Title: JourneyCheck ... reasons given Post by: grahame on July 22, 2012, 13:33:55 This is due to passengers transferring between trains earlier was a new one on me.
Quote 13:51 Paignton to Exmouth due 15:18 This train will be started from Newton Abbot at 14:08. This train will no longer call at Paignton, Torquay and Torre. This is due to passengers transferring between trains earlier. Also today: This is due to a member of train crew being unavailable. This is due to a train fault. This is due to train crew having been unavailable earlier. Is there a full list anywhere, and explanations? Title: Re: JourneyCheck ... reasons given Post by: JayMac on July 22, 2012, 13:52:45 I don't know if the further information provided to FGW staff makes the reason for cancellation at Paignton, Torquay and Torre any clearer:
Quote Alteration to the 2F12 22/07/12 13:51 Paignton to Exmouth due 15:18. This train will be started from Newton Abbot at 14:08. This train will no longer call at Paignton, Torquay and Torre. This is due to passengers transferring between trains earlier. Show More Information: Due to earlier delay on 1A81 08:35 Penzance to Paddington due to disabled assist at Liskeard. Title: Re: JourneyCheck ... reasons given Post by: readytostart on July 22, 2012, 14:32:37 From what I can see, the delay on 1A81 had caused a reactionary delay on a service running from Exmouth to Paignton, which hadn't been recovered by the time the set had been to Paignton and back to Exmouth. 2T16 (1229 EXM PGN) was therefore terminated at NTA to make a right time departure for 2F12.
Title: Re: JourneyCheck ... reasons given Post by: Southern Stag on July 22, 2012, 16:44:51 Passengers transferring between trains covers both set swaps, so if the train working one service is swapped with another train and all the passengers have to swap trains, and delays in passengers boarding/alighting, such as disabled passengers.
Title: Re: JourneyCheck ... reasons given Post by: phile on July 22, 2012, 16:55:13 I should imagine that the reason for delay goes back to the root cause even if the train quoted was not directly affected itself but merely a reactionary reason.
Title: Re: JourneyCheck ... reasons given Post by: grahame on July 22, 2012, 16:59:43 Passengers transferring between trains covers both set swaps, so if the train working one service is swapped with another train and all the passengers have to swap trains, and delays in passengers boarding/alighting, such as disabled passengers. Ah - right. Thanks. Sounds like the interesting case at Westbury last summer when the incoming train from Weymouth was dividing for Bath / Bristol (should have been front portion) and Swindon (should have been rear 153). Problem ... a 153 wasn't enough to take all the passengers (and, yes there was an adult wheelchair and LOTS of babes in wheelchairs!). Actually the swap worked well as most people on the train had been alerted, and I suspect that both portions were right-time by destination. Title: Re: JourneyCheck ... reasons given Post by: grahame on July 24, 2012, 07:37:45 This is due to a member of train crew being unavailable.
This is due to a train fault. This is due to train crew having been unavailable earlier. This is due to passengers transferring between trains earlier. This is due to a line-side fire. This is due to animals on the line. This is due to an earlier train fault. This is due to animals on the line earlier. This is due to an obstruction on the line. This is due to an earlier problem at a level crossing. This is due to congestion caused by earlier delays. This is due to a problem with line-side equipment. This is due to a train late from the depot. Above are just from last day or so (since I started this thread). Actually a rather better selection / better explained than I had anticipated finding from taking the occasional look; as "one-liner"s they've probably got it about right. I do find myself wondering if - at times - having the information technology to hand to tell us this lot makes things look like there are a lot more problems these days when that's not the case ... in my earlier life commuter days, I simply travelled on my home line not knowing of any disruption on neighbouring services. The list also gives a peephole into the wide range of issues that have to be dealt with on a daily basis ... Title: Re: JourneyCheck ... reasons given Post by: bobm on July 24, 2012, 08:02:11 A couple of other fairly regulars
This is due to a passenger being taken ill This is due to disruptive passengers Title: Re: JourneyCheck ... reasons given Post by: BerkshireBugsy on July 24, 2012, 08:38:56 When I checked JourneyCheck for my Monday service, it reported "This train does not stop here" but the CIS displays reported "Cancelled" which was in fact the case. To me, although "This train does not stop here" may be factually correcty :) it isn't as meaningful as "Cancelled" :)
Title: Re: JourneyCheck ... reasons given Post by: IanL on July 24, 2012, 09:56:50 This is due to unusual passenger flow
Title: Re: JourneyCheck ... reasons given Post by: Chris from Nailsea on July 26, 2012, 22:52:49 ... and, all too often these days, "This is due to a person hit by a train." :(
Title: Re: JourneyCheck ... reasons given Post by: 6 OF 2 redundant adjunct of unimatrix 01 on July 27, 2012, 00:59:48 Due to a member of train crew being unavailable.... Driver locked in toilet
Title: Re: JourneyCheck ... reasons given Post by: BerkshireBugsy on July 27, 2012, 05:08:16 Due to a member of train crew being unavailable.... Driver locked in toilet Or as in the case of the 1712 Reading to Newbury last night ..This train is delayed due to the lack of train crew who is on the delayed train out of Paddington (which was probably delayed due to the late incoming service)..I think you get the picture :) Title: Re: JourneyCheck ... reasons given Post by: grahame on July 27, 2012, 07:37:16 Well ... since I started this thread I've noted:
This is due to a broken down train. This is due to a delay on a previous journey. This is due to a line-side fire. This is due to a member of train crew being unavailable. This is due to a passenger being taken ill. This is due to a problem currently under investigation. This is due to a problem with line-side equipment. This is due to a security alert. This is due to a train fault. This is due to a train late from the depot. This is due to an earlier problem at a level crossing. This is due to an earlier problem with line-side equipment. This is due to an earlier security alert. This is due to an earlier train fault. This is due to an obstruction on the line. This is due to an unusually large passenger flow. This is due to animals on the line earlier. This is due to animals on the line. This is due to congestion caused by earlier delays. This is due to disruptive passengers. This is due to earlier emergency engineering works. This is due to earlier signalling problems. This is due to over-running engineering works. This is due to passengers transferring between trains earlier. This is due to safety checks having been made earlier. This is due to signalling problems. This is due to speed restrictions. This is due to train crew having been unavailable earlier. This is due to unusual passenger flow. This is due to waiting earlier for a train crew member. This is due to waiting for a train crew member. Which seems to be a far better / wider range that I had aniticipated ;D. Noting the number that say "earlier" in them, knock-on effect is a clear issue that (?) makes the number of significant delays and changes later in the day far higher than earlier in the day (?). In another thread, we were discussing FGW tweet hours and wondering if they should be slid an hour earlier. I'm thinking "probably not" ... if the passenger levels are similar, Jo and Ollie are likely to be far more useful in the evening reporting and helping on after effects that first thing in the morning when the morning specials are usually limited to a few "train late from depot" and "overrunning engineering" issues. Title: Re: JourneyCheck ... reasons given Post by: phile on July 27, 2012, 20:16:34 Last night the 19 30 Cardiff to Portsmouth Hbr started at Newport due, it was quoted as "train late from Depot". A bit difficult to absorb at 19 30 at night when the unit comes off Fratton Depot at 06xx in the morning.
Title: Re: JourneyCheck ... reasons given Post by: Louis94 on July 27, 2012, 23:53:16 Last night the 19 30 Cardiff to Portsmouth Hbr started at Newport due, it was quoted as "train late from Depot". A bit difficult to absorb at 19 30 at night when the unit comes off Fratton Depot at 06xx in the morning. Could very easily of been a set swap at Bristol Temple Meads, or another train late from the depot, which delayed it. Title: Re: JourneyCheck ... reasons given Post by: bobm on August 01, 2012, 11:08:50 Can also add "due to a vehicle striking a bridge"
Title: Re: JourneyCheck ... reasons given Post by: JayMac on August 01, 2012, 21:35:53 Lots of unusually large passengers flowing ( ;)) about this evening on the Bristol-Cardiff corridor, due to Olympic^ football at the Millennium Stadium. So much so that FGW arranged ticket acceptance on First Buses between Bristol-Filton AW-Bristol Parkway to move passengers onto South Wales HSTs and off grossly overcrowded local DMUs. Particularly badly affected were Taunton-Cardiff services. I know because I attempted to board one at Temple Meads bound for Patchway. Gave up on that idea and took the bus alternative instead.
Title: Re: JourneyCheck ... reasons given Post by: bobm on November 29, 2012, 21:14:33 Guess we can add
"due to flooding" and "due to a landslip" to the list now..... Title: Re: JourneyCheck ... reasons given Post by: JayMac on November 29, 2012, 21:45:47 Well, I heard both 'landslip' and 'flooding' used in a pre-recorded announcements at Bristol TM the other day.
Title: Re: JourneyCheck ... reasons given Post by: thetrout on December 01, 2012, 05:11:39 Years ago this one. But: Pullman Restaurant Service will start from Reading. This is due to a fault with lineside equipment earlier. ;D
Turned out some of the Food and the Chef were on a late running Paddington Bound Train ;D Title: Re: JourneyCheck ... reasons given Post by: grahame on December 16, 2012, 15:53:00 15:08 Portsmouth to Cardiff running via Eastleigh:
"This is due to lightning having damaged equipment." Title: Re: JourneyCheck ... reasons given Post by: devon_metro on December 16, 2012, 17:37:36 Not surprised, certainly a fair amount of lighting in Southampton a few hours ago.
Title: Re: JourneyCheck ... reasons given Post by: inspector_blakey on December 16, 2012, 18:57:24 Indeed - lightning strike earlier on affected Eastleigh panel and caused a few signal/points issues, resolved fairly quickly.
Title: Re: JourneyCheck ... reasons given Post by: Kim on February 10, 2013, 08:26:50 "This is due to emergency services dealing with an earlier incident." That probably means person hit by a train, but as was mentioned above, it's been far too frequent of late and constant use of "person hit by a train" looks bad on them.
Also "debris on the line" and "trespasser on the line" / "due to an earlier trespass incident." Title: Re: JourneyCheck ... reasons given Post by: grahame on March 22, 2013, 11:34:54 "Due to the heavy rain it has been reported that a house near the railway is unstable."
-- this morning, Liskeard to Looe Title: Re: JourneyCheck ... reasons given Post by: John R on March 22, 2013, 12:16:37 The house has collapsed and an elderly occupant is reported missing.
