Nosing through journey planner have noticed engineering works between lostwithiel and st austell on the 14th November.
Most
HSTs▸ appear to be terminating at Bodmin with units going to lostwithiel. However nothing appears to be starting at lostwithiel with everything starting at Bodmin. Does anyone have any details on how trains are going to be turning around as I notice it is not possible to turn around at Bodmin, would trains possibly be running empty to lostwithiel and turning around there?
Louis