Title: New - privately run - LGV to Bordeaux "opened"
Post by: stuving on February 28, 2017, 20:28:04
From The Connexion (https://www.connexionfrance.com/French-news/New-Paris-Bordeaux-train-line-inaugurated-today):
Quote
New Paris-Bordeaux train line inaugurated today

French President Hollande is in Charente to cut the ribbon on new TGV route linking the cities

The days of two-hour train travel from Paris to Bordeaux are fast approaching, as the high-speed train line (LGV) linking the two cities will be inaugurated this afternoon by President François Hollande.

First passengers will not be able to enjoy the 2hr4min journey until July but the formal opening of the LGV SEA (Southern Europe Atlantic) infrastructure is taking place at the logistics base of Villognon, Charente to the north of Angoulême – chosen because it represents the mid-way point of the line.

Started in 2011, construction of the last section of the new high-speed line joining Tours-Bordeaux is almost finished, and only testing and driver training remains to be completed.

Up to 9,000 people worked to build the 340km of this new line that has been in the planning since the mid-1990s. Some 117 communes have been affected, and 415 engineering structures (ouvrages d’art) such as bridges and supporting walls constructed.

The 50-year concession between Tours and Bordeaux (LGV SEA) was awarded to Lisea (High-speed line South Europe Atlantique) after it won a tender process.

It is the first private company in France to manage a high-speed railway infrastructure and this comes after it financed 50% of the cost of the €7.8billion TGV line.

Ticket prices will be announced mid-March and the route will welcome its first passengers on July 2.

That cost figure of €7.8bn might mean almost anything - not to be compared with any other project unless you've looked into what it covers, and why Lisea only funded 50% of it.

Why was it done privately? Well, SNCF already owe a lot (like €41bn) for the existing LGVs, and in the period 2008-2011 finance wasn't easy to arrange. And, of course, this was Sarkozy. The new line Le Mans - Rennes was also built and 1/3 financed privately (by Eiffage), but will be run by SNCF Réseau.

Several commentators have said "it's private, it'll cost more". But Lisea say they are charging less per km than SNCF Réseau do on their LGVs:
peak           off-peak
Paris-Lyon:30.922.3
Paris-Bordeaux - TGV Atlantique:27.320.1
Paris-Bordeaux - TGV Duplex:29.221.4
Paris-Bordeaux - double TGV Duplex :37.026.5




This page is printed from the "Coffee Shop" forum at http://gwr.passenger.chat which is provided by a customer of Great Western Railway. Views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that content provided contravenes our posting rules ( see http://railcustomer.info/1761 ). The forum is hosted by Well House Consultants - http://www.wellho.net