Title: Re: JourneyCheck ... reasons given Post by: grahame on March 22, 2013, 13:04:54 The house has collapsed and an elderly occupant is reported missing. http://www.bbc.co.uk/news/uk-england-21892436 "In her 60s" says the BBC - oh help - is that "elderly" ... Title: Re: JourneyCheck ... reasons given Post by: bobm on March 23, 2013, 09:15:12 Quote 10:57 Reading to Newbury Racecourse due 11:16 This train will be cancelled. This is due to poor weather conditions. ...well yes - but the weather has caused the race meeting to be abandoned, therefore removing the need for the train! Title: Re: JourneyCheck ... reasons given Post by: grahame on March 23, 2013, 09:23:19 Quote 10:57 Reading to Newbury Racecourse due 11:16 This train will be cancelled. This is due to poor weather conditions. ...well yes - but the weather has caused the race meeting to be abandoned, therefore removing the need for the train! I don't think "This is indirectly due to poor weather conditions" is in the standard list ;D Title: Re: JourneyCheck ... reasons given Post by: Chris from Nailsea on March 24, 2013, 23:42:27 The house has collapsed and an elderly occupant is reported missing. http://www.bbc.co.uk/news/uk-england-21892436"In her 60s" says the BBC - oh help - is that "elderly" ... From the BBC (http://www.bbc.co.uk/news/uk-england-21892436): Quote Cornwall house collapse: Body found A body has been found at the site of a house which collapsed in a landslip in Cornwall, police have confirmed. Rescue teams have been searching for a woman believed to be trapped inside the property in Looe. The building, which is converted into flats, collapsed just before 06:00 GMT following torrential rain. Devon and Cornwall Police earlier said Susan Norman, who lives in one of the flats in Sandplace Road, Looe, had been unaccounted for. Cornwall Fire and Rescue Service said a body had been recovered from the property at about 18:00, although formal identification had not yet taken place. Dave King, from the service, said sniffer dogs and thermal-imaging equipment had been used. Firefighters had entered the building after it was made "structurally sound" at about 13:15 to continue the search. Devon and Cornwall Police said Ms Norman, aged in her 60s, who lived in one of three single-occupancy flats, had not been seen since 18:00 on Thursday. Her neighbours have been accounted for. Cornwall Council said it was continuing to work with the emergency services and the Health and Safety Executive to carry out a thorough investigation into the cause of the landslip. About 15 people from six other properties have been evacuated while engineers assess the stability of the buildings and the ground. The A387 and B3253 were closed because of the house collapse and rail services to and from Looe were suspended. Some of Ms Norman's neighbours said they had been shocked by the landslip but had previously raised concerns about subsidence in the area. Peter Temlett said: "The drains have been blocked for years - they've not cleared them." The council would not respond to the comments but said its wet weather operation had moved into the "recovery phase", with the Met Office saying the worst of the weather was moving away from Cornwall. My highlighting: Chris from Nailsea. Title: Re: JourneyCheck ... reasons given Post by: bobm on March 25, 2013, 08:36:12 We quite often see delays "due to a passenger being taken ill". Unfortunately someone onboard an early morning Arriva Trains Wales service from Cardiff to Milton Haven was initially taken ill and then died today at Port Talbot Parkway. No more details but thoughts with the deceased's family and the crew and fellow passengers on the service.
Title: Re: JourneyCheck ... reasons given Post by: rogerpatenall on March 25, 2013, 09:26:06 A long, long time ago. . . they had blackboards. The top half was printed 'We are sorry that trains are running late due to' . . . and underneath, on the blackboard half, was written 'delay'. Took a photo, but can't find it .
Title: Re: JourneyCheck ... reasons given Post by: IanL on March 26, 2013, 10:39:19 Last night, 1701 HST Oxford to London Paddington sat at P1 until 1725ish with 'delayed' on the CIS. Only announcement (automated) was "this train is delayed due to a problem that is being investigated"
Title: Re: JourneyCheck ... reasons given Post by: TonyK on March 27, 2013, 21:23:22 We quite often see delays "due to a passenger being taken ill". Unfortunately someone onboard an early morning Arriva Trains Wales service from Cardiff to Milton Haven was initially taken ill and then died today at Port Talbot Parkway. No more details but thoughts with the deceased's family and the crew and fellow passengers on the service. Happened to a former friend and colleague, many years ago. When he didn't get home on time, this being before the internet, his wife rang Temple Meads to ask if there was a delay. She was told yes, because someone had died. As she hung up, she saw two BTP officers walking up the path... I'm sure similar would not happen today. Title: Re: JourneyCheck ... reasons given Post by: grahame on July 28, 2013, 10:26:10 I don't think I've seen this one before.
Quote 08:00 London Paddington to Penzance due 14:16 This train will be started from Plymouth. This train will no longer call at London Paddington, Reading, Didcot Parkway, Swindon, Chippenham, Bath Spa, Bristol Temple Meads, Taunton, Tiverton Parkway, Exeter St Davids, Dawlish, Teignmouth, Newton Abbot and Totnes. This is due to a derailed train. Not a good morning for London passengers to the far west: Quote 08:57 London Paddington to Penzance due 14:33 This train will be terminated at Twyford. This train will call additionally at Twyford. This train will no longer call at Reading, Newbury, Westbury, Taunton, Tiverton Parkway, Exeter St Davids, Newton Abbot, Totnes, Plymouth, Liskeard, Bodmin Parkway, Par, St Austell, Truro, Redruth, Camborne, St Erth and Penzance. This is due to a train fault. Title: Re: JourneyCheck ... reasons given Post by: bobm on July 28, 2013, 10:36:03 Not so good for Swindon passengers, some of whom were sent to Reading to catch the second train after the cancellation of the first .....
Title: Re: JourneyCheck ... reasons given Post by: TonyK on July 28, 2013, 11:23:29 Not a good day, with a derailed train, a broken down train, and a trespass incident all causing current problems. Last night, we had signalling problems at Wokingham, and flooding at Temple Meads. All four reasons in one day. (Well, five actually).
Where is the derailed train? Title: Re: JourneyCheck ... reasons given Post by: bobm on July 28, 2013, 11:35:27 According to staff I spoke to it was part of one power car inside Old Oak Common. Other trains trapped behind it too.
Title: Re: JourneyCheck ... reasons given Post by: grahame on February 17, 2014, 16:20:00 Quote 15:14 Swindon to Westbury due 16:10 This train will be terminated at Chippenham. This train will no longer call at Melksham, Trowbridge and Westbury. This is due to a train fault. Quote 16:15 Westbury to Swindon due 17:03 This train will be cancelled. This is due to a train fault. Journey check says "Train Fault". Rumour suggests "Broken Windscreen Wiper". Is that sufficient to cause a couple of trains to be cancelled? (Hope they fix it for the 17:36 off Swindon, which is running 'nearly every seat taken' already!) Title: Re: JourneyCheck ... reasons given Post by: SDS on February 17, 2014, 16:32:50 Quote 15:14 Swindon to Westbury due 16:10 This train will be terminated at Chippenham. This train will no longer call at Melksham, Trowbridge and Westbury. This is due to a train fault. Quote 16:15 Westbury to Swindon due 17:03 This train will be cancelled. This is due to a train fault. Journey check says "Train Fault". Rumour suggests "Broken Windscreen Wiper". Is that sufficient to cause a couple of trains to be cancelled? (Hope they fix it for the 17:36 off Swindon, which is running 'nearly every seat taken' already!) Internal Information: Windscreen wiper fault on 153325. Title: Re: JourneyCheck ... reasons given Post by: grahame on February 17, 2014, 17:40:39 Internal Information: Windscreen wiper fault on 153325. (Hope they fix it for the 17:36 off Swindon, which is running 'nearly every seat taken' already!) Nope .... Quote 17:36 Swindon to Westbury due 18:21 This train will be cancelled. This is due to a train fault. Title: Re: JourneyCheck ... reasons given Post by: bobm on July 29, 2015, 08:35:23 I am wondering if there has been a software upgrade for Journeycheck as some of the reasons have been slightly changed and made a bit more customer friendly.
Quote This is due to a fault with the signalling system. Quote This is due to a broken down train earlier today. Quote This is due to a passenger being taken ill on a train. Quote This train will be cancelled. This is due to a fault on this train. Quote This is due to the train departing late to maintain customer connections. Title: Re: JourneyCheck ... reasons given Post by: TonyK on August 01, 2015, 20:49:19 Quote This is due to the train departing late to maintain customer connections. I didn't know that happened these days. Title: Re: JourneyCheck ... reasons given Post by: bobm on August 01, 2015, 20:54:35 Quite often on FGW the last train of the night on a branch line will be held if the main line service is running late (within reason).
There are other places where it happens. The Swindon to Gloucester/Cheltenham trains will usually be held at Swindon during the day if the services from London are no more than 8-10 minutes late. Title: Re: JourneyCheck ... reasons given Post by: phile on August 03, 2015, 16:22:54 Electrification has come sooner than expected. FGW Journey Check shows 15 12 Bristol Parkway to Weston super Mare has been delayed by 10 mins at Bedminster due to OHLE problems. Suspect this could be the root cause and it has been delayed by a XC which has travelled from the wires.
Title: Re: JourneyCheck ... reasons given Post by: grahame on August 11, 2015, 09:51:01 Couple more I've not seen before (I don't think). Perhaps there's a free type option now?
Quote This is due to engineering works not being finished on time. This is due to a fault on this train which is now fixed. Title: Re: JourneyCheck ... reasons given Post by: TaplowGreen on August 11, 2015, 10:22:28 Couple more I've not seen before (I don't think). Perhaps there's a free type option now? Quote This is due to engineering works not being finished on time. This is due to a fault on this train which is now fixed. .....always nice to have a happy ending though? ;) Title: Re: JourneyCheck ... reasons given Post by: phile on August 25, 2015, 10:10:51 Just wondering if anybody has any opinions on the new lay out of Journey Check.
Title: Re: JourneyCheck ... reasons given Post by: Fourbee on August 25, 2015, 11:44:33 Just wondering if anybody has any opinions on the new lay out of Journey Check. That got me a bit worried that some tinkering may have taken place; it made me realise that I only use this version which hasn't changed: http://pda.journeycheck.com/firstgreatwestern People may already know about this, but in addition, I find www.traintimes.org.uk beats the National Rail site hands down for finding times/live running info. It is also customisable from the URL e.g. last train from Reading to Basingstoke tomorrow: www.traintimes.org.uk/rdg/bsk/last/tomorrow Live departure board showing only trains from Reading to Paddington: www.traintimes.org.uk/live/rdg/pad Title: Re: JourneyCheck ... reasons given Post by: phile on August 25, 2015, 12:02:36 I access it by clicking on "Current Train Running" at the head of the Home Page and find that is what has changed.
