Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 16:55 30 Dec 2024
 
- Replacement 'green' ferry emits more CO2 than old diesel ship
- What we know so far
- The driver who 'jumped' his bus over the Tower Bridge gap
- Gatwick flights returning to normal after fog
- Avanti West Coast strike to hit New Year's Eve trains
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 01/01/25 - Railway 200 'Whistle Up' UK
09/01/25 - Bath Railway Society
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end

On this day
30th Dec (1956)
Liverpool Overhead Railway closed (link)

Train RunningDelayed
16:48 London Paddington to Swansea
17:03 London Paddington to Penzance
17:30 London Paddington to Taunton
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
December 30, 2024, 16:57:28 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[128] The Wider Picture - making it wider, but also clearer, hopeful...
[97] Working from roam: more people logging on from UK airports and...
[55] Weekend of 28th/29th December - Coffee Shop offline for engine...
[51] Terrible signalling error!
[44] Southern Railway to axe toilets from new train (BBC News 19/09...
[29] 'Railway 200' events and commemorations 2025
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 2 3 [4] 5 6 ... 10
  Print  
Author Topic: Dawlish - permanent resilience work - ongoing discussions  (Read 77789 times)
paul7575
Transport Scholar
Hero Member
******
Posts: 5333


View Profile
« Reply #45 on: September 12, 2020, 13:57:56 »

Not reported previously I think, but Teignbridge district have now approved the Dawlish phase 2 works, (Coastguards to Collonades and Dawlish station section), the detailed letter on their planning website dates from 01 Sep.

Planning details can be found here, there are a few updated drawings:

Application reference:  20/00933/NPA
Address:  Coastguards Breakwater To Colonnades Breakwater And Dawlish Railway Station, Station Road, Dawlish, Devon, EX7 9PJ

https://www.teignbridge.gov.uk/planning/planning-applications-and-appeals/view-and-comment-on-planning-applications-and-appeals/

The Network Rail webpage has also been updated to reflect approval:

https://www.networkrail.co.uk/running-the-railway/our-routes/western/south-west-rail-resilience-programme/dawlish-sea-wall-section-two/

Paul
« Last Edit: September 12, 2020, 14:17:54 by paul7755 » Logged
Surrey 455
Hero Member
*****
Posts: 1269


View Profile
« Reply #46 on: September 26, 2020, 19:12:49 »

From BBC» (British Broadcasting Corporation - home page) news with photos
Quote
A railway line that washed into the sea in 2014 will be protected "for generations to come" by a new wall, Rail Minister Chris Heaton-Harris said.
The minister officially opened the first section of the new structure in Dawlish, Devon, on Friday.
The wall forms part of an ?80m Network Rail project to safeguard the line which connects Devon and Cornwall with the rest of the rail network.
Repairs to the track, damaged in storms six years ago, cost ?40m.
Mr Heaton-Harris said: "Our investment in this new sea wall will provide a resilient railway for generations to come, delivering for the thousands of passengers that rely upon this vital link every day, and the residents whose homes and businesses must be protected.

Continues..........."
Logged
Jamsdad
Sr. Member
****
Posts: 201


View Profile Email
« Reply #47 on: October 15, 2020, 17:46:50 »

More delays..
https://www.bbc.co.uk/news/uk-england-devon-54538258

It is not that difficult to engineer a gentle slope into the sea in front of the wall to ensure a sandy beach is still present. Sadly few people in the general public have much understanding of soft sediment coastal engineering!
Logged
REVUpminster
Hero Member
*****
Posts: 556



View Profile Email
« Reply #48 on: October 22, 2020, 10:48:19 »

More delays..
https://www.bbc.co.uk/news/uk-england-devon-54538258

It is not that difficult to engineer a gentle slope into the sea in front of the wall to ensure a sandy beach is still present. Sadly few people in the general public have much understanding of soft sediment coastal engineering!

The engineers got it wrong at Dawlish Warren and doesn't inspire confidence.

https://www.devonlive.com/news/devon-news/environment-agency-admits-made-dawlish-3660561

The only way to secure the railway is to remove any physical connection with the cliff face.

dlr - Copy by Robert, on Flickr

Picasso knocked this up for me. Retains the beach except for the piers. If the cliff face is cut back there would be more beach for the rocks to fall on.

