Hi all,

Popping into Reading on Saturday, I was taking in all the work happening at the new depot area, and noticed that there is a lot of (for want of a better description) raw track, laid out very roughly along a lot of the length of the construction area. Whilst travelling along looking at said track, it suddenly dawned on me how long each piece is.

Then the inevitable question popped into my head ... how the heck does the track get to the railway ?! It looks way too long to fit on a lorry, so I assume it travels by rail, but then thought its too long to go around the bends, surely ???

I'm intrigued!


Title: Re: Tracks
Post by: dog box on April 23, 2012, 12:37:58
Network Rail have a special track dropping off train which is made up of a large number of wagons with a sort of framework to transport and deposit large lengths of track, each length spans many wagon lengths i expect someone wil lbe able to find a photo to post on here


Title: Re: Tracks
Post by: paul7575 on April 23, 2012, 17:04:24
Continuous welded rail (CWR) delivery trains are used to move rail to site, and yes the rail does bend round curves - just like the rail that the trains are running on!

I found a video that explains everything about rail delivery, there's a bit of preamble and it gets going about 4 minutes in:

http://www.youtube.com/watch?v=yQDlgmyoGPY

For replacement they'll deliver the new rail either between or alongside the running rails as shown, but for a new job such as at Reading they can drop the rail somewhere alongside the nearest operational track, and then it just gets pulled along the ground to where it is needed.  A track construction machine can then deliver and position the new sleepers, and clip the track onto the sleepers as it goes along.

Interesting video here shows what I mean by new track construction - notice that all there is on the ground ahead is a pair of rails:

http://www.youtube.com/watch?v=piBEReyydBU

Rail is delivered from the steelworks in half lengths IIRC, and is welded up into 216m max lengths at Network Rail sites such as at Eastleigh, they have just started a  rail recycling process as well, where they'll cut the defects out of returned CWR and re-weld it into usable 216m lengths for secondary routes.

Paul


Title: Re: Tracks
Post by: TonyK on April 23, 2012, 17:21:55
Very true - Tata Steel can supply rail in lengths of 220 metres, or even longer. The maximum length is the length of the delivery train. Going around bends isn't a problem. In lengths like this, without tension, the steel bends easily.


Title: Re: Tracks
Post by: Boppy on April 24, 2012, 11:34:59
Hi,

I have another question about tracks that I'm sure lots of people on this forum can answer.

What is the white stuff (looks like paint but may be some thermal compound or something?) that appears to have been applied to the vertical sides of the track at points an don rails around junctions in general.

It appears in various places between Reading and Paddington on my daily commute but I'm guessing is done across the country.

Thanks,

Boppy.


Title: Re: Tracks
Post by: lordgoata on April 24, 2012, 12:35:52
Continuous welded rail (CWR) delivery trains are used to move rail to site, and yes the rail does bend round curves - just like the rail that the trains are running on!

Er yes, I guess in hindsight that was pretty obvious! LOL :-D

Thanks for the info and videos, was very interesting! I could sit and watch them building at Reading all day long, I love seeing how it all develops.


Title: Re: Tracks
Post by: mjones on April 24, 2012, 13:06:23
Yes, I'm sure there are a number of us here who find looking at the latest developments at Reading on their way to work more interesting than what they find when they get there!


Title: Re: Tracks
Post by: BerkshireBugsy on April 24, 2012, 13:15:28
Hi,

I have another question about tracks that I'm sure lots of people on this forum can answer.

What is the white stuff (looks like paint but may be some thermal compound or something?) that appears to have been applied to the vertical sides of the track at points an don rails around junctions in general.

It appears in various places between Reading and Paddington on my daily commute but I'm guessing is done across the country.

Thanks,

Boppy.


I had noticed this on my journey into reading on the Kennet line and assumed it was something to do with maintenance - we should be told!


Title: Re: Tracks
Post by: Tim on April 24, 2012, 14:54:48
Hi,

I have another question about tracks that I'm sure lots of people on this forum can answer.

What is the white stuff (looks like paint but may be some thermal compound or something?) that appears to have been applied to the vertical sides of the track at points an don rails around junctions in general.

It appears in various places between Reading and Paddington on my daily commute but I'm guessing is done across the country.

Thanks,

Boppy.


it is all over the place.  My guess is that it is either:

1) to highlight tripping hazards fro track gangs working at night,  or
2) to reflect the sun and prevent the trackwork heating up, expanding and distorting.


Title: Re: Tracks
Post by: eightf48544 on April 24, 2012, 15:13:50
1. is near the mark it's all part of the drive towards the 24/7 railway.

As I understand it, it mainly occurs on switches and crossings and is there to alert tamper drivers that they will have to adjust their tamping to accomodate the extra rails.

On the WCML the drive towards the 24/7 railway has led to the installation of banks of permanent lights alongside junctions to allow round the clock maintenance. It save having to bring along genrators and stringing lights off poles.


Title: Re: Tracks
Post by: Boppy on April 24, 2012, 17:35:41
Thanks for the answer eightf48544!

Boppy.


Title: Re: Tracks
Post by: Electric train on April 24, 2012, 18:15:59
The white paint is applied in the summer months to reduce solar heating of the rails, such a simple thing as painting the rail white reduces track circuit faults and other heat stress related failures.  Solar heating is also why some Loc's (location cabinets the boxes that hold track side signaling equipment) have had addition white hats fitted.


Title: Re: Tracks
Post by: Boppy on April 25, 2012, 13:26:17
Thanks Electric Train.

Interesting to know that it has such an affect!


Title: Re: Tracks
Post by: tramway on April 26, 2012, 22:21:48
In lengths like this, without tension, the steel bends easily.

Possibly not what you were inferring in you comment FTN, but it may be useful for others if there was something readily available regarding pre-tensioning of CWR, which may go some way in explaining the reason behind the speed restriction at Bathampton junction the other week during the warm spell. It was a recently relaid section that may not have been tensioned IIRC, and possibly not completely tamped.

It's quite interesting how thermal expasion/contraction is compensated for over large sections of solid rail.


Title: Re: Tracks
Post by: ellendune on April 26, 2012, 22:29:41
As I recall (from over 30 years ago) the rail is fixed so that at a temperature that is 2/3 of the way up the accepted temperatuer range, there is no tension or compression.  So at the lower 2/3 of temperatures the rail is in tension (no problem) and at the higher 1/3 of temperatures it moves in to compression (which is when the risk of buckling starts).  This way the extent of compressive forces are limited.  The process of achiveing this is called destressing. 

If my memory iss playing tricks I am sure someone will correct me.  They might also remember the temperatures concerned. 


Title: Re: Tracks
Post by: paul7575 on April 27, 2012, 09:51:09
That's basically how I believe it works, with the proviso that it can need adjusting seasonally in some areas.  I remember reading that LU got caught out on the Central Line one year (quite recently) when summer came a bit earlier, and the rail stressing wasn't adjusted in time?

Paul


Title: Re: Tracks
Post by: TonyK on July 07, 2012, 10:02:29
Metrolink in Manchester are doing their tensioning at night, because  it needs to be done cold. This seems to confirm what Ellendunne says.



This page is printed from the "Coffee Shop" forum at http://gwr.passenger.chat which is provided by a customer of Great Western Railway. Views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that content provided contravenes our posting rules ( see http://railcustomer.info/1761 ). The forum is hosted by Well House Consultants - http://www.wellho.net