Title: Re: JourneyCheck ... reasons given Post by: grahame on August 25, 2015, 14:57:48 Just wondering if anybody has any opinions on the new lay out of Journey Check. That got me a bit worried that some tinkering may have taken place; it made me realise that I only use this version which hasn't changed: http://pda.journeycheck.com/firstgreatwestern You have highlighted the issue with our data feed ... and may have helped me find a solution Title: Re: JourneyCheck ... reasons given Post by: tomL on August 25, 2015, 21:46:49 Something funky happening with Journeycheck tonight...
Quote This train has been delayed by up to 1480 minutes, is being further delayed at Newport (South Wales) and is expected to be 1480 minutes late. This train will be diverted between Swindon and Newport (South Wales). This train will no longer call at Bristol Parkway. This is due to a fault with the signalling system. ~24 hours late ;D Title: Re: JourneyCheck ... reasons given Post by: grahame on August 26, 2015, 09:35:11 Quote 09:38 Reading to Basingstoke due 10:03 This train will no longer call at Reading West, Mortimer and Bramley Hants. This is due to a speed restriction. Minimum speed?? Title: Re: JourneyCheck ... reasons given Post by: Adelante_CCT on August 26, 2015, 10:08:39 It appears this unit has been running behind schedule since 07:30 so this was done to get it back on schedule as it has tight turnaround times all throughout the day, looks as if there was a problem in the Reading West area since first thing this morning that was the initial cause
Title: Re: JourneyCheck ... reasons given Post by: grahame on December 02, 2015, 23:45:19 http://www.express.co.uk/comment/beachcomber/623799/98-years-old-and-STILL-as-punctual-as-ever-train-ticket-inspector-train-delays
Quote Cows on the line at Ely A piece I greatly enjoyed - do follow the link; I won't quote more and spoil your enjoyment Title: Re: JourneyCheck ... reasons given Post by: grahame on December 27, 2015, 22:56:38 Quote 19:08 Portsmouth Harbour to Cardiff Central due 22:49 This train is being delayed between Bath Spa and Bristol Temple Meads and is now expected to be 33 minutes late. This is due to a supermarket trolley on the track. Title: Re: JourneyCheck ... reasons given Post by: grahame on December 29, 2015, 08:26:20 Quote 06:58 Cheltenham Spa to Swindon due 09:04 Will be formed of 2 coaches instead of 3. This is due to a shortage of trains because of extra safety inspections. There's a couple of trains that are a carriage down this morning (different diagrams) and the 07:49 (at Melksham) TransWilts turned up with 2 carriages rather than one ... something being checked on all 153 units? P.S. +9, -0 @MKM -> 35 ... 35/9 ... but NOT a typical morning. Currently in Coach B of the 08:17 Chippenham to Bath and Bristol - just over a dozen people in the carriage when I would normally expect it to be pretty busy. Title: Re: JourneyCheck ... reasons given Post by: Adelante_CCT on December 29, 2015, 14:13:01 Quote 13:07 Taunton to Cardiff Central due 15:24 This train will no longer call at Worle, Yatton and Nailsea & Backwell. This is due to passengers causing a disturbance on this train. Whats BNM been up to this time? ::) Title: Re: JourneyCheck ... reasons given Post by: Chris from Nailsea on December 29, 2015, 18:18:18 Hmmm. ::)
I have it on the very best of authority that my colleague bobm travelled through Nailsea & Backwell twice today (I assume in opposite directions). ::) Title: Re: JourneyCheck ... reasons given Post by: tomL on January 17, 2016, 21:34:04 Looks like they need a new one. A pleasant surprise for some I'm sure.. ;D
Quote 18:37 London Paddington to Port Talbot Parkway due 21:35 This train will be diverted from Port Talbot Parkway. This train will call additionally at Neath and Swansea. This is due to a fault with the signalling system earlier today. Further Information Engineering works between Port Talbot Parkway and Swansea has finished early. GWR services will now be extended to Swansea calling additionally at Neath and Swansea. Title: Re: JourneyCheck ... reasons given Post by: TonyK on January 17, 2016, 23:34:34 Rare good news indeed! Just the grammar to be referred to the Pedants' thread.
Title: Re: JourneyCheck ... reasons given Post by: PhilWakely on February 06, 2016, 20:06:17 Here is one 'just in'..............
Quote 16:56 Plymouth to London Paddington due 21:00 This train is being delayed between Taunton and Westbury and is now expected to be 86 minutes late. This train will be diverted between Taunton and Westbury. This train will no longer call at Castle Cary. This is due to an object being caught on the overhead electric wires. Title: Re: JourneyCheck ... reasons given Post by: Chris from Nailsea on February 06, 2016, 20:09:23 A low-flying pig? ;D
Title: Re: JourneyCheck ... reasons given Post by: PhilWakely on February 06, 2016, 20:17:34 To be fair, the following service is also being delayed, but this time the rather more plausible
"This is due to a tree blocking the railway." whilst a service in the reverse direction.... Quote 18:00 London Paddington to Plymouth due 21:18 This train will be started from Reading. This train will no longer call at London Paddington. This is due to an object being caught on the overhead electric wires. So, tbf, probably nowt more than a manual keying error, but amusing notheless :) Title: Re: JourneyCheck ... reasons given Post by: plymothian on February 07, 2016, 10:38:21 There really was tarpaulin/plastic sheet that had blown on to the OHLE, when that was cleared a tree came down near Castle Cary that was too big for the driver to move.
As the incidents happened within a short space of time, the attributer probably got the cause mixed up. Title: Re: JourneyCheck ... reasons given Post by: grahame on February 29, 2016, 10:56:48 Further to a comment elsewhere - indeed refreshing to see extra information.
Quote 09:00 Cardiff Central to Plymouth due 12:42 This train has been delayed at Bristol Temple Meads and is now 43 minutes late. This train will call additionally at Bedminster, Parson Street, Weston Milton and Tiverton Loop. This is due to a broken down train earlier today. Alas, I'm guessing that Tiverton Loop is to allow a faster train to pass and not for passenger purposes :-\ Personally, I find the extra data very informative and regret the disappearance of things like "Last report - Thingley Junction" on Webtis screens. Yes, I do understand that 3 out of 5 don't know where Thingley is. Title: Re: JourneyCheck ... reasons given Post by: Lee on February 29, 2016, 12:15:05 Tiverton Loop does have (long disused) platforms alongside - It's the former Tiverton Junction station.
(http://www.cornwallrailwaysociety.org.uk/uploads/7/6/8/3/7683812/885589_orig.jpg) (http://www.cornwallrailwaysociety.org.uk/uploads/7/6/8/3/7683812/7441179_orig.jpg) (Edited to include archive photos of Tiverton Junction station.) Title: Re: JourneyCheck ... reasons given Post by: PhilWakely on February 29, 2016, 15:44:48 Quote 09:00 Cardiff Central to Plymouth due 12:42 This train has been delayed at Bristol Temple Meads and is now 43 minutes late. This train will call additionally at Bedminster, Parson Street, Weston Milton and Tiverton Loop. This is due to a broken down train earlier today. Alas, I'm guessing that Tiverton Loop is to allow a faster train to pass and not for passenger purposes :-\ In the end, the Tiverton Loop stop was not used and the 09:00 Cardiff Central to Plymouth ran 2 minutes ahead of a (also late running) XC HST which itself was just 2 minutes ahead of a late running GWR HST. Title: Re: JourneyCheck ... reasons given Post by: JayMac on February 29, 2016, 16:39:51 In the end, the Tiverton Loop stop was not used and the 09:00 Cardiff Central to Plymouth ran 2 minutes ahead of a (also late running) XC HST which itself was just 2 minutes ahead of a late running GWR HST. I'm surprised that the Class 2 Cardiff-Plymouth wasn't held at Taunton, Tiverton Loop or Exeter to allow the XC HST to pass. Maybe the 1006 from PAD could have been let through too. However, that may have put the 0900 GWR Cardiff-Plymouth into a 1 hour plus delay. Meaning compensation for passengers. Perhaps GWR colluded with Network Rail to keep it ahead of the Class 1s and below the 1 hour threshold... Cynical? Moi? :P Title: Re: JourneyCheck ... reasons given Post by: IndustryInsider on February 29, 2016, 16:52:01 Perhaps GWR colluded with Network Rail to keep it ahead of the Class 1s and below the 1 hour threshold... I honestly don't think they're anywhere near organised enough to think about that! Title: Re: JourneyCheck ... reasons given Post by: phile on February 29, 2016, 19:57:22 GWR tonight refers to 19 10 Taunton to Nailsea and Backwell and then goes on to say calling additonally at subsequent stations.
Title: Re: JourneyCheck ... reasons given Post by: PhilWakely on June 23, 2016, 19:29:13 I am intrigued by this one today..........
Quote 15:06 London Paddington to Penzance due 20:42 This train will call additionally at Newbury. This is due to this train not stopping at a station it was supposed to. Title: Re: JourneyCheck ... reasons given Post by: Ollie on June 23, 2016, 19:55:26 One of the additional Castle Cary services didn't call (attributed as a diagram error).
Title: Re: JourneyCheck ... reasons given Post by: LiskeardRich on June 23, 2016, 19:56:37 I am intrigued by this one today.......... Quote 15:06 London Paddington to Penzance due 20:42 This train will call additionally at Newbury. This is due to this train not stopping at a station it was supposed to. It specifically says this train not stopping. Reading or Paddington missed ;D I believe it was a previous service forgetting to stop. Ollie beat me to it Title: Re: JourneyCheck ... reasons given Post by: TaplowGreen on June 23, 2016, 21:43:09 One of the additional Castle Cary services didn't call (attributed as a diagram error). .......It probably flew straight through on a cloud of canabis smoke! Title: Re: JourneyCheck ... reasons given Post by: TonyK on June 23, 2016, 22:51:32 .......It probably flew straight through on a cloud of canabis smoke! Just too far out, man. (Cannabis, BTW, giving you an alibi if Mr Plod chooses to rummage through your dustbin. An avenue of pleasure long closed off to me, having not smoked even tobacco since Sunday 12 May 1991.) Title: Re: JourneyCheck ... reasons given Post by: bobm on August 12, 2016, 12:00:43 Quote Disruption has been reported between Teignmouth and Exeter St Davids. The 10:46 will have 2 instead of 3 coaches due to overcrowding as this train has fewer coaches than normal. ??? Title: Re: JourneyCheck ... reasons given Post by: PhilWakely on August 24, 2016, 08:36:33 Good to see that such precise predictions can be made hours into the future as well..........
