Just recieved some information, about Crossrail works in and around Maidenhead, from Sunday 26th May 2013 :). Modified to 26/05/13 as the 29th May is a Wednesday. Sorry for the confusion. It looks as if the main works will be on track realignment and the possible start of the crossrail stabling sidings. If other people know what else is going to happen around Maidenhead Station please post a message as im interested in this.
Also I wonder if the electricification masts will start to appear in due course


Title: Re: Possible Start on Construction around Maidenhead Area from Sunday 29th May
Post by: paul7575 on May 20, 2013, 02:16:46
It is stabling sidings on the up side west of the station, and fairly minor alterations to the layout to allow Crossrail trains to run through the station and return towards London without conflicting with other services.

Not actually a 'depot' as such.

PS - added a snip from a sketch of Crossrail layout from ORR's website.  Red sections are alterations to be used primarily by Crossrail, blue is alterations to be used by non-Crossrail services.

Paul


Title: Re: Possible Start on Construction around Maidenhead Area from Sunday 29th May
Post by: BerkshireBugsy on May 20, 2013, 07:19:58
Just heard on local radio there are overrunning works in that area- i wonder if these are the ones they were talking about on Dross FM this morning?



Title: Re: Possible Start on Construction around Maidenhead Area from Sunday 29th May
Post by: eightf48544 on May 20, 2013, 10:30:52
Oh dear why waste the money buiding the turnback sidings.

Rough timescales
Reading finished 2016
Electric TV services 2017
First Crossrail train out of the tunnel at Royal Oak 2019

So why waste money on Turnback sidings at Maidenhead when Reading will be ready to receive Crossrail trains 2 years ealier than required?

Total Waste of MY money!!


Title: Re: Possible Start on Construction around Maidenhead Area from Sunday 29th May
Post by: stuving on May 20, 2013, 10:38:00
Was there in fact ever an announced decision on this question as posed in the London & South East RUS?

I know it was not in the HLOS, but as it was proposed on the basis it would save money, it might not need to be.

The relevant page on NR's website is years out of date, and my attempts to ask them why and what were frustrated by the lack of any address to send e-mails about the site to...


Title: Re: Possible Start on Construction around Maidenhead Area from Sunday 29th May
Post by: Electric train on May 20, 2013, 18:39:34
PS - added a snip from a sketch of Crossrail layout from ORR's website.  Red sections are alterations to be used primarily by Crossrail, blue is alterations to be used by non-Crossrail services.

Paul

Paul not sure that plan of Maidenhead is quite right it shows 6 through platforms at Maidenhead, I believe that the existing plat 5 is going to be made into 2 bays one for Marlow the other Crossrail

Oh dear why waste the money buiding the turnback sidings.

Rough timescales
Reading finished 2016
Electric TV services 2017
First Crossrail train out of the tunnel at Royal Oak 2019

So why waste money on Turnback sidings at Maidenhead when Reading will be ready to receive Crossrail trains 2 years ealier than required?

Total Waste of MY money!!

At this stage the plan to terminate Crossrail at Maidenhead are not altered by the change of traction for the TV services read for 165/6's 319's

My personal guess is the change to run Crossrail through to Reading will be in the order of 2021 to 2023 to coincide with the western cord into Heathrow


Title: Re: Possible Start on Construction around Maidenhead Area from Sunday 29th May
Post by: James on May 20, 2013, 19:32:31
Wow thats a positive response :).
Thankyou Paul that makes sense to build stabling yard and turnback tracks instead of a depot.
What I should say is that, maybe people know this, however its understandable why the turnback and stabling yard are beening constructed at Maidenhead.
My guessing is that when/if crossrail gets extended to Reading it would be sensable to extend 2 tph during peak periods to Reading with the other 2 tph terminating at Maidenhead. During off peak period the service would continue to Reading. This will help out with capacity at Reading Station, particularly platforms 13 and 14 which may also be used by crosscountry and possible gatwick services. Also if trains need to divide say to Henley or Bourne End coming from Paddington, there would be space available on the new platform 4 (loop).
Platforms 3 and new through platform 5 would be the down and up tracks. Of course a branch bay platform 6 would also be useful. Plus if any additional crossrail services are provided in years to come, both maidenhead and reading turnback facilities will be hopefully welcomed. As ever any comments you may have, please pm me. :)


Title: Re: Possible Start on Construction around Maidenhead Area from Sunday 29th May
Post by: Electric train on May 20, 2013, 21:32:29
This link shows the proposed layout at Maidenhead a little better http://www.crossrail.co.uk/assets/library/document/m/original/maidenhead_station.pdf (http://www.crossrail.co.uk/assets/library/document/m/original/maidenhead_station.pdf)


Title: Re: Possible Start on Construction around Maidenhead Area from Sunday 29th May
Post by: johoare on May 20, 2013, 22:03:11
Hope that isn't the case then.. The "worksite is the whole front car park, Silco Drive plus part of Shoppenhangers car park.. Hopefully is that was going to happen it would be communicated slightly further in advance... Although I guess that won't all be this weekend I do wonder whether Silco drive will be there much long.. After all it appears Apcoa have given up on checking tickets in it all this year  :)


Title: Re: Possible Start on Construction around Maidenhead Area from Sunday 29th May
Post by: johoare on May 20, 2013, 22:06:25
Hope that isn't the case then.. The "worksite is the whole front car park, Silco Drive plus part of Shoppenhangers car park.. Hopefully if that was going to happen it would be communicated slightly further in advance... Although I guess that won't all be this weekend I do wonder whether Silco drive will be there much longer.. After all it appears Apcoa have given up on checking tickets in it all this year  :)


Title: Re: Possible Start on Construction around Maidenhead Area from Sunday 26th May! :)
Post by: NickB on May 21, 2013, 08:40:30
That plan shows the proposed works that I'm expecting (ie. a disaster)

My understanding, and as confirmed by Crossrail, is that:

- Silco will go completely
- Shoppenhangers will lose the lower section
- the forecourt will be closed
- Taxi rank will be reduced and moved
- the bus stop on Shoppenhangers will be moved as the road is narrowed
- all Drog & Go/Kiss & Ride will be removed

I'm contemplating home working for the next 3 years.....


