Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 17:15 30 Dec 2024
 
- Replacement 'green' ferry emits more CO2 than old diesel ship
- What we know so far
- The driver who 'jumped' his bus over the Tower Bridge gap
- Avanti West Coast strike to hit New Year's Eve trains
- Gatwick flights returning to normal after fog
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 01/01/25 - Railway 200 'Whistle Up' UK
09/01/25 - Bath Railway Society
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end

On this day
30th Dec (1956)
Liverpool Overhead Railway closed (link)

Train RunningDelayed
16:48 London Paddington to Swansea
17:03 London Paddington to Penzance
17:30 London Paddington to Taunton
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
December 30, 2024, 17:30:19 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[121] The Wider Picture - making it wider, but also clearer, hopeful...
[91] Working from roam: more people logging on from UK airports and...
[56] Server Map (mark 2) - as from January 2025 - a technical intro...
[51] Weekend of 28th/29th December - Coffee Shop offline for engine...
[48] Terrible signalling error!
[41] Southern Railway to axe toilets from new train (BBC News 19/09...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 7 8 [9]
  Print  
Author Topic: Bristol Resignalling - from Bristol Panel Signal Box to Thames Valley Signal Centre (merged posts)  (Read 58686 times)
rower40
Transport Scholar
Sr. Member
******
Posts: 292

Turning signalling into a video game since 1988.


View Profile
« Reply #120 on: February 15, 2019, 10:06:31 »

Just a heads up.  The final stage of the Bristol area resignalling/recontrol between Bristol(excl) - Chippenham (excl) and Westbury (excl) is taking place over the weekend 11/12 May 2019.

(My bold)
Patchway/Parkway Phase 2, the introduction of Bi-Di through Filton Abbey Wood platform 2, Patchway, and Up Moves being allowed on the Down Tunnel (Patchway to Parkway) and Down Filton Main (Filton Abbey Wood to Parkway) and through Parkway platform 2, due for installation in November 2019.

Railway projects rule #4; there's never enough money to do it properly; there's always enough money to do it twice.
Logged
Zoe
Transport Scholar
Hero Member
******
Posts: 754


View Profile
« Reply #121 on: February 15, 2019, 16:22:01 »

Quote
Project phases
On completion of this work, Bristol Panel remains in service with just the south line from Parson Street towards Taunton. There is a plan to re-open the original terminal platforms at Temple Meads to provide more general capacity for trains terminating here, but the Panel Box occupies the throat. To decommission the panel, proposals are in hand to recontrol Bristol south area to TVSC» (Thames Valley Signalling Centre - about) in CP6 (Control Period 6 - The five year period between 2019 and 2024) after 2019.
I seem to remember that when the full Plymouth/Cornwall scheme got postponed to CP6, there was a plan that when it did go ahead, control would move to Exeter rather than Didcot and that Exeter would also take over Bristol south.  Now that the full Cornish scheme has been delayed at least until CP7 and possibly CP8 (along with Glocuester and Worcester), I wonder what the latest plan for the remaining panel on Bristol PSB (Power Signal Box) is, the article above was written in 2016.
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #122 on: February 15, 2019, 17:03:14 »

Just a heads up.  The final stage of the Bristol area resignalling/recontrol between Bristol(excl) - Chippenham (excl) and Westbury (excl) is taking place over the weekend 11/12 May 2019.

(My bold)
Patchway/Parkway Phase 2, the introduction of Bi-Di through Filton Abbey Wood platform 2, Patchway, and Up Moves being allowed on the Down Tunnel (Patchway to Parkway) and Down Filton Main (Filton Abbey Wood to Parkway) and through Parkway platform 2, due for installation in November 2019.

Railway projects rule #4; there's never enough money to do it properly; there's always enough money to do it twice.
Yes, but thats not really a 'Stage' just tidying up and commissioning parts of a previous one that would have made ready at the original stage. Wink
Logged
johnneyw
Transport Scholar
Hero Member
******
Posts: 2455


From station to station, back to Bristol city....