Quote 21:29 Taunton to London Paddington due 00:34 This train will be starting late from Taunton and is expected to be 1 minute late. This is due to congestion. Last Updated:24/08/2016 03:14 Title: Re: JourneyCheck ... reasons given Post by: bobm on August 24, 2016, 08:38:37 I think this is to recover from a planning error. If you look on Real Time Trains the service is missing. I guess the only way to show it was by introducing some form of alteration, in this case a late start - and the minimum delay you can have is 1 minute. It is also missing for tomorrow night.
Title: Re: JourneyCheck ... reasons given Post by: grahame on February 11, 2017, 06:49:39 I think this is to recover from a planning error. If you look on Real Time Trains the service is missing. I guess the only way to show it was by introducing some form of alteration, in this case a late start - and the minimum delay you can have is 1 minute. It is also missing for tomorrow night. Very late to follow up ... but this has a similarity to recent events at Salisbury where 153 units are restricted to even numbered platforms at present and the head code of the train needs changing. The old service (with a 150 or 158) shown as cancelled, and the 153 service with new data shown as running a minute later. Title: Re: JourneyCheck ... reasons given Post by: grahame on February 11, 2017, 06:57:43 National Rail codes - the full list with code numbers at http://nrodwiki.rockshore.net/index.php/Darwin:Cancellation_reason_codes_and_text
Or in short form, "This train has been cancelled because of ..." a bicycle on the track a bicycle on the track earlier on this train's journey a bicycle on the track earlier today a boat colliding with a bridge a boat colliding with a bridge earlier today a bridge being damaged a bridge being damaged by a boat a bridge being damaged by a road vehicle a bridge having collapsed a broken down train a broken down train a broken down train earlier today a broken rail a broken windscreen on the train a burst water main flooding the railway a burst water main flooding the railway earlier today a burst water main near the railway a burst water main near the railway earlier today a burst water main near the railway yesterday a bus colliding with a bridge a bus colliding with a bridge earlier on this train's journey a bus colliding with a bridge earlier today a chemical spillage near the railway a chemical spillage near the railway earlier today a chemical spillage near the railway yesterday a coach becoming uncoupled on a train a coach becoming uncoupled on a train earlier in its journey a coach becoming uncoupled on a train earlier today a coach becoming uncoupled on this train a coach becoming uncoupled on this train earlier in its journey a coach becoming uncoupled on this train earlier today a collision at a level crossing a collision at a level crossing earlier today a collision at a level crossing yesterday a collision between trains a collision with the buffers at a station a delay on a previous journey a derailed train a derailed train a derailment within the depot a fault occurring when attaching a part of a train a fault occurring when attaching a part of this train a fault occurring when detaching a part of a train a fault occurring when detaching a part of this train a fault on a train in front of this one a fault on this train a fault on this train which is now fixed a fault with a swing bridge over a river a fault with a swing bridge over a river earlier today a fault with barriers at a level crossing a fault with barriers at a level crossing earlier today a fault with barriers at a level crossing yesterday a fault with the electric third rail a fault with the electric third rail earlier on this train's journey a fault with the electric third rail earlier today a fault with the on train signalling system a fault with the on train signalling system earlier on this train's journey a fault with the on train signalling system earlier today a fault with the radio system between the driver and the signaller a fault with the radio system between the driver and the signaller earlier on this train's journey a fault with the radio system between the driver and the signaller earlier today a fault with the signalling system a fault with the signalling system earlier on this train's journey a fault with the signalling system earlier today a fire at a station a fire at a station a fire at a station earlier a fire at a station earlier today a fire near the railway involving gas cylinders a fire near the railway involving gas cylinders earlier today a fire near the railway involving gas cylinders yesterday a fire near the railway suspected to involve gas cylinders a fire near the railway suspected to involve gas cylinders earlier today a fire near the railway suspected to involve gas cylinders yesterday a fire next to the track a fire next to the track earlier today a fire on a train a fire on a train earlier today a fire on property near the railway a fire on property near the railway earlier today a fire on property near the railway yesterday a gas leak near the railway a gas leak near the railway earlier today a gas leak near the railway yesterday a landslip a landslip a late departure while the train was cleaned specially a late running freight train a late running train being in front of this one a line-side fire a lorry colliding with a bridge a lorry colliding with a bridge earlier on this train's journey a lorry colliding with a bridge earlier today a low speed derailment a member of on train staff being taken ill a member of train crew being unavailable a passenger being taken ill a passenger being taken ill at a station a passenger being taken ill at a station earlier today a passenger being taken ill on a train a passenger being taken ill on a train earlier today a passenger being taken ill on this train a passenger being taken ill on this train earlier in its journey a passenger having been taken ill earlier a person being hit by a train a person being hit by a train earlier today a person hit by a train a person hit by a train earlier a points failure a power cut at the station a problem at a level crossing a problem currently under investigation a problem currently under investigation a problem near the railway a problem with a river bridge a problem with a river bridge a problem with a river bridge earlier today a problem with line side equipment a problem with line-side equipment a problem with the station lighting a rail buckling in the heat a railway embankment being damaged a river flooding the railway a river flooding the railway earlier today a road accident at a level crossing a road accident at a level crossing earlier today a road accident at a level crossing yesterday a road accident near the railway a road accident near the railway earlier today a road accident near the railway yesterday a road vehicle blocking the railway a road vehicle blocking the railway earlier on this train's journey a road vehicle blocking the railway earlier today a road vehicle colliding with a bridge a road vehicle colliding with a bridge earlier on this train's journey a road vehicle colliding with a bridge earlier today a road vehicle colliding with level crossing barriers a road vehicle colliding with level crossing barriers earlier today a road vehicle colliding with level crossing barriers yesterday a road vehicle damaging track at a level crossing a road vehicle damaging track at a level crossing earlier today a road vehicle damaging track at a level crossing yesterday a safety inspection of the track a safety inspection of the track earlier today a safety inspection on a train a safety inspection on a train earlier today a safety inspection on this train a safety inspection on this train earlier in its journey a security alert a security alert at a station a security alert earlier today a security alert on another train a security alert on this train a shortage of on train staff a shortage of station staff a shortage of train conductors a shortage of train crew a shortage of train drivers a shortage of train guards a shortage of train managers a shortage of trains because of accident damage a shortage of trains because of extra safety inspections a shortage of trains because of vandalism a shortage of trains following damage by snow and ice a speed restriction a speed restriction because of fog a speed restriction because of fog earlier on this train's journey a speed restriction because of fog earlier today a speed restriction because of heavy rain a speed restriction because of heavy rain earlier on this train's journey a speed restriction because of heavy rain earlier today a speed restriction because of high track temperatures a speed restriction because of high track temperatures earlier on this train's journey a speed restriction because of high track temperatures earlier today a speed restriction because of high winds a speed restriction because of high winds earlier on this train's journey a speed restriction because of high winds earlier today a speed restriction because of severe weather a speed restriction because of severe weather earlier on this train's journey a speed restriction because of severe weather earlier today a speed restriction because of snow and ice a speed restriction because of snow and ice earlier on this train's journey a speed restriction because of snow and ice earlier today a speed restriction earlier on this train's journey a speed restriction earlier today a speed restriction in a tunnel a speed restriction in a tunnel earlier on this train's journey a speed restriction in a tunnel earlier today a speed restriction over a bridge a speed restriction over a bridge earlier on this train's journey a speed restriction over a bridge earlier today a speed restriction over an embankment a speed restriction over an embankment earlier on this train's journey a speed restriction over an embankment earlier today a speed restriction over defective track a speed restriction over defective track earlier on this train's journey a speed restriction over defective track earlier today a supermarket trolley on the track a supermarket trolley on the track earlier on this train's journey a supermarket trolley on the track earlier today a train being involved in an accident a train derailed earlier a train derailment earlier today a train derailment yesterday a train fault a train hitting an obstruction on the line a train hitting an obstruction on the line earlier on this train's journey a train hitting an obstruction on the line earlier today a train late from the depot a train late from the depot earlier a train not stopping at a station it was supposed to a train not stopping at a station it was supposed to earlier in its journey a train not stopping at a station it was supposed to earlier today a train not stopping in the correct position at a station a train not stopping in the correct position at a station earlier in its journey a train not stopping in the correct position at a station earlier today a train's automatic braking system being activated a train's automatic braking system being activated earlier in its journey a train's automatic braking system being activated earlier today a tree blocking the railway a tree blocking the railway earlier on this train's journey a tree blocking the railway earlier today a trespass incident a tunnel being closed for safety reasons a vehicle striking a bridge a vehicle striking a bridge earlier a wartime bomb near the railway a wartime bomb near the railway earlier today a wartime bomb near the railway yesterday a wartime bomb which has now been made safe ambulance service dealing with an incident ambulance service dealing with an incident near the railway ambulance service dealing with an incident near the railway earlier today ambulance service dealing with an incident near the railway yesterday an earlier broken down train an earlier landslip an earlier landslip an earlier line-side fire an earlier operating incident an earlier problem at a level crossing an earlier problem near the railway an earlier problem with a river bridge an earlier problem with line side equipment an earlier problem with line-side equipment an earlier security alert an earlier train fault an earlier trespass incident an incident at the airport an object being caught on the overhead electric wires an object being caught on the overhead electric wires earlier on this train's journey an object being caught on the overhead electric wires earlier today an obstruction on the line an obstruction on the line earlier an obstruction on the track an obstruction on the track earlier on this train's journey an obstruction on the track earlier today an operating incident an operational incident an operational incident earlier in its journey an operational incident earlier today an unusually large passenger flow an unusually large passenger flow earlier animals on the line animals on the line earlier animals on the railway animals on the railway earlier today attempted theft of overhead line electrification equipment attempted theft of overhead line electrification equipment earlier today attempted theft of overhead line electrification equipment yesterday attempted theft of railway equipment attempted theft of railway equipment earlier today attempted theft of railway equipment yesterday attempted theft of signalling cables attempted theft of signalling cables earlier today attempted theft of signalling cables yesterday attempted theft of third rail electrification equipment attempted theft of third rail electrification equipment earlier