Title: Re: Possible Start on Construction around Maidenhead Area from Sunday 26th May! :)
Post by: eightf48544 on May 21, 2013, 08:59:40
Looking at the plan it appears there isn't a direct connection from the branch to the Relief lines. So no through trains even if the branch is electrified.

Also note how they've designated the Relief lines Crossrail! A four track railway should be a four track railway not split 2 for GWML and 2 Crossrail.


Title: Re: Possible Start on Construction around Maidenhead Area from Sunday 26th May! :)
Post by: Southern Stag on May 21, 2013, 10:26:14
It will still be a four track railway, the relief lines may be called Crossrail but they certainly aren't going to just be used by Crossrail.


Title: Re: Possible Start on Construction around Maidenhead Area from Sunday 26th May! :)
Post by: Electric train on May 21, 2013, 18:19:01
Looking at the plan it appears there isn't a direct connection from the branch to the Relief lines. So no through trains even if the branch is electrified.

Also note how they've designated the Relief lines Crossrail! A four track railway should be a four track railway not split 2 for GWML and 2 Crossrail.


Under the Crossrail regime there are no through Bourne End - Paddington's.  Not sure what the morning and evening peaks will be 2 or 3 car


Title: Re: Possible Start on Construction around Maidenhead Area from Sunday 26th May! :)
Post by: Network SouthEast on May 21, 2013, 19:56:06
Under the Crossrail regime there are no through Bourne End - Paddington's.  Not sure what the morning and evening peaks will be 2 or 3 car
What makes you come to that conclusion?

Crossrail's own website (http://www.crossrail.co.uk/route/surface/western-section/#.UZvB9rXEp4w) assumes that there will be 1tph in the peaks through from Bourne End to Paddington and 1pth in the peaks through from Henley on Thames to Paddington.

The branches will be electrified (except Greenford), so the days of the Turbos serving them will be over in a few years time.


Title: Re: Possible Start on Construction around Maidenhead Area from Sunday 26th May! :)
Post by: stuving on May 21, 2013, 20:18:20
Under the Crossrail regime there are no through Bourne End - Paddington's.  Not sure what the morning and evening peaks will be 2 or 3 car
What makes you come to that conclusion?

Crossrail's own website (http://www.crossrail.co.uk/route/surface/western-section/#.UZvB9rXEp4w) assumes that there will be 1tph in the peaks through from Bourne End to Paddington and 1pth in the peaks through from Henley on Thames to Paddington.

The branches will be electrified (except Greenford), so the days of the Turbos serving them will be over in a few years time.
This is in Crossrail's list of "other operators'" services, and reflects the "residual GW" service. As such it is the same as now, in the narrow sense that 1 tph during a 2-hour peak and only in the peak direction is 2 a day each way.

It was the proposal in the London & South East RUS, to replace this residual service by Crossrail extended to Reading, that led to the suggestion of suppressing these through services.


Title: Re: Possible Start on Construction around Maidenhead Area from Sunday 26th May! :)
Post by: paul7575 on May 21, 2013, 20:23:29
Looking at the plan it appears there isn't a direct connection from the branch to the Relief lines. So no through trains even if the branch is electrified.

That isn't correct though?  The key suggests to me the green lines are the lines Crossrail will use; but they are not the only lines.

Paul


Title: Re: Possible Start on Construction around Maidenhead Area from Sunday 29th May
Post by: johoare on May 21, 2013, 23:47:45
Hope that isn't the case then.. The "worksite is the whole front car park, Silco Drive plus part of Shoppenhangers car park.. Hopefully if that was going to happen it would be communicated slightly further in advance... Although I guess that won't all be this weekend I do wonder whether Silco drive will be there much longer.. After all it appears Apcoa have given up on checking tickets in it all this year  :)

Apologies for my double post here (I was just trying to modify my original post and didn't do it very well).. I won't remove either now as it no one seems to have noticed (well other than Chris From Nailsea  ::) ::))


Title: Re: Possible Start on Construction around Maidenhead Area from Sunday 26th May! :)
Post by: Chris from Nailsea on May 22, 2013, 00:08:43
Cough ... Chris from Nailsea was merely offering some assistance with correcting any 'errors or omissions' in such an inadvertent muddle of posting - as indeed I would to anyone who might be similarly embarrassed ...  ::)


Title: Re: Possible Start on Construction around Maidenhead Area from Sunday 26th May! :)
Post by: johoare on May 22, 2013, 00:14:33
Well yes... I thought I'd merely leave my ineptitude for others to learn from and to also realise that Chris is better (much much better than I) at noticing these things



This page is printed from the "Coffee Shop" forum at http://gwr.passenger.chat which is provided by a customer of Great Western Railway. Views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that content provided contravenes our posting rules ( see http://railcustomer.info/1761 ). The forum is hosted by Well House Consultants - http://www.wellho.net