR’s Systems Integration Manager Jim Doughty. ‘It is the culmination of a programme which has been running continuously since the start of the £7bn Thameslink Programme. This cutting-edge system will allow us to run our high-intensity Thameslink service of up to 24 trains/h each way, offering 70% more seats through the centre of London’.

The project partners have run nearly 200 night and day shifts of testing since April 2016 when dynamic proving trials began at Network Rail’s ETCS National Integration Facility at Hertford North. Testing of ATO over ETCS started in November of that year. ETCS Level 2 has been overlaid on the conventional lineside signalling through the Thameslink core, with short blocks allowing trains to operate at closer headways.

GTR has had to demonstrate to regulator ORR» (Office of Rail and Road, formerly Office of Rail Regulation - about) that it has amended its Health & Safety Management System to operate trains in passenger service using both ETCS and ATO. It has also started a comprehensive driver training programme ready for the launch of full ATO working between St Pancras and Blackfriars at 22 trains/h from May 2019 and through to London Bridge from December 2019.

Network Rail’s Project Director for High Capacity Infrastructure, Martin Chatfield, said ‘seeing the first UK (United Kingdom) mainline train running in ATO for passenger services is a truly momentous day for the Thameslink Programme and the wider industry teams involved. This underlines the combined efforts of NR» (Network Rail - home page), the supply chain, and the train operators over the past five years.’
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page