today attempted theft of third rail electrification equipment yesterday cattle on the railway cattle on the railway earlier today checking reports of an obstruction on the line checking reports of an obstruction on the line earlier on this train's journey checking reports of an obstruction on the line earlier today congestion congestion caused by earlier delays damage to the electric third rail damage to the electric third rail earlier on this train's journey damage to the electric third rail earlier today damage to the overhead electric wires damage to the overhead electric wires earlier on this train's journey damage to the overhead electric wires earlier today disruptive passengers disruptive passengers earlier earlier electrical supply problems earlier emergency engineering works earlier engineering works not being finished on time earlier industrial action earlier over-running engineering works earlier overhead wire problems earlier signalling problems earlier vandalism electrical supply problems emergency engineering works emergency services dealing with a prior incident emergency services dealing with an incident emergency services dealing with an incident near the railway emergency services dealing with an incident near the railway earlier today emergency services dealing with an incident near the railway yesterday engineering works engineering works not being finished on time expected industrial action expected industrial action earlier today expected industrial action yesterday failure of the electricity supply failure of the electricity supply earlier on this train's journey failure of the electricity supply earlier today fire alarms sounding at a station fire alarms sounding earlier at a station fire brigade dealing with an incident fire brigade dealing with an incident near the railway fire brigade dealing with an incident near the railway earlier today fire brigade dealing with an incident near the railway yesterday flood water making the railway potentially unsafe flood water making the railway potentially unsafe earlier today flooding flooding flooding earlier flooding earlier in this train's journey flooding earlier today fog fog earlier forecasted heavy snow forecasted high winds forecasted severe weather forecasted slippery rails heavy rain flooding the railway heavy rain flooding the railway earlier today heavy snow heavy snow earlier in this train's journey heavy snow earlier today heavy snow over recent days high winds high winds high winds earlier high winds earlier in this train's journey high winds earlier today horses on the railway horses on the railway earlier today ice preventing this train getting electricity from the third rail ice preventing trains getting electricity from the third rail industrial action industrial action industrial action earlier today industrial action yesterday lightning damaging a station lightning damaging a train lightning damaging equipment lightning damaging the electricity supply lightning damaging the signalling system lightning damaging this train lightning having damaged equipment more trains than usual needing repairs at the same time over-running engineering works overcrowding overcrowding as this train has fewer coaches than normal overcrowding because an earlier train had fewer coaches than normal overcrowding because of a concert overcrowding because of a football match overcrowding because of a marathon overcrowding because of a rugby match overcrowding because of a sporting event overcrowding because of an earlier cancellation overcrowding because of an event overcrowding earlier on this train's journey overhead wire problems passengers causing a disturbance earlier in this train's journey passengers causing a disturbance on a train passengers causing a disturbance on a train earlier today passengers causing a disturbance on this train passengers transferring between trains passengers transferring between trains earlier police dealing with an incident police dealing with an incident near the railway police dealing with an incident near the railway earlier today police dealing with an incident near the railway yesterday poor rail conditions poor rail conditions earlier poor weather conditions poor weather conditions earlier predicted flooding predicted flooding earlier today safety checks being made safety checks having been made earlier severe weather severe weather earlier severe weather earlier in this train's journey severe weather earlier today severe weather preventing train crew getting to work sheep on the railway sheep on the railway earlier today signalling problems signalling staff being taken ill signalling staff being taken ill earlier on this train's journey signalling staff being taken ill earlier today slippery rails slippery rails earlier in this train's journey slippery rails earlier today snow snow earlier speed restrictions having been imposed the communication alarm being activated on a train the communication alarm being activated on this train the electricity being switched off for safety reasons the electricity being switched off for safety reasons earlier on this train's journey the electricity being switched off for safety reasons earlier today the emergency services dealing with an incident the emergency services dealing with an incident earlier today the fire alarm sounding at a station the fire alarm sounding at a station earlier today the fire alarm sounding in a signalbox the fire alarm sounding in a signalbox earlier on this train's journey the fire alarm sounding in a signalbox earlier today the fire alarm sounding in the signalling centre the fire alarm sounding in the signalling centre earlier on this train's journey the fire alarm sounding in the signalling centre earlier today the sea flooding the railway the sea flooding the railway earlier today the train conductor being taken ill the train departing late to maintain customer connections the train driver being taken ill the train for this service having broken down the train guard being taken ill the train making extra stops because a train was cancelled the train making extra stops because of service disruption the train manager being taken ill theft of overhead line electrification equipment theft of overhead line electrification equipment earlier today theft of overhead line electrification equipment yesterday theft of railway equipment theft of railway equipment earlier today theft of railway equipment yesterday theft of signalling cables theft of signalling cables earlier today theft of signalling cables yesterday theft of third rail electrification equipment theft of third rail electrification equipment earlier today theft of third rail electrification equipment yesterday thick fog thick fog earlier in this train's journey thick fog earlier today this train being late from the depot this train breaking down this train hitting an obstruction on the line this train hitting an obstruction on the line earlier in its journey this train hitting an obstruction on the line earlier on this train's journey this train hitting an obstruction on the line earlier today this train not stopping at a station it was supposed to this train not stopping at a station it was supposed to earlier in its journey this train not stopping at a station it was supposed to earlier today this train not stopping in the correct position at a station this train not stopping in the correct position at a station earlier in its journey this train not stopping in the correct position at a station earlier today this train's automatic braking system being activated this train's automatic braking system being activated earlier in its journey this train's automatic braking system being activated earlier today train crew being delayed train crew being delayed by service disruption train crew having been unavailable earlier trains being involved in an accident trespassers on the railway trespassers on the railway earlier in this train's journey trespassers on the railway earlier today urgent repairs to a bridge urgent repairs to a bridge earlier today urgent repairs to a tunnel urgent repairs to a tunnel earlier today urgent repairs to the railway urgent repairs to the railway earlier today urgent repairs to the track urgent repairs to the track earlier today vandalism vandalism at a station vandalism at a station earlier today vandalism at a station yesterday vandalism of railway equipment vandalism of railway equipment earlier today vandalism of railway equipment yesterday vandalism on a train vandalism on a train earlier today vandalism on a train yesterday vandalism on this train vandalism on this train earlier today vandalism on this train yesterday waiting earlier for a train crew member waiting for a part of the train to be attached waiting for a train crew member Title: Re: JourneyCheck ... reasons given Post by: TaplowGreen on February 11, 2017, 08:08:13 Quiet day in the office Graham? :)
Title: Re: JourneyCheck ... reasons given Post by: grahame on February 11, 2017, 08:54:50 Quiet day in the office Graham? :) Far from it ... couple of minutes scripting to scrape and sort the data. Title: Re: JourneyCheck ... reasons given Post by: bobm on February 11, 2017, 08:56:19 I am waiting for someone to quote the whole list and then add a one sentence reply!
(No seriously, please don't!) ;D Title: Re: JourneyCheck ... reasons given Post by: Adelante_CCT on February 11, 2017, 10:05:34 I am waiting for someone to quote the whole list and then add a one sentence reply! (No seriously, please don't!) ;D Do you mean something like this? Quote a bicycle on the track a bicycle on the track earlier on this train's journey a bicycle on the track earlier today a boat colliding with a bridge a boat colliding with a bridge earlier today a bridge being damaged a bridge being damaged by a boat a bridge being damaged by a road vehicle a bridge having collapsed a broken down train a broken down train a broken down train earlier today a broken rail a broken windscreen on the train a burst water main flooding the railway a burst water main flooding the railway earlier today a burst water main near the railway a burst water main near the railway earlier today a burst water main near the railway yesterday a bus colliding with a bridge a bus colliding with a bridge earlier on this train's journey a bus colliding with a bridge earlier today a chemical spillage near the railway a chemical spillage near the railway earlier today a chemical spillage near the railway yesterday a coach becoming uncoupled on a train a coach becoming uncoupled on a train earlier in its journey a coach becoming uncoupled on a train earlier today a coach becoming uncoupled on this train a coach becoming uncoupled on this train earlier in its journey a coach becoming uncoupled on this train earlier today a collision at a level crossing a collision at a level crossing earlier today a collision at a level crossing yesterday a collision between trains a collision with the buffers at a station a delay on a previous journey a derailed train a derailed train a derailment within the depot a fault occurring when attaching a part of a train a fault occurring when attaching a part of this train a fault occurring when detaching a part of a train a fault occurring when detaching a part of this train a fault on a train in front of this one a fault on this train a fault on this train which is now fixed a fault with a swing bridge over a river a fault with a swing bridge over a river earlier today a fault with barriers at a level crossing a fault with barriers at a level crossing earlier today a fault with barriers at a level crossing yesterday a fault with the electric third rail a fault with the electric third rail earlier on this train's journey a fault with the electric third rail earlier today a fault with the on train signalling system a fault with the on train signalling system earlier on this train's journey a fault with the on train signalling system earlier today a fault with the radio system between the driver and the signaller a fault with the radio system between the driver and the signaller earlier on this train's journey a fault with the radio system between the driver and the signaller earlier today a fault with the signalling system a fault with the signalling system earlier on this train's journey a fault with the signalling system earlier today a fire at a station a fire at a station a fire at a station earlier a fire at a station earlier today a fire near the railway involving gas cylinders a fire near the railway involving gas cylinders earlier today a fire near the railway involving gas cylinders yesterday a fire near the railway suspected to involve gas cylinders a fire near the railway suspected to involve gas cylinders earlier today a fire near the railway suspected to involve gas cylinders yesterday a fire next to the track a fire next to the track earlier today a fire on a train a fire on a train earlier today a fire on property near the railway a fire on property near the railway earlier today a fire on property near the railway yesterday a gas leak near the railway a gas leak near the railway earlier today a gas leak near the railway yesterday a landslip a landslip a late departure while the train was cleaned specially a late running freight train a late running train being in front of this one a line-side fire a lorry colliding with a bridge a lorry colliding with a bridge earlier on this train's journey a lorry colliding with a bridge earlier today a low speed derailment a member of on train staff being taken ill a member of train crew being unavailable