Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 19:55 10 Jan 2025
 
* Three teens arrested over boy's bus station death
* Two million discounted tickets up for grabs in rail sale
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 14/01/25 - Rail Sale starts
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end
24/01/25 - Bristol Rail Campaign AGM 2025

On this day
10th Jan (2017)
Defibrillators discussion pack published by Network Rail (link)

Train RunningCancelled
16:36 London Paddington to Plymouth
17:18 London Paddington to Swansea
17:50 Cardiff Central to London Paddington
19:04 Great Malvern to London Paddington
19:04 Didcot Parkway to London Paddington
19:36 London Paddington to Worcester Shrub Hill
23:03 Salisbury to Portsmouth & Southsea
23:14 London Paddington to Oxford
Short Run
17:03 London Paddington to Penzance
17:59 Cheltenham Spa to London Paddington
18:08 London Paddington to Trowbridge
18:29 Gatwick Airport to Reading
18:38 Barnstaple to Exmouth
18:38 Didcot Parkway to London Paddington
19:04 Paignton to London Paddington
19:17 Exeter Central to Barnstaple
19:31 Okehampton to Exeter Central
19:35 Exeter St Davids to London Paddington
22:50 Salisbury to Portsmouth Harbour
Delayed
15:03 London Paddington to Penzance
18:23 Par to Newquay
18:59 Gatwick Airport to Reading
19:22 Newquay to Par
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 10, 2025, 19:55:36 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[132] Westminster Hall debate : Railway services to South West
[85] Thames Valley infrastructure problems causing disruption elsew...
[81] Ryanair sues 'unruly' passenger over flight diversion
[72] Mick Lynch announces retirement as head of RMT
[53] GWR Advance Purchase sale - January 2025
[34] Birthday trip, Melksham to Penzance - 28th January 2025
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: WCML Power Line brought down 26 May  (Read 2742 times)
teamsaint
Full Member
***
Posts: 56


View Profile Email
« on: June 05, 2017, 20:42:54 »

Hi All

I was on the Caledonian Sleeper to Edinburgh on Friday night,  26 May. We awoke on  the Saturday  morning to find ourselves still at Preston.
We were told that a power line had been brought down by a freight train ahead of us, and that we would need to find another route. We Managed to get to Edinburgh by 14.30 by going Preston-York ( very crowded 2 carriage train, due to York races)  and York Edinburgh, ( horribly overcrowded Virgin train, due to WCML (West Coast Main Line) closure).

Anyway, it turns out that the WCML was closed north of Preston that weekend due to engineering works. I wondered if, rather than the line being " brought down", if in fact there had been some communication failure, and that the sleeper had set off  despite the line  being closed. Maybe just my suspicious mind ?!

We got 100%  compensation , very easy and quick system TBF (To Be Fair), although the service from the Sleeper on the Saturday morning was pretty mediocre really. Just  the standard cup of tea, and a rather slow  offer of the two train option to Edinburgh, or wait and see what time coaches might turn up.

Be interested in your comments.
Thanks.

Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13034


View Profile Email
« Reply #1 on: June 05, 2017, 21:24:43 »

I suspect that the sleeper had a path prior to the closure north of Preston, but missed the slot as soon as the wires came diwn & possession soon taken.

Feel for Cally sleeper. Hardly their fault
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4497


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #2 on: June 05, 2017, 22:30:54 »

One of the FOC (Freight Operating Company) has started to run double headed freights (2 x class 90) the problem is each loco draws 300Amps the OLE (Overhead Line Equipment, more often "OHLE") system is not designed for a 600Amp loading.  I believe NR» (Network Rail - home page) have raised objections to these trains run double headed
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
chrisr_75
Hero Member
*****
Posts: 1019


View Profile
« Reply #3 on: June 06, 2017, 09:59:00 »

One of the FOC (Freight Operating Company) has started to run double headed freights (2 x class 90) the problem is each loco draws 300Amps the OLE (Overhead Line Equipment, more often "OHLE") system is not designed for a 600Amp loading.  I believe NR» (Network Rail - home page) have raised objections to these trains run double headed

Has something changed with the infrastructure in recent years? IIRC (if I recall/remember/read correctly) there were double headed class 87 workings on the northern part of the route from their introduction onwards (certainly 2 x cl.86) and they are very similar to class 90's, with the exception of the control system - their may of course be differences in the current draw.
Logged
John R
Hero Member
*****
Posts: 4416


View Profile
« Reply #4 on: June 06, 2017, 10:05:29 »

One of the FOC (Freight Operating Company) has started to run double headed freights (2 x class 90) the problem is each loco draws 300Amps the OLE (Overhead Line Equipment, more often "OHLE") system is not designed for a 600Amp loading.  I believe NR» (Network Rail - home page) have raised objections to these trains run double headed
That surprises me.  Surely they wouldn't be able to just run them without NR agreeing in advance?
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4497


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #5 on: June 09, 2017, 18:33:06 »

One of the FOC (Freight Operating Company) has started to run double headed freights (2 x class 90) the problem is each loco draws 300Amps the OLE (Overhead Line Equipment, more often "OHLE") system is not designed for a 600Amp loading.  I believe NR» (Network Rail - home page) have raised objections to these trains run double headed

Has something changed with the infrastructure in recent years? IIRC (if I recall/remember/read correctly) there were double headed class 87 workings on the northern part of the route from their introduction onwards (certainly 2 x cl.86) and they are very similar to class 90's, with the exception of the control system - their may of course be differences in the current draw.

87's when double headed limited the power taken between the 2 locos ................. BR (British Rail(ways)) DM&EE know what the system they designed was capable of.


One of the FOC has started to run double headed freights (2 x class 90) the problem is each loco draws 300Amps the OLE system is not designed for a 600Amp loading.  I believe NR have raised objections to these trains run double headed
That surprises me.  Surely they wouldn't be able to just run them without NR agreeing in advance?

Train and route planning do not always go through the asset engineers, especially if the route was already cleared for double headed trains  ................... the planners just don't understand the limitations of the system.

Also there quite a lot of "politics" involved
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page