Title: Rail electrification disruption in St Brides Wentlooge Post by: Chris from Nailsea on November 09, 2012, 12:22:43 From the BBC (http://www.bbc.co.uk/news/uk-wales-20253630):
Quote Disruption in south Wales caused by work to bridges ahead of major work electrifying the railway line has begun with a 10-mile road diversion. Network Rail says bridges will need to be raised for electrical cables from London to Swansea and the valleys. A diversion lasting six months has begun at St Brides Wentlooge, Newport. The company says it hopes to keep disruption to a minimum, but a local pub says lack of passing trade means it could close in weeks. Network Rail said bridges along the rail route would need to be modified, with its project management team still surveying which ones would be affected. A spokesman said bridges would either be raised or the railway line dropped, although this was not the preferred option because of the risk of flooding. The company, which is responsible for the UK's railway network, said it aimed to have as little diversion of traffic and other disruption as possible. But residents and businesses in St Brides Wentlooge are concerned that the work in their village is scheduled to last for half a year. Sue Jones, landlady at the Inn at the Elm Tree, said business was "zilch" since the bridge closed on Monday. "We get a lot of passing trade as we are a hotel and restaurant, as well as a pub," she said. "But we aren't getting that now as the bridge was the main route from Newport. Who's going to drive an extra 10 miles to the pub? The way it's going we'll be lucky to still be open at Christmas. It's scary." The Pheasants bridge, which carries the B4239 Lighthouse Road over the railway, means a journey from St Brides Wentlooge to Duffryn in Newport is usually two miles. The bridge closure means traffic has to travel through nearby Marshfield and along the A48 dual carriageway to Duffryn and on to Newport city centre. Cathy Turner, clerk of the local community council, said: "It's not very good at all and I know businesses are worried. We understand the work needs to be done but surely it can be done quicker than six months. We are worried that another bridge in Marshfield will be the next to be closed and that will cause more problems," she added. Network Rail said the work in the area was essential and the diversion route was the only option available. "To minimise the potential disruption faced by the local community, Network Rail is paying for an additional bus to supplement the bus service between Newport and St Brides," a spokesperson added. "This additional bus service should allow residents to continue receiving the service they are used to throughout the road closure." Network Rail is also meeting the costs of the work on the bridges, rather than local councils. The Department of Transport announced earlier this year that the Great Western rail line between London and Swansea will be electrified, along with commuter lines in the south Wales valleys. Extending the electrification of the main rail line will cut some 20 minutes from the three-hour journey between Paddington and Swansea. It also means newer, longer trains will be able to run on the line, powered by overhead cables. Title: Re: Rail electrification disruption in St Brides Wentlooge Post by: Trowres on November 09, 2012, 23:28:33 ??? Six months for one bridge?
Title: Re: Rail electrification disruption in St Brides Wentlooge Post by: Thatcham Crossing on November 10, 2012, 10:35:29 It took pretty much that long for the ones recently rebuilt (to get the wires under) at Aldermaston and Sulhampstead on the Berks & Hants between Reading and Newbury.
Title: Re: Rail electrification disruption in St Brides Wentlooge Post by: paul7575 on November 10, 2012, 10:46:55 ??? Six months for one bridge? Often the bridge carries the main utilities for the area, once you add removal and replacement of phone, gas, electric and water services to the equation the job escalates. If it was a bridge only they'd probably be significantly quicker. That was what took the vast majority of the time for the bridges in Winchester they lifted (for W10 clearance) a couple of years ago. It took quite a few months of utility excavation in the roads, and then utility diversions before they even started the bridge removal. Another factor that adds significantly to the time is if the level of roads either side has to be altered to match a changed bridge deck height if necessary. Paul Title: Re: Rail electrification disruption in St Brides Wentlooge Post by: anthony215 on November 10, 2012, 14:22:53 There are a few low bridges west of Cardiff especiall near Pyle station one of which carries the A48 and is very busy with traffic.
I look forward to seeing what is planned for the arches just before Llansamlet station. Title: Re: Rail electrification disruption in St Brides Wentlooge Post by: TonyK on November 10, 2012, 14:39:40 I am surprised the powers that be are still surveying, and thought there would a central record of heights, services carried, etc. I hope this doesn't impact on the schedule for electrification.
This page is printed from the "Coffee Shop" forum at http://gwr.passenger.chat which is provided by a customer of Great Western Railway. Views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that content provided contravenes our posting rules ( see http://railcustomer.info/1761 ). The forum is hosted by Well House Consultants - http://www.wellho.net |