a passenger being taken ill a passenger being taken ill at a station a passenger being taken ill at a station earlier today a passenger being taken ill on a train a passenger being taken ill on a train earlier today a passenger being taken ill on this train a passenger being taken ill on this train earlier in its journey a passenger having been taken ill earlier a person being hit by a train a person being hit by a train earlier today a person hit by a train a person hit by a train earlier a points failure a power cut at the station a problem at a level crossing a problem currently under investigation a problem currently under investigation a problem near the railway a problem with a river bridge a problem with a river bridge a problem with a river bridge earlier today a problem with line side equipment a problem with line-side equipment a problem with the station lighting a rail buckling in the heat a railway embankment being damaged a river flooding the railway a river flooding the railway earlier today a road accident at a level crossing a road accident at a level crossing earlier today a road accident at a level crossing yesterday a road accident near the railway a road accident near the railway earlier today a road accident near the railway yesterday a road vehicle blocking the railway a road vehicle blocking the railway earlier on this train's journey a road vehicle blocking the railway earlier today a road vehicle colliding with a bridge a road vehicle colliding with a bridge earlier on this train's journey a road vehicle colliding with a bridge earlier today a road vehicle colliding with level crossing barriers a road vehicle colliding with level crossing barriers earlier today a road vehicle colliding with level crossing barriers yesterday a road vehicle damaging track at a level crossing a road vehicle damaging track at a level crossing earlier today a road vehicle damaging track at a level crossing yesterday a safety inspection of the track a safety inspection of the track earlier today a safety inspection on a train a safety inspection on a train earlier today a safety inspection on this train a safety inspection on this train earlier in its journey a security alert a security alert at a station a security alert earlier today a security alert on another train a security alert on this train a shortage of on train staff a shortage of station staff a shortage of train conductors a shortage of train crew a shortage of train drivers a shortage of train guards a shortage of train managers a shortage of trains because of accident damage a shortage of trains because of extra safety inspections a shortage of trains because of vandalism a shortage of trains following damage by snow and ice a speed restriction a speed restriction because of fog a speed restriction because of fog earlier on this train's journey a speed restriction because of fog earlier today a speed restriction because of heavy rain a speed restriction because of heavy rain earlier on this train's journey a speed restriction because of heavy rain earlier today a speed restriction because of high track temperatures a speed restriction because of high track temperatures earlier on this train's journey a speed restriction because of high track temperatures earlier today a speed restriction because of high winds a speed restriction because of high winds earlier on this train's journey a speed restriction because of high winds earlier today a speed restriction because of severe weather a speed restriction because of severe weather earlier on this train's journey a speed restriction because of severe weather earlier today a speed restriction because of snow and ice a speed restriction because of snow and ice earlier on this train's journey a speed restriction because of snow and ice earlier today a speed restriction earlier on this train's journey a speed restriction earlier today a speed restriction in a tunnel a speed restriction in a tunnel earlier on this train's journey a speed restriction in a tunnel earlier today a speed restriction over a bridge a speed restriction over a bridge earlier on this train's journey a speed restriction over a bridge earlier today a speed restriction over an embankment a speed restriction over an embankment earlier on this train's journey a speed restriction over an embankment earlier today a speed restriction over defective track a speed restriction over defective track earlier on this train's journey a speed restriction over defective track earlier today a supermarket trolley on the track a supermarket trolley on the track earlier on this train's journey a supermarket trolley on the track earlier today a train being involved in an accident a train derailed earlier a train derailment earlier today a train derailment yesterday a train fault a train hitting an obstruction on the line a train hitting an obstruction on the line earlier on this train's journey a train hitting an obstruction on the line earlier today a train late from the depot a train late from the depot earlier a train not stopping at a station it was supposed to a train not stopping at a station it was supposed to earlier in its journey a train not stopping at a station it was supposed to earlier today a train not stopping in the correct position at a station a train not stopping in the correct position at a station earlier in its journey a train not stopping in the correct position at a station earlier today a train's automatic braking system being activated a train's automatic braking system being activated earlier in its journey a train's automatic braking system being activated earlier today a tree blocking the railway a tree blocking the railway earlier on this train's journey a tree blocking the railway earlier today a trespass incident a tunnel being closed for safety reasons a vehicle striking a bridge a vehicle striking a bridge earlier a wartime bomb near the railway a wartime bomb near the railway earlier today a wartime bomb near the railway yesterday a wartime bomb which has now been made safe ambulance service dealing with an incident ambulance service dealing with an incident near the railway ambulance service dealing with an incident near the railway earlier today ambulance service dealing with an incident near the railway yesterday an earlier broken down train an earlier landslip an earlier landslip an earlier line-side fire an earlier operating incident an earlier problem at a level crossing an earlier problem near the railway an earlier problem with a river bridge an earlier problem with line side equipment an earlier problem with line-side equipment an earlier security alert an earlier train fault an earlier trespass incident an incident at the airport an object being caught on the overhead electric wires an object being caught on the overhead electric wires earlier on this train's journey an object being caught on the overhead electric wires earlier today an obstruction on the line an obstruction on the line earlier an obstruction on the track an obstruction on the track earlier on this train's journey an obstruction on the track earlier today an operating incident an operational incident an operational incident earlier in its journey an operational incident earlier today an unusually large passenger flow an unusually large passenger flow earlier animals on the line animals on the line earlier animals on the railway animals on the railway earlier today attempted theft of overhead line electrification equipment attempted theft of overhead line electrification equipment earlier today attempted theft of overhead line electrification equipment yesterday attempted theft of railway equipment attempted theft of railway equipment earlier today attempted theft of railway equipment yesterday attempted theft of signalling cables attempted theft of signalling cables earlier today attempted theft of signalling cables yesterday attempted theft of third rail electrification equipment attempted theft of third rail electrification equipment earlier today attempted theft of third rail electrification equipment yesterday cattle on the railway cattle on the railway earlier today checking reports of an obstruction on the line checking reports of an obstruction on the line earlier on this train's journey checking reports of an obstruction on the line earlier today congestion congestion caused by earlier delays damage to the electric third rail damage to the electric third rail earlier on this train's journey damage to the electric third rail earlier today damage to the overhead electric wires damage to the overhead electric wires earlier on this train's journey damage to the overhead electric wires earlier today disruptive passengers disruptive passengers earlier earlier electrical supply problems earlier emergency engineering works earlier engineering works not being finished on time earlier industrial action earlier over-running engineering works earlier overhead wire problems earlier signalling problems earlier vandalism electrical supply problems emergency engineering works emergency services dealing with a prior incident emergency services dealing with an incident emergency services dealing with an incident near the railway emergency services dealing with an incident near the railway earlier today emergency services dealing with an incident near the railway yesterday engineering works engineering works not being finished on time expected industrial action expected industrial action earlier today expected industrial action yesterday failure of the electricity supply failure of the electricity supply earlier on this train's journey failure of the electricity supply earlier today fire alarms sounding at a station fire alarms sounding earlier at a station fire brigade dealing with an incident fire brigade dealing with an incident near the railway fire brigade dealing with an incident near the railway earlier today fire brigade dealing with an incident near the railway yesterday flood water making the railway potentially unsafe flood water making the railway potentially unsafe earlier today flooding flooding flooding earlier flooding earlier in this train's journey flooding earlier today fog fog earlier forecasted heavy snow forecasted high winds forecasted severe weather forecasted slippery rails heavy rain flooding the railway heavy rain flooding the railway earlier today heavy snow heavy snow earlier in this train's journey heavy snow earlier today heavy snow over recent days high winds high winds high winds earlier high winds earlier in this train's journey high winds earlier today horses on the railway horses on the railway earlier today ice preventing this train getting electricity from the third rail ice preventing trains getting electricity from the third rail industrial action industrial action industrial action earlier today industrial action yesterday lightning damaging a station lightning damaging a train lightning damaging equipment lightning damaging the electricity supply lightning damaging the signalling system lightning damaging this train lightning having damaged equipment more trains than usual needing repairs at the same time over-running engineering works overcrowding overcrowding as this train has fewer coaches than normal overcrowding because an earlier train had fewer coaches than normal overcrowding because of a concert overcrowding because of a football match overcrowding because of a marathon overcrowding because of a rugby match overcrowding because of a sporting event overcrowding because of an earlier cancellation overcrowding because of an event overcrowding earlier on this train's journey overhead wire problems passengers causing a disturbance earlier in this train's journey passengers causing a disturbance on a train passengers causing a disturbance on a train earlier today passengers causing a disturbance on this train passengers transferring between trains passengers transferring between trains earlier police dealing with an incident police dealing with an incident near the railway police dealing with an incident near the railway earlier today police dealing with an incident near the railway yesterday poor rail conditions poor rail conditions earlier poor weather conditions poor weather conditions earlier predicted flooding predicted flooding earlier today safety checks being made safety checks having been made earlier severe weather severe weather earlier severe weather earlier in this train's journey severe weather earlier today severe weather preventing train crew getting to work sheep on the railway sheep on the railway earlier today signalling problems signalling staff being taken ill signalling staff being taken ill earlier on this train's journey signalling staff being taken ill earlier today slippery rails slippery rails earlier in this train's journey slippery rails earlier today snow snow earlier speed restrictions having been imposed the communication alarm being activated on a train the communication alarm being activated on this train the electricity being switched off for safety reasons the electricity being switched off for safety reasons earlier on this train's journey the electricity being switched off for safety reasons earlier today the emergency services dealing with an incident the emergency services dealing with an incident earlier today the fire alarm sounding at a station the fire alarm sounding at a station earlier today the fire alarm sounding in a signalbox the fire alarm sounding in a signalbox earlier on this train's journey the fire alarm sounding in a signalbox earlier today the fire alarm sounding in the signalling