Great Western Coffee Shop

Journey by Journey => London to Reading => Topic started by: johoare on December 28, 2008, 11:46:40



Title: 28/12/08 - Bad evening train service or problem with NR Journey planner?
Post by: johoare on December 28, 2008, 11:46:40
I am travelling into London today and will be travelling back mid evening.. FGW web site says there is minimal engineering work..

There appears to be a half hourly train going into London, and similar coming out...

...except for when I want to travel home..

there are departures at 18.44, 19.15, 19.44, 20.15.. all take about 40 minutes... As I would have expected today..

And then there is a big gap.. the next train is 20.37 which requires me to go to Reading and then get another train back to Maidenhead, but I assume a travel card from Maidenhead to London will not cover that..so I can't get that train.. and the next train after that is 21.15 which takes a whole hour to get back to maidenhead because of this...

21:24  Ealing Broadway     <====
21:46  Southall                <====
21:52  Hayes & Harlington
21:56  West Drayton
22:01  Langley (Berks)
22:06  Slough
22:10  Burnham (Bucks)

.. a whole 22 minutes to do the usual 5-10 min journey between Ealing Broadway and Slough..

After that it gets back to the half hour timetable of earlier in the evening (21.44, 22.15 etc)..

I just wondered if anyone knew if there was a reason for this? Or if in fact the National rail journey planner is wrong?

Thank you
 :)


Title: Re: 28/12/08 - Bad evening train service or problem with NR Journey planner?
Post by: johoare on December 28, 2008, 21:26:57
OK, so no one knew in advance.. However I got the 20.15 home in the end, to avoid the uncertainty over the timetable.. The 21.44 did run, despite it not being on NR journey planner.. The 21.15 does indeed appear to (NR departures board) take an hour with the supposed 22 minutes between Ealing broadway and Southall.. Looking at arrivals/departures for Southall now, it seems that this train is arriving there at 21.29 and leaving at 21.46...I would love to hear if anyone knows why that train has to sit at Southall for that amount of time?


Title: Re: 28/12/08 - Bad evening train service or problem with NR Journey planner?
Post by: Ollie on December 28, 2008, 22:30:06
It may just be a problem but the 21:15 is timetabled to take 53mins to Maidenhead

Timetable to arrive Maidenhead at 22:08.

Timetable shows it as having to wait at Slough for 14mins.


Title: Re: 28/12/08 - Bad evening train service or problem with NR Journey planner?
Post by: johoare on December 29, 2008, 00:21:28
It may just be a problem but the 21:15 is timetabled to take 53mins to Maidenhead

Timetable to arrive Maidenhead at 22:08.

Timetable shows it as having to wait at Slough for 14mins.

Interesting, that isn't what the arrivals/departures boards were showing..They were showing 17 minute wait at Southall and arriving(or departing?) Maidenhead at 22.15..... Maybe we'll never know.. ;)

Also, if the timetable is right, who wants to sit at Slough (or anywhere else for that matter) for 14 minute when really they would like to get to their destination that much faster...


Title: Re: 28/12/08 - Bad evening train service or problem with NR Journey planner?
Post by: Btline on December 29, 2008, 13:04:34
...who wants to sit at Slough...
;D



This page is printed from the "Coffee Shop" forum at http://gwr.passenger.chat which is provided by a customer of Great Western Railway. Views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that content provided contravenes our posting rules ( see http://railcustomer.info/1761 ). The forum is hosted by Well House Consultants - http://www.wellho.net