Logged
GBM
Transport Scholar
Hero Member
******
Posts: 1674


View Profile Email
« Reply #49 on: October 25, 2020, 10:11:01 »

Sorry, Picasso?  Your dog is called that!  Grin Grin
Logged

Personal opinion only.  Writings not representative of any union, collective, management or employer. (Think that absolves me...........)
IndustryInsider
Data Manager
Hero Member
******
Posts: 10357


View Profile
« Reply #50 on: October 31, 2020, 13:41:04 »

In addition to the sea wall works, the ?Dawlish Special Mode? has now been enabled on the Class 802 fleet.  Basically drivers engage it when instructed to and if a main circuit earthing is detected it allows up to ten engine restart attempts (rather than the normal two) before the engine goes out of service.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
grahame
Administrator
Hero Member
*****
Posts: 43000



View Profile WWW Email
« Reply #51 on: October 31, 2020, 13:53:41 »

In addition to the sea wall works, the 'Dawlish Special Mode' has now been enabled on the Class 802 fleet.  Basically drivers engage it when instructed to and if a main circuit earthing is detected it allows up to ten engine restart attempts (rather than the normal two) before the engine goes out of service.

I would have read that with a pinch of salt ... except that I read elsewhere that a number of IETs (Intercity Express Train) have engines shut down at the moment and "more trains than normal requiring maintenance" at the same time.  Seeing that reason on JourneyCheck when there's a reduced timetable - few superfasts and fewer Cardiff services (Parkway these weeks) suggests there's something more than just the standard ebb and flow of trains coming in to be looked after. 
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
paul7575
Transport Scholar
Hero Member
******
Posts: 5333


View Profile
« Reply #52 on: November 09, 2020, 14:09:39 »

Visible work on phase 2 now seems to have started, with heavy plant operating on the beach alongside the station to build a raised refuge area for storage between tides.  Not sure if a main contractor has been confirmed yet, although I only did a very quick search on Google.

However the ?wave walker? (the self positioning jack up barge mentioned in the planning application) has arrived on site.

Paul

Logged
infoman
Hero Member
*****
Posts: 1477


View Profile
« Reply #53 on: November 10, 2020, 07:06:52 »

BBC» (British Broadcasting Corporation - home page) Spotlight news for the South West of England are reporting on the arrival of the oil type platform on site at 06:55am on tuesday morning as mentioned above

No film footage shown,might get some on the 13:30pm lunch time news or the 18:30pm evening news.

Just a reminder, as always, BBC local news is available for TWENTY FOURS only.
Logged
Thatcham Crossing
Transport Scholar
Hero Member
******
Posts: 793


View Profile
« Reply #54 on: November 10, 2020, 08:01:33 »

Dawlish Beach Cams have a video up of some of the aforementioned prep work and the arrival of the "wave walker" here: https://www.youtube.com/watch?v=v-2hBedMZpw

Old shipping containers being used to build a protective area for plant.
Logged
chuffed
Transport Scholar
Hero Member
******
Posts: 1541


View Profile
« Reply #55 on: November 10, 2020, 11:54:49 »

Wouldn't some old pacer units have worked just as well ?? Tongue
Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4504


View Profile
« Reply #56 on: November 10, 2020, 21:09:44 »

Wouldn't some old pacer units have worked just as well ?? Tongue

They don't stack in the same way
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7367


View Profile
« Reply #57 on: November 10, 2020, 22:09:08 »

I was disappointed. I expected at least stretcher bond.
Logged
Thatcham Crossing
Transport Scholar
Hero Member
******
Posts: 793


View Profile
« Reply #58 on: November 11, 2020, 07:53:17 »

Some great aerial footage of the wave walker on this which just came up in my YT feed https://www.youtube.com/watch?v=PMRGIuAKkvU. It's big!

Dawlish Beach Cams have also posted this one of how it moves https://www.youtube.com/watch?v=yM8XILynlAU.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5333


View Profile
« Reply #59 on: November 11, 2020, 14:35:12 »

Seems now that it is BAM Nuttall that have got the contract for phase 2, as they did for phase 1.

Here is their news item, dated 10th Nov:
https://www.bamnuttall.co.uk/news/wave-walker/

Quote
Network Rail has started work on the second section of the new, bigger sea wall at Dawlish, Devon, to protect the railway and town from rising sea levels, and extreme weather, for generations to come. Construction of this next section of the ?80 million upgrade will take around two years to complete and follows years of detailed studies, designs and joint working between world-leading marine, coastal and railway engineering experts.
The first part, from Dawlish station to the Coastguard breakwater east of the station is expected to be completed in late 2021.The final part between the station and the Colonnade breakwater, which will link up the new wall at Marine Parade, will start to be built shortly after.

Paul
« Last Edit: November 13, 2020, 16:34:17 by paul7755 » Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 2 3 [4] 5 6 ... 10
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page