centre the fire alarm sounding in the signalling centre earlier on this train's journey the fire alarm sounding in the signalling centre earlier today the sea flooding the railway the sea flooding the railway earlier today the train conductor being taken ill the train departing late to maintain customer connections the train driver being taken ill the train for this service having broken down the train guard being taken ill the train making extra stops because a train was cancelled the train making extra stops because of service disruption the train manager being taken ill theft of overhead line electrification equipment theft of overhead line electrification equipment earlier today theft of overhead line electrification equipment yesterday theft of railway equipment theft of railway equipment earlier today theft of railway equipment yesterday theft of signalling cables theft of signalling cables earlier today theft of signalling cables yesterday theft of third rail electrification equipment theft of third rail electrification equipment earlier today theft of third rail electrification equipment yesterday thick fog thick fog earlier in this train's journey thick fog earlier today this train being late from the depot this train breaking down this train hitting an obstruction on the line this train hitting an obstruction on the line earlier in its journey this train hitting an obstruction on the line earlier on this train's journey this train hitting an obstruction on the line earlier today this train not stopping at a station it was supposed to this train not stopping at a station it was supposed to earlier in its journey this train not stopping at a station it was supposed to earlier today this train not stopping in the correct position at a station this train not stopping in the correct position at a station earlier in its journey this train not stopping in the correct position at a station earlier today this train's automatic braking system being activated this train's automatic braking system being activated earlier in its journey this train's automatic braking system being activated earlier today train crew being delayed train crew being delayed by service disruption train crew having been unavailable earlier trains being involved in an accident trespassers on the railway trespassers on the railway earlier in this train's journey trespassers on the railway earlier today urgent repairs to a bridge urgent repairs to a bridge earlier today urgent repairs to a tunnel urgent repairs to a tunnel earlier today urgent repairs to the railway urgent repairs to the railway earlier today urgent repairs to the track urgent repairs to the track earlier today vandalism vandalism at a station vandalism at a station earlier today vandalism at a station yesterday vandalism of railway equipment vandalism of railway equipment earlier today vandalism of railway equipment yesterday vandalism on a train vandalism on a train earlier today vandalism on a train yesterday vandalism on this train vandalism on this train earlier today vandalism on this train yesterday waiting earlier for a train crew member waiting for a part of the train to be attached waiting for a train crew member Of course I wouldn't do such a thing! Title: Re: JourneyCheck ... reasons given Post by: LiskeardRich on February 11, 2017, 10:40:47 We have a light fluttering of snow in cornwall. Normally brings cornwall to a stand still as it's a once in 5 or 6 year occurrence down here and many don't know how to react! ;D
Title: Re: JourneyCheck ... reasons given Post by: SandTEngineer on February 11, 2017, 13:48:43 We have a light fluttering of snow in cornwall. Normally brings cornwall to a stand still as it's a once in 5 or 6 year occurrence down here and many don't know how to react! ;D .....and we have had a little bit in Plymouth as well which usually brings the city and railway to a standstill........ ::) :P Title: Re: JourneyCheck ... reasons given Post by: JayMac on February 11, 2017, 17:05:00 Missing from the list:
an escaped puma, Chessington North badger eating a junction box at New Malden somebody stealing the lines at Surbiton ;D Title: Re: JourneyCheck ... reasons given Post by: Western Pathfinder on February 11, 2017, 17:36:26 This could start to sound an old episode of Reginald Perrin
Title: Re: JourneyCheck ... reasons given Post by: TonyK on February 11, 2017, 22:21:39 This could start to sound an old episode of Reginald Perrin I think it is! Along with Quote Seventeen minutes late, water seeping through the cables at Effingham Junction - there was a lot of Effingham and a good deal of Blindingham! Priceless! Title: Re: JourneyCheck ... reasons given Post by: JayMac on February 28, 2017, 09:32:21 This could start to sound an old episode of Reginald Perrin Life imitating art today: https://twitter.com/SW_Trains/status/836281010270703616 Quote #DisruptionSWT Services may be delayed through #Bookham, reports of an escaped Llama on the line 😂😂😂 Title: Re: JourneyCheck ... reasons given Post by: chuffed on February 28, 2017, 09:49:10 I perused that report..... ::)
Title: Re: JourneyCheck ... reasons given Post by: trainer on February 28, 2017, 18:36:38 Quote #DisruptionSWT Services may be delayed through #Bookham, reports of an escaped Llama on the line 😂😂😂 How a-llaming! Title: Re: JourneyCheck ... reasons given Post by: Surrey 455 on February 28, 2017, 22:34:22 This could start to sound an old episode of Reginald Perrin Life imitating art today: https://twitter.com/SW_Trains/status/836281010270703616 Quote #DisruptionSWT Services may be delayed through #Bookham, reports of an escaped Llama on the line 😂😂😂 I'm used to delays in the evening going home to Bookham. Normally on time or 2 or 3 minutes late but last nights delays were a little bit longer than normal but that was due to signal failures at or near Clapham Junction. Or so I thought..... Quote Seventeen minutes late, water seeping through the cables at Effingham Junction - there was a lot of Effingham and a good deal of Blindingham! Priceless! Incidentally Effingham Junction is the next station on the line from Bookham. Title: Re: JourneyCheck ... reasons given Post by: TonyK on March 01, 2017, 15:42:48 Life imitating art today: https://twitter.com/SW_Trains/status/836281010270703616 Quote #DisruptionSWT Services may be delayed through #Bookham, reports of an escaped Llama on the line 😂😂😂 I can help here. The llama is a quadruped which lives in the big rivers like the Amazon. It has two ears, a heart, a forehead, and a beak for eating honey... Title: Re: JourneyCheck ... reasons given Post by: Western Pathfinder on March 01, 2017, 18:55:32 It is also bigger than a frog .
Title: Re: JourneyCheck ... reasons given Post by: TonyK on March 01, 2017, 19:48:14 If you see one where people are swimming, you must shout "Cuidado! Llamas" - look out, there are llamas.
Although the ones I saw last month in Argentina seemed placid enough. Title: Re: JourneyCheck ... reasons given Post by: chuffed on March 01, 2017, 20:18:44 Rather expensive to buy one .. was going to call it alarm analeg !
Title: Re: JourneyCheck ... reasons given Post by: Rhydgaled on March 02, 2017, 10:17:14 Missing from the list: Also, I don't think I saw "overcrowding due to the operator refusing to use loco-hauled stock to increase capacity and blaming everything on the lack of extra DMUs for them to lease" on the list.an escaped puma, Chessington North badger eating a junction box at New Malden somebody stealing the lines at Surbiton ;D Title: Re: JourneyCheck ... reasons given Post by: JayMac on March 02, 2017, 11:27:53 If you see one where people are swimming, you must shout "Cuidado! Llamas" - look out, there are llamas. Also worth remembering, they are larger than frogs. Here's a short educational film, set to music, that tells you all about the llama: https://youtu.be/FbwkkXGmFrI Title: Re: JourneyCheck ... reasons given Post by: Western Pathfinder on March 02, 2017, 17:52:00 Thankyou Mac I've not seen that in years ;D.
Title: Re: JourneyCheck ... reasons given Post by: grahame on May 08, 2017, 15:28:52 Things repeat themselves ...
Quote COMMUTERS are used to being delayed but an unusual reason was made for late running rush hour service this morning - baby llamas on the track. from The Express (http://www.express.co.uk/news/uk/801746/Southeastern-trains-delayed-llamas-track) Title: Re: JourneyCheck ... reasons given Post by: chuffed on May 08, 2017, 17:38:32 Cue Peru lame llama jokes.....
Title: Re: JourneyCheck ... reasons given Post by: Western Pathfinder on May 08, 2017, 18:23:13 See above !.
Title: Re: JourneyCheck ... reasons given Post by: TonyK on May 08, 2017, 19:35:24 Déja vu was in a different episode...
Title: Re: JourneyCheck ... reasons given Post by: bobm on May 08, 2017, 21:29:41 Quote baby llamas on the track. No cause for a-llarm(a) then. Anyone lend me a coat? ;D Title: Re: JourneyCheck ... reasons given Post by: JayMac on May 09, 2017, 00:27:05 Would anyone like to visit the llama farm with me?
Alpaca picnic. Title: Re: JourneyCheck ... reasons given Post by: TonyK on May 09, 2017, 01:04:22 Quote baby llamas on the track. No cause for a-llarm(a) then. Anyone lend me a coat? ;D I've kept mine close to the door.... Title: Re: JourneyCheck ... reasons given Post by: Western Pathfinder on May 09, 2017, 08:12:08 Quote baby llamas on the track. No cause for a-llarm(a) then. Anyone lend me a coat? ;D Yes Bob it's a alpaca mac Title: Re: JourneyCheck ... reasons given Post by: chuffed on May 09, 2017, 08:25:23 Quote baby llamas on the track. No cause for a-llarm(a) then. Anyone lend me a coat? ;D Yes Bob it's a alpaca mac Isn't an alpaca mac when BNM wears his high neck scarf with his goggles a la Mr Toad when pottering about in his Model T Ford ? Title: Re: JourneyCheck ... reasons given Post by: grahame on July 19, 2017, 17:37:33 Quote 23:06 Bristol Temple Meads to Exeter St Davids due 00:52 Facilities on the 23:06 Bristol Temple Meads to Exeter St Davids due 00:52. Toilet facilities are not available. This is due to a fault with the signalling system. Errr .... Title: Re: JourneyCheck ... reasons given Post by: chuffed on July 19, 2017, 17:40:51 Never seen a semaphore signal for vacant and engaged before.
Some pax might get confused if they are on the throne and see a red signal for stop and a green one for go. What they would do at a double yellow is anyone's guess....... ::) Some may be wondering what the issue might be........ Title: Re: JourneyCheck ... reasons given Post by: Tim on July 19, 2017, 17:49:23 Quote 23:06 Bristol Temple Meads to Exeter St Davids due 00:52 Facilities on the 23:06 Bristol Temple Meads to Exeter St Davids due 00:52. Toilet facilities are not available. This is due to a fault with the signalling system. Errr .... Perhaps the train is being held in a station by a faulty signal. We all know toilets can't be used in stations. ;D Title: Re: JourneyCheck ... reasons given Post by: patch38 on July 19, 2017, 17:51:56 What they would do at a double yellow is anyone's guess....... ::) Unzip? Title: Re: JourneyCheck ... reasons given Post by: Western Pathfinder on July 19, 2017, 18:31:34 Or park on it.
Title: Re: JourneyCheck ... reasons given Post by: Alan Pettitt on July 19, 2017, 19:48:00 There seems to be a bit of a run of these inconveniences:
17:30 Weymouth to Bristol Temple Meads due 20:09 Facilities on the 17:30 Weymouth to Bristol Temple Meads due 20:09. Toilet facilities are not available. This is due to a fault with the signalling system. Title: Re: JourneyCheck ... reasons given Post by: Adelante_CCT on July 19, 2017, 20:16:40 All posted this morning, so presumably a set swap for this diagram as a result of a signalling problem this morning.
(Well someone had to be the first to post a sensible comment on the subject!) :) Title: Re: JourneyCheck ... reasons given Post by: John R on July 19, 2017, 20:37:32 All posted this morning, so presumably a set swap for this diagram as a result of a signalling problem this morning. (Well someone had to be the first to post a sensible comment on the subject!) :) Though to the best of my knowledge, all GWR stock has toilet facilities? Title: Re: JourneyCheck ... reasons given Post by: PhilWakely on July 19, 2017, 21:00:43 All posted this morning, so presumably a set swap for this diagram as a result of a signalling problem this morning. (Well someone had to be the first to post a sensible comment on the subject!) :) Or probably a lack of set-swap and the same unit without working facilities will be used on those services. "Due to more than the usual number requiring repairs at the same time" Title: Re: JourneyCheck ... reasons given Post by: LiskeardRich on July 20, 2017, 10:13:16 Maybe it was late due to a signal fault, and didn't have time to get the tank drained and now the toilet tank is full?
Title: Re: JourneyCheck ... reasons given Post by: bobm on July 20, 2017, 20:32:41 I was told today in the West there were 64 units to cover 64 diagrams with no spares. So on days like that providing it is safe to put in traffic it is going to run even if it means no working air cooling, toilets or short-formed.
It also means that if a unit hasn't got a maintenance exam due to ending the day in the wrong place because of disruption it isn't going to be going out to play the next day - hence the rather curious messages on Journeycheck. Title: Re: JourneyCheck ... reasons given Post by: Chris from Nailsea on August 16, 2017, 20:23:09 I received a text message last Thursday, informing me that the 18:20 BRI to NLS would not call at its destination due to 'the train manager being taken ill.'
