Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 17:15 30 Dec 2024
 
- Replacement 'green' ferry emits more CO2 than old diesel ship
- What we know so far
- The driver who 'jumped' his bus over the Tower Bridge gap
- Avanti West Coast strike to hit New Year's Eve trains
- Gatwick flights returning to normal after fog
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 01/01/25 - Railway 200 'Whistle Up' UK
09/01/25 - Bath Railway Society
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end

On this day
30th Dec (1956)
Liverpool Overhead Railway closed (link)

Train RunningDelayed
16:48 London Paddington to Swansea
17:03 London Paddington to Penzance
17:30 London Paddington to Taunton
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
December 30, 2024, 17:25:10 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[121] The Wider Picture - making it wider, but also clearer, hopeful...
[91] Working from roam: more people logging on from UK airports and...
[56] Server Map (mark 2) - as from January 2025 - a technical intro...
[51] Weekend of 28th/29th December - Coffee Shop offline for engine...
[48] Terrible signalling error!
[41] Southern Railway to axe toilets from new train (BBC News 19/09...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 33 34 [35] 36 37 ... 39
  Print  
Author Topic: Oxford station - facilities, improvements, parking, incidents and events - merged posts  (Read 451185 times)
Mark A
Global Moderator
Hero Member
*****
Posts: 1786


View Profile
« Reply #510 on: August 03, 2023, 14:00:39 »

That deepened road bridge is going to need a reliable set of pumps for when the Isis tops her banks.

I think the dip under the existing bridge is drained by a pump and if that's always been the case it's a shame that exactly what was the pump provision in the early days of the line will be something lost to time.

Ah, a map, surveyed 1876, and next to the bridge, a 'Pump room'.

https://maps.nls.uk/view/231278895

The pump room persists on later 25" mapping, though it might have shrunk. Works to replace the Botley Road rail bridge will expose and remove elements of these early installations.

Ah, 'Tales of the unexpected' emerged during the first half of July....

https://www.bbc.co.uk/news/uk-england-oxfordshire-66133325

Now wondering what it is they're discovering. Not really much detail in that BBC» (British Broadcasting Corporation - home page) item, which marks something different to the photos that appear elsewhere. For starters, if the dip beneath the bridge is below the water table, understandable to floor it out with an invert perhaps if only to ease the work if they drained it using something steam-driven.

Mark
Logged
ray951
Transport Scholar
Hero Member
******
Posts: 500


View Profile
« Reply #511 on: September 19, 2023, 11:23:05 »

Network Rail saying the Botley Road bridge will not reopen this winter.

NR» (Network Rail - home page) said "This project is extremely complex and has been made even more challenging by the extent of the brick arch underneath the road. We’ve explored a number of options to deliver the works which included moving to working around the clock, but unfortunately with needing the infrastructure to be ready by the end of next year we have no choice but to keep the road closed until October 2024. "

https://www.networkrailmediacentre.co.uk/news/network-rail-announces-continuation-of-botley-road-closure-after-unique-challenges-delayed-the-work-this-summer
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13004


View Profile Email
« Reply #512 on: September 19, 2023, 19:47:39 »

What's not at all clear is whether, having extended the work by over 6 months, there is need to work 24/7 beyond the original end date this year of end October. I can't believe that they've got *that* far behind.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10357


View Profile
« Reply #513 on: September 19, 2023, 20:03:26 »

I’d expect 24/7 working to cease as a result.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
ChrisB
Transport Scholar
Hero Member
******
Posts: 13004


View Profile Email
« Reply #514 on: September 19, 2023, 20:18:37 »

so would I, but zero mention of this. Surprisingly, as they really needed a softener for that news. The West Oxford traders are really suffering
Logged
Rostock0
Jr. Member
**
Posts: 27


View Profile Email
« Reply #515 on: January 03, 2024, 19:04:21 »

Seems weird that they discovered new problems as they went along. I mean, it's all above ground and easily inspectable before starting, no?

-> actually I've just seen that the problem was that they discovered an arch underground......
Logged
Mark A
Global Moderator
Hero Member
*****
Posts: 1786


View Profile
« Reply #516 on: January 04, 2024, 09:17:30 »

Seems weird that they discovered new problems as they went along. I mean, it's all above ground and easily inspectable before starting, no?

-> actually I've just seen that the problem was that they discovered an arch underground......

It's a lovely illustration of the value of record keeping for underground structures, and the ability of major components to fade from memory once they're removed from the day to day narrative. Given that the builders gave the dip beneath Botley rail bridge a brick invert presumably to hold back the groundwater, and the dip still originally needed a steam-powered pump to drain it, it's surprising in a way that the presence of the brick invert faded from memory to the extent that it had to be rediscovered.

Mark
Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4504


View Profile
« Reply #517 on: January 04, 2024, 12:03:32 »

Given that the builders gave the dip beneath Botley rail bridge a brick invert presumably to hold back the groundwater, and the dip still originally needed a steam-powered pump to drain it, it's surprising in a way that the presence of the brick invert faded from memory to the extent that it had to be rediscovered.

