Journey by Journey => TransWilts line => Topic started by: grahame on May 17, 2020, 09:08:26



Title: Tender for footbridge at Melksham Station - closing date 29th May
Post by: grahame on May 17, 2020, 09:08:26

(http://www.wellho.net/pix/footbridgetender1900.jpg)

"Great Western Railway"

"The Directors of this Company are prepared to receive TENDERS for the CONSTRUCTION of FOOT-BRIDGES over the Railway near Penygraig and at Melksham and Norton Fitzwarren Stations.

"Plans and Specifications may be seen and Forms of Tender and Bills of Quantities obtained at the Office of the Engineer at this Station between the housrs of 10.0 a.m. and 4.0 p.m.

"Tenders, addressed to the undersignder and marked outside "Tender for Footbridges" will be received on or before Tuesday, the 29th instant.

"The Directors do not bind themselves to accept the lowest or any Tender

G. K. MILLS, Secy.

Paddington Station, London, 11th May 1900. 7177



Or if you want what OCR software gave me ...


Ileum gasi gostsacts.
(RE AT STRUN RAILWAY. 1:414)04ert of this Compass are prepared be receive Trnmas for the (X)NSTRUCTION et LOOT-BRIDC4 ZS over the Railway aerie Penierldf. and at flelks ham and Sow &In Flutters 11 Mations, Plass and Specification may be sten and Forms of Tender .ad Bilis of Quantities etitioned st the Mies of the Baitinear at lists Station l•etween the hours of 100 coi. aril 4.0 "Al. 1 ells4,11%. addressed to thl onelenigned. and marked outside " Trader for Irootbrvigek" will be receives 00 or before Tuesday. the Dili inalass. The Directors (1,) net bind themselves to accept the lowest or say Tel:vier. 0. K. paddlogteits titatian. rioolon. 11th Kit liggi.41431177


Title: Re: Tender for footbridge at Melksham Station - closing date 29th May
Post by: ellendune on May 17, 2020, 10:38:27
Contractors today complain about short turn-around times for tenders!

So in 3 weeks a contractor must get themselves to Paddington to spend time there looking at the drawings and obtain the Bill of Quantities and then put together a tender. If they miss something on the drawings they then have to go back to Paddington to have another look.

Not likely to favour a local contractor. 



This page is printed from the "Coffee Shop" forum at http://gwr.passenger.chat which is provided by a customer of Great Western Railway. Views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that content provided contravenes our posting rules ( see http://railcustomer.info/1761 ). The forum is hosted by Well House Consultants - http://www.wellho.net