View Profile
« Reply #123 on: February 16, 2019, 10:42:15 »

Does this herald the fairly imminent closure of the signal control building at Temple Meads next to platform one or is this unrelated?
Logged
Red Squirrel
Administrator
Hero Member
*****
Posts: 5447


There are some who call me... Tim


View Profile
« Reply #124 on: February 16, 2019, 11:05:50 »

Depends on what you call imminent...

Quote
On completion of this work, Bristol Panel remains in service with just the south line from Parson Street towards Taunton. There is a plan to re-open the original terminal platforms at Temple Meads to provide more general capacity for trains terminating here, but the Panel Box occupies the throat. To decommission the panel, proposals are in hand to recontrol Bristol south area to TVSC» (Thames Valley Signalling Centre - about) in CP6 (Control Period 6 - The five year period between 2019 and 2024) after 2019.
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
TonyK
Global Moderator
Hero Member
*****
Posts: 6592


The artist formerly known as Four Track, Now!


View Profile
« Reply #125 on: February 16, 2019, 14:22:59 »

Depends on what you call imminent...

Quote
On completion of this work, Bristol Panel remains in service with just the south line from Parson Street towards Taunton. There is a plan to re-open the original terminal platforms at Temple Meads to provide more general capacity for trains terminating here, but the Panel Box occupies the throat. To decommission the panel, proposals are in hand to recontrol Bristol south area to TVSC» (Thames Valley Signalling Centre - about) in CP6 (Control Period 6 - The five year period between 2019 and 2024) after 2019.


Quote
CP6 after 2019.

Meaning by the end of 2024, unless further delayed. Hopefully, it will be a lot earlier than that.
Logged

Now, please!
Red Squirrel
Administrator
Hero Member
*****
Posts: 5447


There are some who call me... Tim


View Profile
« Reply #126 on: February 16, 2019, 14:37:46 »

There must be a billion pound project in the offing at Temple Meads...

Presumably opening up Platforms 0 and 1 has implications for the Bristol East Junction project, but the old signal box has to go first. It's hard to imagine the new platforms being reopened in isolation from a general redevelopment of the station, which should include opening up the east end of the subway to the new University campus. Then there's Plot 6 - the area to the north-west of the Old Station, which is to form a new main entrance for people coming from central Bristol, the redevelopment of the station incline and, last but not least, the restoration of the spire. You can see why it takes a while to pull these packages together! Let's just hope they manage to sort it all out before the roof collapses.
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
ellendune
Transport Scholar
Hero Member
******
Posts: 4504


View Profile
« Reply #127 on: February 16, 2019, 15:50:41 »

They will need to do at least the work on the roof as well as East Junction before electrification.  I am told that doing the roof after electrification will add 10's of millions to the cost of the roof. 

Logged
TonyK
Global Moderator
Hero Member
*****
Posts: 6592


The artist formerly known as Four Track, Now!


View Profile
« Reply #128 on: February 16, 2019, 17:51:40 »

There must be a billion pound project in the offing at Temple Meads...

Presumably opening up Platforms 0 and 1 has implications for the Bristol East Junction project, but the old signal box has to go first. It's hard to imagine the new platforms being reopened in isolation from a general redevelopment of the station, which should include opening up the east end of the subway to the new University campus. Then there's Plot 6 - the area to the north-west of the Old Station, which is to form a new main entrance for people coming from central Bristol, the redevelopment of the station incline and, last but not least, the restoration of the spire. You can see why it takes a while to pull these packages together! Let's just hope they manage to sort it all out before the roof collapses.

Very much chicken and egg. I don't think platforms 0 and 1 will really depend on East Bristol being remodelled. The trains from there will primarily be London bound, via Parkway, so under diesel power, I can't see how they couldn't cope with the present layout. But the junction certainly needs to be altered to get the best from the four-tracking, and surely Filton Bank must be electrified at the same time. All of the preparation has been done.
Logged

Now, please!
Red Squirrel
Administrator
Hero Member
*****
Posts: 5447


There are some who call me... Tim


View Profile
« Reply #129 on: February 16, 2019, 18:22:09 »

Very much chicken and egg.

Platform 0 will need at least some new track to be laid. It is very hard to imagine that track being just kludged into the existing layout; isn't it much more likely that it will either be installed and signalled, or passively provided for, as part of the Bristol East project?

