stuving
|
|
« Reply #30 on: May 20, 2021, 00:07:48 » |
|
Today (Wednesday 19th) the siding finally opened to receive guests - a few days after other hospitality venues. I've got some pictures, which will have to wait until tomorrow. They show what crew access to a siding looks like now, under the latest agreement with ASLEF» .
The visitor was a pair of 707s, running as 5Z41 from Waterloo and then, after lunch, as 5Y68 to Wimbledon Park Depot Sidings. It ran as if for training, calling like a passenger service (until reversing at Twickenham), which does seem odd for 707s. It came out of the siding at walking pace, which might be standard practice or it might be because it was the first test use.
From now on there is a late afternoon Q path in the WTT▸ , from Staines Up Loop to Reading, for reasons that are hardly clear. But no operational use has yet been timetabled. Both Traksy and OTT▸ showed the siding before his, but neither has a berth in it even now - the departing train just appeared from nowhere in Wokingham P2.
|
|
« Last Edit: May 20, 2021, 00:18:32 by stuving »
|
Logged
|
|
|
|
IndustryInsider
|
|
« Reply #31 on: May 20, 2021, 01:34:05 » |
|
Good to see it open, it's a 15mph siding, so probably just taking it cautiously.
Regarding a proper berth for it, you may well see one when the area is resignalled (2024?) but not before.
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
stuving
|
|
« Reply #32 on: May 20, 2021, 22:54:37 » |
|
Here is what a proper siding, and the walking route to it, looks like these days. The new fence seems to have been a bit of an afterthought, and wasn't finished when AmcoGiffen took their site office away (they are still doing some sort of landscaping to it). And a bit of work was going on today; by the look of it some of those lights needed redoing. Given how many there are, it wouldn't be a big fraction of them.
By the way, I'm not really suggesting that improving safety isn't worthwhile - just that it has a cost, and in this case it contributes only marginally to operational performance.
|
|
|
Logged
|
|
|
|
Electric train
|
|
« Reply #33 on: May 21, 2021, 07:13:13 » |
|
Here is what a proper siding, and the walking route to it, looks like these days. The new fence seems to have been a bit of an afterthought, and wasn't finished when AmcoGiffen took their site office away (they are still doing some sort of landscaping to it). And a bit of work was going on today; by the look of it some of those lights needed redoing. Given how many there are, it wouldn't be a big fraction of them.
By the way, I'm not really suggesting that improving safety isn't worthwhile - just that it has a cost, and in this case it contributes only marginally to operational performance.
The fence has more to do with crime reduction than public safety, when trains are berthed in the siding there is a high risk of graffiti. It will not have been an after though it would have been part of the formal design for the siding, it is also likely that boundary fence reinforcement has or will be carried out elsewhere
|
|
|
Logged
|
Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,β
|
|
|
IndustryInsider
|
|
« Reply #34 on: December 03, 2021, 14:02:22 » |
|
Has anyone seen anything using this siding in anger yet?
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
eightonedee
|
|
« Reply #35 on: December 03, 2021, 18:04:47 » |
|
The same question occurred to me on Tuesday when I noted to patina of rust on the rails when I passed it on the way to Guildford!
|
|
|
Logged
|
|
|
|
bobm
|
|
« Reply #36 on: December 03, 2021, 18:15:54 » |
|
It has been used a couple of times in connection with rolling stock failures.
|
|
|
Logged
|
|
|
|
stuving
|
|
« Reply #37 on: December 03, 2021, 18:41:33 » |
|
Has anyone seen anything using this siding in anger yet?
The only thing I can recall seeing parked there is the odd RHTT▸ .
|
|
|
Logged
|
|
|
|
Electric train
|
|
« Reply #38 on: December 04, 2021, 08:07:51 » |
|
The same question occurred to me on Tuesday when I noted to patina of rust on the rails when I passed it on the way to Guildford!
It is posible the siding is for perturbation, and as turnback use during engineering possessions also as a cripple siding
|
|
|
Logged
|
Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,β
|
|
|
stuving
|
|
« Reply #39 on: December 26, 2022, 23:31:02 » |
|
I did question why this long access platform was built at our siding. Well, now we know! It's a working platform for the local freelance paint contractors to work from*.
You might also ponder why, having picked an out-of-depot siding that is monitored - overlooked by a signal box staffed 24/7 - they put a train there on the only day (or two) of the year when the box is closed.
* and at such very affordable rates, too.
|
|
|
Logged
|
|
|
|
IndustryInsider
|
|
« Reply #40 on: December 27, 2022, 10:11:48 » |
|
Oh dear. Still, itβs a testing time for graffiti artists due to price rises. Maybe it would have been a better idea to stable some 769s there and hand out some free crayons?
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
Fourbee
|
|
« Reply #41 on: December 27, 2022, 10:17:33 » |
|
I was literally just about to post at least GWR▸ let them practise on 769s, not brand new 701s.
|
|
|
Logged
|
|
|
|
bobm
|
|
« Reply #42 on: January 10, 2023, 09:01:47 » |
|
I noticed coming through Wokingham this morning there was a graffitied train in the siding. Is that the same one?
|
|
|
Logged
|
|
|
|
stuving
|
|
« Reply #43 on: January 10, 2023, 09:09:41 » |
|
I noticed coming through Wokingham this morning there was a graffitied train in the siding. Is that the same one?
Yes, it's been there all along. SWR» must be really short of space. But after the first bit of painting on each side I've seen no more. So maybe the signal box really is a deterrent.
|
|
|
Logged
|
|
|
|
Electric train
|
|
« Reply #44 on: January 10, 2023, 09:58:05 » |
|
I noticed coming through Wokingham this morning there was a graffitied train in the siding. Is that the same one?
Yes, it's been there all along. SWR» must be really short of space. But after the first bit of painting on each side I've seen no more. So maybe the signal box really is a deterrent. A Class 701 that SWT▸ don't want, SE Trains have taken some but I think they are finding it cheaper to refurb 465/6's
|
|
|
Logged
|
Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,β
|
|
|
|