Title: Network Rail's branch possession work in Cornwall and Devon Q4 2009 Post by: RailCornwall on October 05, 2009, 15:26:56 Engineers will begin on a ^2m programme of work next week, as part of Network Rail^s annual initiative to improve the branch lines in Devon and Cornwall.
The ongoing investments aim to bring passengers a smoother and more reliable train journeys in the area. Work will first begin on the Newquay branch line, where engineers will be working round the clock on 5 ^ 9 October and 12 ^ 16 October. Some of the major work include renewing more than a mile of track drainage system, replacing 700 yards of rail and strengthening the bridge between Roche and Bugle. Chris Rayner, route director, Network Rail, said: ^This series of work will reduce the risk of infrastructure problems occurring on these branch lines, ultimately making trains more reliable. We have deliberately planned to carry out the improvement work during quieter travelling time to minimise any inconvenience caused to passengers. This work is vital if we are to improve the railway in the long-term.^ Once the work at Newquay is completed, engineers will move on to the following branch lines: 26 October ^ 30 October, Paignton branch line - Major work include strengthening the bridge near Torquay, replacing 308 yards of rail and renewing 150 sleepers. 8 October ^ 14 October, Barnstaple branch line - Major work include relaying 220 yards of track in the Eggsford area, renewing track points at Credition and strengthening the Gunstone bridge. 23 November ^ 27 November, Maritime branch line - Major work include repair track drainage and ballast, renew sleepers and testing signal cables 6 December ^ 11 December, St Ives branch line - Major work include repairing 88 yards of track drainage, renewing 2156 yards of rail and strengthening the railway bridge near Lelant. Alternative services will be provided and details of these services will be available at stations. Passengers are advised to always check journey details with the National Rail Enquiries on 08457 484950 before travelling. (NR Press Release) Title: Re: Network Rail's branch possession work in Cornwall and Devon Q4 2009 Post by: vacman on October 05, 2009, 18:27:40 does this mean the St Ives will be recieveing welded rail? It must be the only line left in England that is entirely bullhead jointy track, oh, apart from about 60ft of track in St Ives platform which is flat bottomed jointed.
Title: Re: Network Rail's branch possession work in Cornwall and Devon Q4 2009 Post by: RailCornwall on November 18, 2009, 15:43:33 Looks as if the major work for Falmouth - Truro seems to be at Falmouth Docks, correct me if that's wrong, considerable clearance works have been done to clear undergrowth on all the disused track. Some bagged ballast has appeared too.
This page is printed from the "Coffee Shop" forum at http://gwr.passenger.chat which is provided by a customer of Great Western Railway. Views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that content provided contravenes our posting rules ( see http://railcustomer.info/1761 ). The forum is hosted by Well House Consultants - http://www.wellho.net |