Hopefully, that member of staff will have recovered by now - but it's the first time I've seen that offered as a reason for delay / cancellation? Title: Re: JourneyCheck ... reasons given Post by: NickB on August 17, 2017, 07:29:17 The 7.08 Maidenhead to Paddington was cancelled this morning 'due to a fault on this train'. This was declared early on its route so I had time to check the intended path and it would appear that the fault was a nasty case of maidenheaditus because the train managed to call at every other stop, and clattered through the platform about 8mins later than intended. Obviously it didn't stop as it had 'a fault'.
Can anyone explain a fault that only affects one station stop?() Title: Re: JourneyCheck ... reasons given Post by: grahame on August 17, 2017, 07:34:30 Can anyone explain a fault that only affects one station stop? * a failure of selective door opening mechanism against a short platform * less passenger space available than normal (faulty carriage), stop removed to avoid overcrowding * delay early on journey due to fault, skipping a stop to get back on time * Substitution of faulty train by different type not cleared for platforms (e.g. Platform 3 Salisbury, class 153!) * Stop would be at bottom of a climb and train running on limited power (e.g. Totnes) Not sure which / if any of these could apply in your case. Noting Honeybourne also missed out ... Edit - added a further possibility to the general case. Title: Re: JourneyCheck ... reasons given Post by: Rhydgaled on August 21, 2017, 09:43:15 Not sure if this is the right place for this, but is Real Time Trains a definitive source for what happened on a given day? This past Saturday (19th August 2017), the eastbound Pembroke Coast Express (10:01 Pembroke Dock to London Paddington) was poorly. The station announcments at Carmarthen were saying the train was delayed 'due to a train fault' and, sure enough, the engine in one of the power cars seemed to be dead (the power car was making noises, but none of them sounded like a diesel engine to me).
My question is what did FirstGWR do about it? The station announcements were saying that the train will not call at Swansea, Neath, Port Talbot Parkway and Bridgend today, suggesting that the stops had been pulled to help the service make up time. However, Real Time Trains is saying (http://www.realtimetrains.co.uk/train/C23728/2017/08/19/advanced) that the train did call at Swansea (12 minutes late); and was then cancelled. Which is right, the platform announcments or Real Time Trains? Title: Re: JourneyCheck ... reasons given Post by: IndustryInsider on August 21, 2017, 11:23:06 RTT is usually correct - only usually wrong if a manual report has been made erroneously. Looks like 1L62 terminated at Swansea and was then restarted using another set at Cardiff (as 1Z62), so both sources are correct. I suppose you could say it said it wasn't calling at Swansea but it did, but in terms of departing passengers it didn't, IYSWIM?
Title: Re: JourneyCheck ... reasons given Post by: Rhydgaled on August 21, 2017, 13:01:48 RTT is usually correct - only usually wrong if a manual report has been made erroneously. Ok, so RTT is probably correct in this case, thanks for the reply.Looks like 1L62 terminated at Swansea and was then restarted using another set at Cardiff (as 1Z62), so both sources are correct. I suppose you could say it said it wasn't calling at Swansea but it did, but in terms of departing passengers it didn't, IYSWIM? But, for any passengers at Carmarthen bound for Swansea, Neath, Port Talbot or Bridgend who heard the announcement it was incorrect since they may have decided unecessarily to remain at Carmarthen to await a train that was calling at those places. Also, it may have given passengers false hope that they could get to Cardiff (and Paddington) on the partly-failed set rather than being stuck in Swansea.Definately a misleading announcment (so the 'smoke and mirrors' board at least is an appropriate place for this). I'm supprised there was a set available to restart the service at Cardiff, since GWR's depot in south Wales is at Swansea they'd be more likely to find a spare set there I would have thought. Title: Re: JourneyCheck ... reasons given Post by: bobm on August 21, 2017, 13:33:49 I'm supprised there was a set available to restart the service at Cardiff, since GWR's depot in south Wales is at Swansea they'd be more likely to find a spare set there I would have thought. There was an empty HST running from Bristol to Landore which was stopped at Cardiff to form 1Z62 with a slightly late start. Title: Re: JourneyCheck ... reasons given Post by: Timmer on August 21, 2017, 13:45:17 There was an empty HST running from Bristol to Landore which was stopped at Cardiff to form 1Z62 with a slightly late start. That's what I call quick thinking and providing a good service as that would have caused inconvenience to do that but that's what should be happening...putting passengers first.Title: Re: JourneyCheck ... reasons given Post by: Rhydgaled on August 21, 2017, 14:10:18 I'm supprised there was a set available to restart the service at Cardiff, since GWR's depot in south Wales is at Swansea they'd be more likely to find a spare set there I would have thought. There was an empty HST running from Bristol to Landore which was stopped at Cardiff to form 1Z62 with a slightly late start. Title: Re: JourneyCheck ... reasons given Post by: IndustryInsider on August 21, 2017, 14:55:19 As well as an available train, you also need available crew as well of course. I this case it looks like it all fell reasonably into place.
Title: Re: JourneyCheck ... reasons given Post by: Worcester_Passenger on August 21, 2017, 15:58:27 Can anyone explain a fault that only affects one station stop? * Stop would be at bottom of a climb and train running on limited power (e.g. Totnes) Not sure which / if any of these could apply in your case. Noting Honeybourne also missed out ... Honeybourne gets missed out if an HST has only one power car working. 4.5 miles at 1 in 100. Title: Re: JourneyCheck ... reasons given Post by: Adelante_CCT on October 01, 2017, 22:38:31 errrrr, has the Transwilts unit made its way to Reading? :)
Quote 21:44 Reading to Bedwyn due 22:25 Facilities on the 21:44 Reading to Bedwyn due 22:25. Will be formed of 1 coach instead of 2. This is due to more trains than usual needing repairs at the same time. Title: Re: JourneyCheck ... reasons given Post by: Adelante_CCT on July 29, 2018, 10:54:29 Quote 13:00 London Paddington to Plymouth due 16:55 will be delayed between Reading and Didcot Parkway by 9 minutes, will be further delayed at Chippenham and is expected to be 16 minutes late. This is due to a speed restriction over an embankment. ? Title: Re: JourneyCheck ... reasons given Post by: PhilWakely on July 29, 2018, 11:24:37 Quote 13:00 London Paddington to Plymouth due 16:55 will be delayed between Reading and Didcot Parkway by 9 minutes, will be further delayed at Chippenham and is expected to be 16 minutes late. This is due to a speed restriction over an embankment. ? High winds perchance? Title: Re: JourneyCheck ... reasons given Post by: Adelante_CCT on July 29, 2018, 11:53:42 High winds, that are so isolated it only affects one train between Reading and Chippenham? :D
Title: Re: JourneyCheck ... reasons given Post by: Adelante_CCT on July 29, 2018, 16:47:29 Well as expected, no 16 minute delay on the service
Title: Re: JourneyCheck ... reasons given Post by: grahame on September 18, 2018, 17:16:20 Just when you thought you had seen it all ...
Quote 17:22 Newquay to Par due 18:11 17:22 Newquay to Par due 18:11 will be cancelled. This is due to a wartime bomb near the railway. Title: Re: JourneyCheck ... reasons given Post by: Lee on September 18, 2018, 17:17:43 Don't panic, Mr Mainwaring!
Title: Re: JourneyCheck ... reasons given Post by: RA on September 18, 2018, 21:29:11 Just when you thought you had seen it all ... A member of the public handed in an old hand grenade at Newquay police station. The railway station fell within the initial exclusion zone.Quote 17:22 Newquay to Par due 18:11 17:22 Newquay to Par due 18:11 will be cancelled. This is due to a wartime bomb near the railway. Title: Re: JourneyCheck ... reasons given Post by: grahame on September 19, 2018, 08:27:37 Just when you thought you had seen it all ... A member of the public handed in an old hand grenade at Newquay police station. The railway station fell within the initial exclusion zone.Quote 17:22 Newquay to Par due 18:11 17:22 Newquay to Par due 18:11 will be cancelled. This is due to a wartime bomb near the railway. From Cornwall Live (https://www.cornwalllive.com/news/cornwall-news/grenade-caused-massive-disruption-newquay-2019511) Quote There was mass disruption in the centre of Newquay on Tuesday (september 18) after a man walked into a police station with a hand grenade. The bomb squad were called in as the police station and neighbouring train station were sealed off by officers. The police station was evacuated. The incident caused disruption to train services running though the town with bomb disposal experts not arriving on scene until several hours later. ... Title: Re: JourneyCheck ... reasons given Post by: TonyK on September 20, 2018, 19:40:43 From Cornwall Live (https://www.cornwalllive.com/news/cornwall-news/grenade-caused-massive-disruption-newquay-2019511) Quote The incident caused disruption to train services running though the town with bomb disposal experts not arriving on scene until several hours later. ... They decided to come by train. Title: Re: JourneyCheck ... reasons given Post by: Worcester_Passenger on December 15, 2018, 19:17:11 Not sure what to make of this one:
Quote 18:35 Great Malvern to London Paddington due 21:25 Facilities on the 18:35 Great Malvern to London Paddington due 21:25. Toilet facilities are available as normal. This is due to a fault on this train. Last Updated:15/12/2018 15:25 Title: Re: JourneyCheck ... reasons given Post by: grahame on August 30, 2019, 19:12:16 Is this a new one?
Quote 15:03 London Paddington to Penzance due 20:40 15:03 London Paddington to Penzance due 20:40 has been delayed at Pewsey and is now 20 minutes late. This is due to this train not stopping in the correct position at a station. Title: Re: JourneyCheck ... reasons given Post by: martyjon on August 30, 2019, 19:46:36 Is this a new one? Quote 15:03 London Paddington to Penzance due 20:40 15:03 London Paddington to Penzance due 20:40 has been delayed at Pewsey and is now 20 minutes late. This is due to this train not stopping in the correct position at a station. Maybe an alternative way of reporting the train overshot the station platform. Title: Re: JourneyCheck ... reasons given Post by: Surrey 455 on August 30, 2019, 23:03:03 Is this a new one? Quote 15:03 London Paddington to Penzance due 20:40 15:03 London Paddington to Penzance due 20:40 has been delayed at Pewsey and is now 20 minutes late. This is due to this train not stopping in the correct position at a station. Maybe an alternative way of reporting the train overshot the station platform. I can recall being on a slam door train many years ago from Paddington that overshot / forgot to stop at Acton Main Line. The train came to a halt shortly after and then reversed back to Acton ML. I'm not sure that would be an acceptable practice today. This page is printed from the "Coffee Shop" forum at http://gwr.passenger.chat which is provided by a customer of Great Western Railway. Views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that content provided contravenes our posting rules ( see http://railcustomer.info/1761 ). The forum is hosted by Well House Consultants - http://www.wellho.net |