Hindsight is the only perfect science.  So the present station opened in 1852 that's over 170 years ago, or over 5 generations. Do you think you are being optimistic about what people might be expected to be remembered if there are no records?

Believe me you can do all the desk studies, reviews of old records, site investigations you like and you will still find surprises when you dig underground. Remember in this case it is almost certain that they could not dig extensive trial holes to locate services - especially those that were not on records. Perhaps there was once an old drawing with this culvert on it or perhaps it was what we used to call 'sort out on site'  with no design drawing ever made.

I have seen drawings which told me detailed construction of a particular tunnelled culvert and even the date (to the day) each section was built, but these drawings are rare and if they did exist are usually lost or thrown away at some point in the past. I have also seen what were thought to be record drawings that did not say whether the proposal was ever built and some did not even identify where they were. 

A famous tunnelling engineer was once asked  what the ideal site investigation was for a tunnel - his replay was to construct a tunnel along the route of the proposed tunnel at twice the diameter!

Logged
Noggin
Hero Member
*****
Posts: 560


View Profile
« Reply #518 on: January 04, 2024, 18:08:52 »

One of the best bits of professional advice I received was that if you see a flat piece of ground, ask yourself who flattened it, when and how - because it tends not to happen of its own accord and goodness knows what can lurk beneath.
Logged
CyclingSid
Data Manager
Hero Member
******
Posts: 2100


Hockley viaduct


View Profile
« Reply #519 on: January 10, 2024, 18:55:11 »

I missed this https://www.bbc.co.uk/news/av/uk-england-oxfordshire-67896885

Will this put it back another month?
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10357


View Profile
« Reply #520 on: January 10, 2024, 19:50:45 »

I don’t think so.  The flooding seemed to coincide with the Xmas/New Year shutdown.  The water magically disappeared, sooner than flooding on roads in the nearby vicinity, when the workers returned.  So perhaps the pumps had been switched off during the shutdown?
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Mark A
Global Moderator
Hero Member
*****
Posts: 1786


View Profile
« Reply #521 on: January 11, 2024, 09:19:12 »

It'll be history now, but, odd, the video, those two blue discharge pipes leading from who knows what submersible pumps beneath the  surface, discharging water... back into the flood.

Mark
Logged
ray951
Transport Scholar
Hero Member
******
Posts: 500


View Profile
« Reply #522 on: July 10, 2024, 13:07:06 »

The project to replace Botley Road Bridge seems to have gone very quiet.

According to NR» (Network Rail - home page) the bridge is due to be replaced between July 27 and July 31st 2024, and that is less than 3 weeks away. https://www.networkrail.co.uk/running-the-railway/our-routes/western/oxfordshire/botley-road-bridge-replacement/

I have seen no advertising around replacement bus services and GWR (Great Western Railway) seem to be running a normal train service and there is no mention of engineering works between those dates on their website. https://www.gwr.com/travel-information/travel-updates/planned-engineering.

So can we assume that this project is running late? And if it is has anyone seen any mention of alternative dates? 

And what is the impact on the opening of Botley Road which is supposed to happen in October 2024?
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10357


View Profile
« Reply #523 on: July 10, 2024, 16:03:15 »

The project to replace Botley Road Bridge seems to have gone very quiet.

According to NR» (Network Rail - home page) the bridge is due to be replaced between July 27 and July 31st 2024, and that is less than 3 weeks away. https://www.networkrail.co.uk/running-the-railway/our-routes/western/oxfordshire/botley-road-bridge-replacement/

I have seen no advertising around replacement bus services and GWR (Great Western Railway) seem to be running a normal train service and there is no mention of engineering works between those dates on their website. https://www.gwr.com/travel-information/travel-updates/planned-engineering.

So can we assume that this project is running late? And if it is has anyone seen any mention of alternative dates? 

And what is the impact on the opening of Botley Road which is supposed to happen in October 2024?

There's plenty of mention of it on that GWR page including:

Oxford area - Saturday 27th to Wednesday 31st July
Track renewal work will affect train services between Oxford and Banbury, plus trains between Oxford and Didcot Parkway on the weekend of 27/28 July.

Replacement buses are planned between:

    Oxford and Banbury (on all dates)
    Oxford and Didcot Parkway (weekend of 27/28 July only)


In addition all the replacement/amended services are loaded into the journey planners and realtimetrains.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
ChrisB
Transport Scholar
Hero Member
******
Posts: 13004


View Profile Email
« Reply #524 on: July 10, 2024, 17:24:40 »

It does seem that the actual bridge replacement is going in over the weekend, as trains appear to run again from Monday in a southbound direction.

The Oxford-Banbury RRS is to do with other unconnected works in the Aynho junction area as there is a total block between Banbury & Bicester Village.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 33 34 [35] 36 37 ... 39
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page