 
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
Red Squirrel
Administrator
Hero Member
*****
Posts: 5447


There are some who call me... Tim


View Profile
« Reply #130 on: February 16, 2019, 18:40:04 »

Further to that:

Quote

Bristol East Junction Enhanced Renewal and Remodelling

Project reference code: W015
HLOS (High Level Output Specification) driver: City capacity – Bristol
Operating route: Western
Last updated: March 2017

CP5 (Control Period 5 - the five year period between 2014 and 2019) output driver

To deliver improvements to the existing junction layout east of Bristol Temple Meads to meet current and future forecast demand, specifically the enhanced train service specifications for both the long distance and local cross-Bristol services in both directions across the greater Bristol area.

Scope of works

• Reduction of existing 58 point ends to 47 point ends
• Minor civils; waterproofing of Avon Street and structure deck replacement
• HV cable diversion – runs under two tracks on the up side
• Junction lighting – for safer maintenance activities
• Inclusion of a new transformer due to increased power usage
• Demolition of lineside buildings
• All associated signalling works inclusive of a data change (79 SEUs)
• Minor telecoms works
• Signalling gantry renewal (electrification scope)

Interfaces and assumptions

There are significant CP5 schemes linked to this project. Other interfacing schemes and their potential impact are:
• Bristol Area Signalling Renewals and Enhancements (BASRE (Bristol Area Signalling Renewal and Enhancement))
• Dr Days to Filton Abbey Wood Capacity Scheme
• Great Western Main Line electrification (GWMLe)
• Bristol Temple Platform Capacity Scheme
• MetroWest

The following critical assumptions on internal factors are being made:

• Bristol Area Signalling Renewal is a core interface to this project, particularly the phase to re-signal Bristol Temple Meads station which needs to precede this project.
• A staging area at Bristol East Depot is available

The following critical assumptions on external factors are being made:

• Bristol Temple Meads is a combination of Grade 1 & 2 listed buildings; it is assumed the infrastructure changes required to meet the growth demand will be accepted by Historic England, Local Conservation Officers and other key stakeholders following consultation
• Access will be granted to meet the programme
• Network Change will not be unreasonably withheld or delayed
• Funding is available in CP6 (Control Period 6 - The five year period between 2019 and 2024)

Activities and milestones (NR» (Network Rail - home page))

MilestoneDescriptionDateStatus
GRIP (Guide to Railway Investment Projects) 6 startStart on siteCP6Indicative
GRIP 6 completionInfrastructure ready for useCP6Indicative
EIS (Enters Into Service) Infrastructure authorisedInfrastructure authorised for passenger useCP6Regulated Output

Source: Network Rail - Enhancements Delivery Plan December 2018

Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
martyjon
Transport Scholar
Hero Member
******
Posts: 1941


View Profile
« Reply #131 on: February 16, 2019, 19:28:40 »

Very much chicken and egg.
Platform 0 will need at least some new track to be laid. It is very hard to imagine that track being just kludged into the existing layout; isn't it much more likely that it will either be installed and signalled, or passively provided for, as part of the Bristol East project?

Track will be required to serve both platforms 0 and 1 in the old train shed, platform 1 by extending the existing platform 1 track and platform 0 bt extending the existing 'Bristol High Level Siding', the siding alongside the platform 1 line which is used regularly to stable units.
Logged
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #132 on: February 16, 2019, 19:44:15 »

What on earth is
Quote
Bristol Temple Platform Capacity Scheme
?
Logged

Waiting at Pilning for the midnight sleeper to Prague.
Red Squirrel
Administrator
Hero Member
*****
Posts: 5447


There are some who call me... Tim


View Profile
« Reply #133 on: February 16, 2019, 20:23:55 »

I'm guessing it's W008, on p96 of the same document...
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
Red Squirrel
Administrator
Hero Member
*****
Posts: 5447


There are some who call me... Tim


View Profile
« Reply #134 on: August 16, 2021, 11:22:05 »

Does anyone have an update on Bristol PSB (Power Signal Box)? Last I heard it still controlled Nailsea to Bridgwater. For how much longer?
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 7 8 [9]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page